← Back
Primarily 4 family with 1 store or office
25 SCHERMERHORN STREET
BROOKLYN · Brooklyn Heights · BIN 3002607
💬 Discuss this project
1857Year Built
3Stories
S4Building Class
R6Zoning
5,850 sfGross Floor Area
5Units
Rent Stabilized12 Open Violations ▸
Primarily 4 family with 1 store or office · Owner of record: 25 SCHERM LLC · 2,350 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof73p · 5 filings · 20 docs
Floor 475p · 5 filings · 20 docs
Floor 374p · 5 filings · 20 docs
Floor 275p · 5 filings · 20 docs
Floor 172p · 5 filings · 20 docs
Cellar64p · 5 filings · 20 docs
Basement22p · 1 filing · 15 docs
Sub-Basement50p · 4 filings · 20 docs
Site & exterior14p · 1 filing · 20 docs
Filed — no permit issued9p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
25 SCHERM LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2025$11.2M—— → —$1,915/sf building
09/25/2020$4.3M—— → —$731/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEEL CORE ENGINEERING PLLC809/30/2024
SATWIN ARCHITECT, PC803/14/2024
NY BUILDING ASSOCIATES INC101/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SATWIN ARCHITECT, PC3203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor507/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613909/30/2024
SATWIN ARCHITECT, PC7107503/14/2024
NKM ENGINEERING PLLC6244101/25/2024
Building Lifecycle
All (165)Filed (17)Permit Issued (9)Signed Off (5)Violation (20)Inspection (12)Objection (72)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
11/07/2024
Signed off — Alteration
Plumbing work on floors CEL, BAS, 001, 002, 003, 004 and Roof. In conjunction with Application B00638442-I1.
B00501323-I1
10/30/2024
Signed off — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00993344-I1
10/29/2024
Signed off — Alteration
INSTALLATION OF SP HEADS AS PER PLANS.
B00965679-I1
10/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/04/2024
Signed off — Alteration
NEW HVAC SYSTEMS FOR RESIDENTIAL BUILDING. NO CHANGE IN BUILDING BULK, OCCUPANCY, USE OR EGRESS
B00693470-I1
10/02/2024
Special inspection requirement — Final
Fran Huang
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
10/02/2024
Special inspection requirement — Heating Systems
Fran Huang
10/02/2024
Special inspection requirement — Mechanical Systems
Fran Huang
10/01/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2024
Filed — Alteration
NEW HVAC SYSTEMS FOR RESIDENTIAL BUILDING. NO CHANGE IN BUILDING BULK, OCCUPANCY, USE OR EGRESS
B00693470-P3
09/19/2024
Special inspection requirement — Final
Fran Huang
09/19/2024
Special inspection requirement — Mechanical Systems
Fran Huang
09/19/2024
Special inspection requirement — Heating Systems
Fran Huang
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2024
Signed off — Alteration
RE-FRAMING OF EXISTING FLOORS AND ROOF STRUCTURE. NEW BACKYARD PORCH. NO CHANGE IN BUILDING BULK, OCCUPANCY, USE OR EGRESS
B00693485-I1
04/11/2024
Violation issued (HPD, open)
A
03/21/2024
Objection resolved — Addressed
03/19/2024
Filed — Alteration
NEW HVAC SYSTEMS FOR RESIDENTIAL BUILDING. NO CHANGE IN BUILDING BULK, OCCUPANCY, USE OR EGRESS
B00693470-P2
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/19/2024
Special inspection requirement — Heating Systems
Fran Huang
03/19/2024
Special inspection requirement — Mechanical Systems
Fran Huang
03/19/2024
Special inspection requirement — Final
Fran Huang
03/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/14/2024
Filed — Alteration
Plumbing work on floors CEL, BAS, 001, 002, 003, 004 and Roof. In conjunction with Application B00638442-I1.
