← Back
BuildNYC
Large suburban residence
25 SPRAGUE COURT
STATEN ISLAND · BIN 5135887
💬 Discuss this project
2002Year Built
2.5Stories
A3Building Class
R3XZoning
6,790 sfGross Floor Area
1Units
0 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Large suburban residence · 35,029 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorPool seepage pits7p · 2 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect503/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Contracting P&HPlumbing607/02/2026
HI Voltage ElectricElectrical103/22/2026
AJC RenovationsGeneral Contractor107/08/2026
Air-MechinicalGeneral Contractor309/01/2004
Dynamic ContractingPlumbing112/02/2002
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738403/13/2026
Steven R. Savino1216103/10/2025
Building Lifecycle
06/30/2026
Permit renewed — Plumbing
Renewed without changes
S01191808-I1-PL
05/01/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01191734-I1-GC
03/13/2026
Filed — Alteration
Installation of seepage pits with associated piping for the in-ground pool and gas piping for a pool heater.
S01191808-P3
03/13/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
03/13/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
anthony santoro
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCapital Contracting P&H06/30/2026
DOB NOWPlumbingPermit IssuedCapital Contracting P&H05/08/2025
DOB NOWGeneral ConstructionPermit IssuedAJC Renovations05/01/2025
BIS—ISSUEDAir-Mechinical09/01/2004
BIS—ISSUEDAir-Mechinical03/08/2004
BIS—ISSUEDAir-Mechinical09/05/2003
BISPLISSUEDDynamic Contracting12/02/2002
1 project · most recent 03/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/13/2026Permit IssuedCapital Contracting P&HGas, Storm, Water/Sanitary
1 project · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025CompleteHI Voltage ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/21/2025Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/13/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
03/13/2026On-Site Private Sewage Disposal Systems Installationanthony santorospecial
11/04/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
11/04/2025On-Site Private Sewage Disposal Systems Installationanthony santorospecial
08/15/2025On-Site Private Sewage Disposal Systems Installationanthony santorospecial
08/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
03/10/2025Subgrade InspectionsSteven Savinospecial
03/10/2025Concrete - Cast-In-PlaceSteven Savinospecial
03/07/2025FinalSteven Savinoprogress
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account