← Back
BuildNYC
Elevator cooperative
25 TUDOR CITY PLACE
MANHATTAN · BIN 1038655
💬 Discuss this project
1929Year Built
23.5Stories
D4Building Class
R10Zoning
249,299 sfGross Floor Area
447Units
LL97 CoveredRent Stabilized140 Active Violations 139 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 25 Tudor Owners · 11,653 sf lot · 21.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPrc Management2p · 2 filings · 8 docs
Floor 19Unit 1911, Unit 19122p · 1 filing · 5 docs
Floor 18
Floor 17
Floor 16Unit 1612, Unit 1614, Unit 1619 +15p · 3 filings · 14 docs
Floor 15
Floor 14Unit 1407, Unit 14084p · 1 filing · 7 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 512, Unit 5144p · 1 filing · 7 docs
Floor 4
Floor 3
Floor 2
Floor 1Prc Management2p · 2 filings · 12 docs
CellarPrc Management31p · 3 filings · 20 docs
Sub-CellarPrc Management2p · 2 filings · 17 docs
Site & exteriorPrc Management22p · 8 filings · 20 docs
Filed — no permit issuedProtected bulkhead wraps6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
25 Tudor Owners9203/22/2026
Ufh Apartments203/22/2026
350 CPW Asso203/21/2026
Vivvi103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bertolini Architectural Works403/21/2026
Enkay Design Consulting603/21/2026
CCM Services Group103/21/2026
KM Associates of New York103/21/2026
Green Light Expediting403/21/2026
GC1 Expediting203/21/2026
AE Design Solution803/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Upgrade Contracting CoScaffold1807/08/2026
Everest ScaffoldingScaffold1307/08/2026
Andamio ScaffoldingScaffold1307/08/2026
EA Associates GroupGeneral Contractor1007/08/2026
BirchwoodGeneral Contractor307/08/2026
Taylor Made ContractingGeneral Contractor303/21/2026
CYC General ContractingGeneral Contractor303/21/2026
Third Generation ElectricElectrical203/22/2026
CRM ElectricElectrical203/21/2026
Delta Star ElectricElectrical103/21/2026
Davrial EnterprisesGeneral Contractor107/08/2026
Dycon EnterprisesGeneral Contractor107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Lippolis ElectricElectrical103/21/2026
Zatos Plumbing and HeatingPlumbing107/08/2026
Cresco ElectricalElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Applied ElectricElectrical103/21/2026
Jack Verrelli ElectricElectrical103/21/2026
Pac ElectricElectrical103/22/2026
Fiu Corp Dba Fiu ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422210/07/2026
R Marsac Consulting329205/03/2024
Metro Inspections7363206/23/2023
Orzechowski Architect PLL8235206/23/2023
Elevated Engineering3692103/04/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/30/2026
Boiler inspection report filed
Initial · defects found · Accepted
10/16/2026
Objection raised — Other
10/07/2026
Filed — Alteration
NEW HVAC INSTALLATION AND ASSOCIATED DUCT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00752612-P1
08/18/2026
Co-op apartment 409 sold for $357,500
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDycon Enterprises09/03/2024
DOB NOWAntennaSigned-offDavrial Enterprises06/14/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/12/2024
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/19/2023
DOB NOWPlumbingSigned-offP.S.I. Mechanical10/05/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedUpgrade Contracting Co09/29/2023
DOB NOWGeneral ConstructionPermit IssuedTaylor Made Contracting09/19/2023
DOB NOWGeneral ConstructionSigned-offBirchwood08/17/2023
DOB NOWGeneral ConstructionSigned-offCYC General Contracting07/05/2023
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co03/23/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/18/2023
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co11/28/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/20/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedUpgrade Contracting Co10/03/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedUpgrade Contracting Co06/17/2022
DOB NOWGeneral ConstructionSigned-offEA Associates Group04/27/2022
DOB NOWGeneral ConstructionSigned-offEA Associates Group04/27/2022
DOB NOWGeneral ConstructionSigned-offEA Associates Group02/25/2022
DOB NOWPlumbingSigned-offZatos Plumbing and Heating02/25/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/20/2022
