← Back
BROOKLYN
25 SPARROW WAY
BROOKLYN · BIN 3430115
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction86p · 1 filing · 20 docs
Floor 11Under Construction61p · 1 filing · 20 docs
Floor 10Under Construction74p · 1 filing · 20 docs
Floor 9Under Construction70p · 1 filing · 20 docs
Floor 8Under Construction70p · 1 filing · 20 docs
Floor 7Under Construction306p · 1 filing · 20 docs
Floor 6Under Construction305p · 1 filing · 20 docs
Floor 5Under Construction305p · 1 filing · 20 docs
Floor 4Under Construction305p · 1 filing · 20 docs
Floor 3Under Construction307p · 1 filing · 20 docs
Floor 2Under Construction327p · 1 filing · 20 docs
Floor 1Under Construction315p · 1 filing · 20 docs
CellarUnder Construction322p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLASTON DEVELOPMENT3309/13/2026
COSAN CONSTRUCTION109/03/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREA HERRERA108/18/2026
JRS ENGINEERING SERVICES108/10/2026
DAGHER ENGINEERING PLLC608/04/2026
TOHFAZ UDDIN PE PC305/19/2026
GGA STUDIOS, DPC105/06/2026
LANGAN ENGINEERING204/08/2026
HILL WEST ARCHITECTS203/31/2026
VHB302/25/2026
MCNAMARA SALVIA OF NEW YORK, PC204/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2203/21/2026
SPRING SCAFFOLDING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.E. LEVINE BUILDER INCGeneral Contractor907/30/2026
COSAN CONSTRUCTION CORPGeneral Contractor209/03/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
FORWARD MECHANICAL CORPPlumbing208/26/2026
G.N.T. MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LANGAN ENG, ENV, SURVEYIN1265304/08/2026
AMARACON TESTING & INSPEC5842703/31/2026
MCNAMARA/SALVIA OF NEW YO4970204/24/2024
Building Lifecycle
All (100)Filed (21)Permit Issued (16)Violation (2)Inspection (1)Objection (30)Special Inspection (30)
09/02/2026
Permit issued — Supported Scaffold
B01441776-I1-SF
08/19/2026
Permit issued — Protection and Mechanical Methods
B01444760-I1-PMM
08/18/2026
Filed — Alteration
B01444760-I1
08/10/2026
Filed — Alteration
Supported Pipe Scaffolding
B01441776-I1
08/04/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00848002-I1
B00848002-P3
07/29/2026
Permit issued — General Construction
B00848002-I1-GC
07/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/14/2026
Permit issued — Plumbing
B00848002-S9-PL
06/09/2026
Permit issued — Protection and Mechanical Methods
B01323688-S4-PMM
06/02/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00848002-I1
B00848002-S9
05/29/2026
Permit issued — General Construction
B01363057-I1-GC
05/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS FRONT OF THE BUILDING AND BACK OF THE BUILDING ELEVATIONS. IN CONJUNCTION WITH NEW BUILDINGS B00848002
B01323688-S4
05/19/2026
Permit issued — Support of Excavation
B00848002-S5-SE
05/18/2026
Permit issued — General Construction
B01398314-I1-GC
05/06/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO ADDRESS VIOLATION #'s: 039553460Y AND 039553464L. SCOPE OF WORK INCLUDES REMOVAL OF REMNANTS FROM PRIOR DEMOLITION ACTIVITIES 20 YEARS AGO AT VARIOUS LOCATIONS AS INDICATED ONPLANS.
B01398314-I1
05/06/2026
Special inspection requirement — Final
LESLEY SCHMERZLER
04/30/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
04/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
CONNIE PISANI
04/27/2026
Special inspection requirement — Luminous Exit Path Markings
CONNIE PISANI
04/27/2026
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
04/27/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
CONNIE PISANI
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration areas
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/27/2026
Special inspection requirement — Vestibules
CONNIE PISANI
04/27/2026
Special inspection requirement — Protection of exposed foundation insulation
CONNIE PISANI
04/27/2026
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
04/27/2026
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
04/27/2026
Special inspection requirement — Air barrier — testing
CONNIE PISANI
04/27/2026
Special inspection requirement — Air barrier continuity plan testing
CONNIE PISANI
04/27/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
CONNIE PISANI
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/24/2026
Violation issued (ECB, closed)
Construction
04/24/2026
Violation issued (ECB, closed)
Construction
04/15/2026
Objection resolved — Addressed
04/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Saul Shapiro
04/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
04/14/2026
Special inspection requirement — Subgrade Inspections
Saul Shapiro
04/13/2026
Objection raised — Other
04/10/2026
Permit issued — Support of Excavation
B00848002-S5-SE
04/10/2026
Permit issued — Foundation
B00848002-S3-FO
04/08/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00848002-I1
B00848002-P2
04/01/2026
Objection resolved — Addressed
03/31/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00848002-I1
B00848002-P1
03/19/2026
Permit issued — General Construction
B01363057-I1-GC
03/18/2026
Permit issued — Standpipe
B00848002-S7-EW-SD
03/16/2026
Permit issued — Plumbing
B01363057-S1-PL
02/25/2026
Filed — Alteration
SHP2 - FILING FOR CIVIL SITE WORK PLUMBING COMPONENTS IN CONJUCTION WITH NEW BUILDING B00848002-I1
B01363057-I1
02/25/2026
Filed — Alteration
SHP2 - FILING FOR CIVIL SITE WORK PLUMBING COMPONENTS IN CONJUCTION WITH NEW BUILDING B00848002-I1
B01363057-S1
02/20/2026
Special inspection requirement — Final
CONNIE PISANI
02/18/2026
Permit issued — Support of Excavation
B00848002-S5-SE
02/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS FRONT OF THE BUILDING AND BACK OF THE BUILDING ELEVATIONS. IN CONJUNCTION WITH NEW BUILDINGS B00848002
B01323688-P1
02/11/2026
Permit issued — Foundation
B00848002-S3-FO
02/04/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00848002-I1
B00848002-S7
12/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS FRONT OF THE BUILDING AND BACK OF THE BUILDING ELEVATIONS. IN CONJUNCTION WITH NEW BUILDINGS B00848002
B01323688-I1
12/29/2025
Permit issued — Sidewalk Shed
B01323688-I1-SH
12/18/2025
Special inspection requirement — Lighting in dwelling units
CONNIE PISANI
12/18/2025