B00501323-P5
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Marta Satwin-Ramberg
03/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Marta Satwin-Ramberg
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Marta Satwin-Ramberg
02/22/2024
Objection resolved — Addressed
02/01/2024
Objection raised — Admin
01/31/2024
Objection raised — Admin
01/30/2024
Permit issued — Mechanical Systems
B00693470-I1-MS
01/29/2024
Permit issued — General Construction
B00638442-I1-GC
01/29/2024
Permit issued — Solar
B00993344-I1-SL
01/25/2024
Filed — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00993344-I1
01/25/2024
Filed — Alteration
RE-FRAMING OF EXISTING FLOORS AND ROOF STRUCTURE. NEW BACKYARD PORCH. NO CHANGE IN BUILDING BULK, OCCUPANCY, USE OR EGRESS
B00693485-P1
01/19/2024
Permit issued — Plumbing
B00501323-I1-PL
01/19/2024
Permit issued — Sprinklers
B00965679-I1-EW-SP
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/19/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
01/19/2024
Special inspection requirement — Final
NARESH MAHANGU
01/11/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Admin
01/05/2024
Filed — Alteration
INSTALLATION OF SP HEADS AS PER PLANS.
B00965679-I1
01/03/2024
Filed — Alteration
Plumbing work on floors CEL, BAS, 001, 002, 003, 004 and Roof. In conjunction with Application B00638442-I1.
B00501323-P4
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Marta Satwin-Ramberg
01/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Marta Satwin-Ramberg
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Marta Satwin-Ramberg
12/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/26/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION01/30/2024
DOB NOWGeneral ConstructionPermit IssuedMEGA GENERAL CONSTRUCTION01/29/2024
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC01/29/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/19/2024
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN01/19/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/27/2023
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION01/25/2023
DOB NOWGeneral ConstructionPermit IssuedMEGA GENERAL CONSTRUCTION01/24/2023
DOB NOWStructuralSigned-offMEGA GENERAL CONSTRUCTION12/07/2022
2 projects · most recent 03/07/2024
General Wiring
FiledStatusContractorScope
03/07/2024CompleteKJK ELECTRIC INCGeneral Wiring
01/22/2024CompleteBROOKYLN SOLARWORKS, LLC—
1 project · most recent 08/26/2021
Steel Wood
FiledStatusContractorScope
08/26/2021——Steel, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/26/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/02/2024FinalFran Huangprogress
10/02/2024Fire-Resistant Penetrations and JointsFran Huangspecial
10/02/2024Heating SystemsFran Huangspecial
10/02/2024Mechanical SystemsFran Huangspecial
09/19/2024FinalFran Huangprogress
09/19/2024Mechanical SystemsFran Huangspecial
09/19/2024Heating SystemsFran Huangspecial
09/19/2024Fire-Resistant Penetrations and JointsFran Huangspecial
03/19/2024Fire-Resistant Penetrations and JointsFran Huangspecial
03/19/2024Heating SystemsFran Huangspecial
03/19/2024Mechanical SystemsFran Huangspecial
03/19/2024FinalFran Huangprogress
03/05/2024Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
03/05/2024HVAC-R and service water piping design and insulationMarta Satwin-Rambergenergy_progress
03/05/2024Fire-Resistant Penetrations and JointsMarta Satwin-Rambergspecial
01/19/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/19/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/19/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/19/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
01/19/2024FinalNARESH MAHANGUprogress
01/02/2024Fire-Resistant Penetrations and JointsMarta Satwin-Rambergspecial
01/02/2024HVAC-R and service water piping design and insulationMarta Satwin-Rambergenergy_progress
01/02/2024Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
05/17/2023Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
05/17/2023HVAC-R and service water piping design and insulationMarta Satwin-Rambergenergy_progress
Latest 25 of 36.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/01/2026B00501323-P3Request digital key ↗
09/01/2026B00501323-P5Request digital key ↗
09/01/2026B00501323-P4Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit16
08/14/2026B00500748-I1Open ↗
08/14/2026B00693485-I1Open ↗
08/14/2026B00500748-S1Open ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00638442-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B00501323-P3Open ↗
08/31/2026B00693470-P3Open ↗
08/31/2026B00693470-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00500748-I1Open ↗
09/01/2026B00500748-S1Open ↗
08/27/2026B00693470-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00501323-P3Open ↗
09/01/2026B00501323-P3Open ↗
08/31/2026B00693470-P3Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/26/2026B00638442-P1Open ↗
08/15/2026B00638442-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00993344-I1Open ↗
08/14/2026B00500748-I1Open ↗
08/14/2026B00500748-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026B00965679-I1Open ↗
08/15/2026B00693470-I1Open ↗
08/15/2026B00638442-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00501323-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00993344-I1Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building6
08/13/2026B00638442-I1Open ↗
08/13/2026B00638442-P1Open ↗
08/13/2026B00693470-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification2
08/26/2026B00638442-P1Open ↗
08/15/2026B00638442-I1Open ↗