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co11/23/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/27/2021
DOB NOWGeneral ConstructionSigned-offEA Associates Group07/20/2021
DOB NOWGeneral ConstructionSigned-offBirchwood03/25/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/22/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/18/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/30/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/29/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/20/2020
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co01/31/2020
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co08/21/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/26/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/21/2019
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co08/02/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/31/2018
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding07/24/2018
DOB NOWSupported ScaffoldPermit IssuedUpgrade Contracting Co04/25/2018
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding04/18/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/10/2018
BISOTISSUEDUpgrade Contracting Co10/02/2023
+ 49 more permits on file
2 projects · most recent 10/07/2026
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScope
10/07/2026Permit IssuedDycon EnterprisesAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
03/04/2020——Air Conditioning Systems
1 project · most recent 06/23/2023
Water/Sanitary
FiledStatusContractorScope
06/23/2023Signed-offP.S.I. MechanicalWater/Sanitary
25 projects · most recent 01/14/2025
General Wiring
FiledStatusContractorScope
01/14/2025Permit IssuedFiu Corp Dba Fiu ElectricGeneral Wiring
05/03/2024CompleteAllbright ElectricGeneral Wiring
01/16/2024CompleteS.A.L. Electric Co—
12/14/2023CompleteRal-Bar ElectricGeneral Wiring
10/12/2023Permit IssuedCresco ElectricalGeneral Wiring
07/05/2023Permit IssuedSafetech Electrical ContngGeneral Wiring
06/08/2023CompleteE-J Electric Installation CoGeneral Wiring
03/16/2023CompletePac ElectricGeneral Wiring
10/31/2022CompleteCoda Electro Cont'gGeneral Wiring
09/09/2022CompletePac ElectricGeneral Wiring
05/15/2022CompleteRobert Chimenti—
04/27/2022CompleteGotham Wiring Licensed—
03/11/2022CompletePac ElectricGeneral Wiring
02/04/2022CompleteBerger Quality Electrical ConGeneral Wiring
09/13/2021CompleteMatros Automated Electrical—
1 project · most recent 04/24/2018
Scaffold
FiledStatusContractorScope
04/24/2018Permit IssuedUpgrade Contracting CoScaffold
1 project · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026———
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/28/2025Shutoff dampersJACK GREENenergy_progress
08/28/2025Mechanical SystemsLAWRENCE GREENspecial
08/28/2025Post-installed AnchorsLAWRENCE GREENspecial
08/28/2025Energy Code Compliance InspectionsLAWRENCE GREENprogress
08/28/2025FinalLAWRENCE GREENprogress
08/28/2025Maintenance informationJACK GREENenergy_progress
08/28/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/28/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
08/28/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
06/20/2023Tenant Protection Plan ComplianceWOJCIECH ORZECHOWSKIspecial
06/16/2023Fire-Resistant Penetrations and JointsDANIEL ADLYspecial
06/16/2023Fire-Resistant Penetrations and JointsDANIEL ADLYspecial
06/01/2023FinalNORA ALHASANprogress
05/25/2023FinalNORA ALHASANprogress
04/17/2023Tenant Protection Plan ComplianceWOJCIECH ORZECHOWSKIspecial
06/08/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
06/08/2022Post-installed AnchorsJACK GREENspecial
06/08/2022Energy Code Compliance InspectionsJACK GREENprogress
06/08/2022Maintenance informationJACK GREENenergy_progress
06/08/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
06/08/2022Shutoff dampersJACK GREENenergy_progress
06/08/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
06/07/2022Mechanical SystemsJACK GREENspecial
06/07/2022FinalJACK GREENprogress
01/11/2021FinalNORA ALHASANprogress
Latest 25 of 31.
700 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account