Special inspection requirement — Maintenance information
CONNIE PISANI
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION CORP09/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOSAN CONSTRUCTION CORP08/19/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC07/29/2026
DOB NOWPlumbingPermit IssuedFORWARD MECHANICAL CORP07/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC06/09/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/29/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC05/19/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/18/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC04/10/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC04/10/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC03/19/2026
DOB NOWStandpipePermit IssuedG.N.T. MECHANICAL LLC03/18/2026
DOB NOWPlumbingPermit IssuedFORWARD HEATING CORP03/16/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC02/18/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC02/11/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC12/29/2025
1 project · most recent 08/04/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Permit IssuedJ.E. LEVINE BUILDER INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A36NKA7 36,000 BTU · Vrf Outdoor ×4
Heating
Mitsubishi Electric PUHY-P96TNU-A 108,000 BTU · Vrf Outdoor ×3
PURY-P96TNU-A 108,000 BTU · Vrf Outdoor ×2
PUHY-P168TNU-A 188,000 BTU · Vrf Outdoor ×1
PUHY-P72TNU-A 80,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE-1XJINH-S15EE-GNT-L 670 CFM · Erv ×1
HE-3XJINH-S35VV-ANT-L 1,315 CFM · Erv ×1
Swegon RX-012 760 CFM · Erv ×1
RX-050 3,545 CFM · Erv ×1
1 project · most recent 08/04/2026
Sprinkler System
FiledStatusContractorScope
08/04/2026——Sprinkler System
1 project · most recent 08/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedFORWARD MECHANICAL CORPGas, Storm, Water/Sanitary
2 projects · most recent 09/15/2026
FiledStatusContractorScope
09/15/2026Permit IssuedEMPIRE STATE ELECTL CORP—
11/24/2025Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 08/04/2026
Concrete Masonry
FiledStatusContractorScope
08/04/2026Permit IssuedJ.E. LEVINE BUILDER INCConcrete, Masonry
2 projects · most recent 08/10/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/10/2026Permit IssuedCOSAN CONSTRUCTION CORPScaffold
05/19/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/29/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/06/2026FinalLESLEY SCHMERZLERprogress
04/30/2026Emergency and Standby Power Systems (Generator)—special
04/27/2026Exterior Insulation and Finish Systems (EIFS)CONNIE PISANIspecial
04/27/2026Luminous Exit Path MarkingsCONNIE PISANIspecial
04/27/2026Sprayed fire-resistant materialsCONNIE PISANIspecial
04/27/2026Mastic and Intumescent Fire-resistant CoatingsCONNIE PISANIspecial
04/27/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
04/27/2026Fire-Resistance Rated ConstructionCONNIE PISANIprogress
04/27/2026Fenestration areasCONNIE PISANIenergy_progress
04/27/2026Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
04/27/2026VestibulesCONNIE PISANIenergy_progress
04/27/2026Protection of exposed foundation insulationCONNIE PISANIenergy_progress
04/27/2026Insulation placement and R valuesCONNIE PISANIenergy_progress
04/27/2026Fenestration air leakageCONNIE PISANIenergy_progress
04/27/2026Air barrier - visual inspectionCONNIE PISANIenergy_progress
04/27/2026Air barrier — testing CONNIE PISANIenergy_progress
04/27/2026Air barrier continuity plan testingCONNIE PISANIenergy_progress
04/27/2026Wall Panels, Curtain Walls, and VeneersCONNIE PISANIspecial
04/27/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
04/14/2026Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
04/14/2026Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
04/14/2026Subgrade InspectionsSaul Shapirospecial
02/20/2026FinalCONNIE PISANIprogress
12/18/2025Lighting in dwelling unitsCONNIE PISANIenergy_progress
12/18/2025Maintenance informationCONNIE PISANIenergy_progress
Latest 25 of 46.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/23/2026B00848002-S2Request digital key ↗
08/19/2026B01444760-I1Request digital key ↗
08/18/2026B01363057-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/29/2025340917501Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/21/2025340917501Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00848002-I1Open ↗
08/13/2026B00848002-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B00848002-P1Open ↗
08/15/2026B00848002-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/19/2026B01444760-I1Open ↗
08/18/2026B01363057-I1Open ↗
08/18/2026B01363057-S1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/18/2026B00848002-S5Open ↗
09/18/2026B00848002-S5Open ↗
09/18/2026B00848002-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01398314-I1Open ↗
08/31/2026B01363057-I1Open ↗
08/30/2026B00848002-S4Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/21/2025340917501Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/21/2025340917501Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00848002-I1Open ↗
08/13/2026B00848002-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B00848002-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026B00848002-P1Open ↗
08/15/2026B00848002-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00848002-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/21/2025340917501Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/21/2025340917501Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/21/2025340917501Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/21/2025340917501Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00848002-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00848002-S3Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/19/2026B01444760-I1Open ↗
08/16/2026B01323688-S4Open ↗
08/16/2026B01323688-I1Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/21/2025340917501Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/13/2026B00848002-I1Open ↗
08/13/2026B00848002-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00848002-P1Open ↗
08/13/2026B00848002-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00848002-S5Open ↗