← Back
BuildNYC
Two family frame
25 SOUTH AVENUE
STATEN ISLAND · BIN 5028210
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
1,228 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: 25 South AV 4 Partners · 3,100 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic14p · 2 filings · 19 docs
Floor 214p · 2 filings · 19 docs
Floor 19 foot curb cut application17p · 4 filings · 20 docs
Basement2p · 1 filing · 19 docs
Sub-Basement14p · 2 filings · 19 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Zaim807/08/2026
SH Zaim Contracting203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture506/15/2022
Chris Ponisi, Architect101/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dawn Ponisi103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zaim ContractorGeneral Contractor407/08/2026
Zaim ContractorScaffold203/21/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
Quality PlumbingPlumbing107/08/2026
Building Lifecycle
11/22/2022
Signed off — Alteration
PLUMBING FOR NEW 2 FAMILY HOUSE
S00448332-I1
10/28/2022
Signed off — Alteration
APPLICATION FILED FOR CONSTRUCTION FENCE TO BE CONSTRUCTED AT PERIMETER OF PROPERTY INSIDE PROPERTY LINE
S00452511-I1
08/12/2022
Signed off — Alteration
S00448344-I1
08/12/2022
Signed off — Alteration
S00448355-I1
07/21/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSuffolk Construction07/14/2022
DOB NOWCurb CutSigned-offSuffolk Construction07/14/2022
DOB NOWPlumbingSigned-offQuality Plumbing01/12/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating12/07/2021
DOB NOWConstruction FenceSigned-offSuffolk Construction01/13/2021
BIS—ISSUEDZaim Contractor09/16/2021
BIS—ISSUEDZaim Contractor02/08/2021
1 project · most recent 12/17/2021
General Wiring
FiledStatusContractorScope
12/17/2021CompleteRidge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/21/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/20/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/29/2022HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
06/29/2022HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
06/29/2022HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
06/29/2022Maintenance informationDaniel Ryanenergy_progress
06/09/2022HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
06/09/2022Maintenance informationDaniel Ryanenergy_progress
06/09/2022HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
06/09/2022HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
04/28/2022HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
04/28/2022HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
04/28/2022Maintenance informationDaniel Ryanenergy_progress
04/28/2022HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
127 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account