Office with commercial, 7-19 stories
25 WEST 36 STREET
MANHATTAN · Midtown-Times Square · BIN 1015927
💬 Discuss this project
1925Year Built
12Stories
O6Building Class
M1-9A/R12Zoning
39,848 sfGross Floor Area
13Units
LL97 Covered9 Open Violations 8 unresolved · 1 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 25 WEST 36TH REALTYCORP. · 3,703 sf lot · 10.76 FAR built · Flood zone X
Locations of Work
MechanicalFire Protection
Roof1p · 1 filing · 3 docs
Bulkhead1p · 1 filing · 14 docs
Mezzanine1p · 1 filing · 14 docs
Cellar3p · 1 filing · 14 docs
Sub-Cellar3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JJS BUILDERS407/08/2026
25 WEST 36TH REALTYCORP603/22/2026
25 WEST 36TH REATY CORP4503/22/2026
25 W 36TH REALTY503/22/2026
25 WEST 36TH STREET REALTY503/22/2026
25 W 36 REALTY CORP103/22/2026
25 WEST 36 REALTY103/22/2026
25 WEST 36 ST ASSOC IN103/22/2026
SPRING SCAFFOLDING INC103/21/2026
286 FIFTH AVENUE REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC412/04/2025
RIGID STRUCTURAL DESIGN, LLC101/06/2025
GREEN DESIGN106/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS DESIGN STUDIO203/21/2026
Rigid Structural Design, LLC203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
CHRISTOPHER STABILEElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
MOSKOWITZ STUARTElectrical103/21/2026
QUINTANA, DAVIDElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
STABILE CHRISTOPHERElectrical103/21/2026
STUART MOSKOWITZElectrical103/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
BEYOND COOLING LLCGeneral Contractor107/08/2026
CHETRAM, RISHIRAMElectrical103/21/2026
JJS BUILDERSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115412/04/2025
Building Lifecycle
All (102)Filed (7)Permit Issued (5)Signed Off (4)Facade (FISP) (14)Violation (60)Inspection (6)Special Inspection (6)
06/22/2026
Signed off — Alteration
TO FILE THE SPRINKLER JOB TO ADDRESS LOCAL LAW 26 OF 2004. NO CHANGE OF USE, EGRESS, AND OCCUPANCY. THIS APPLICATION TO SUPERSEDE SP WORK TYPE IN APPLICATION#110080983, 103623125.
M01186176-I1
04/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2025
Filed — Alteration
TO FILE THE SPRINKLER JOB TO ADDRESS LOCAL LAW 26 OF 2004. NO CHANGE OF USE, EGRESS, AND OCCUPANCY. THIS APPLICATION TO SUPERSEDE SP WORK TYPE IN APPLICATION#110080983, 103623125.
M01186176-P2
12/04/2025
Special inspection requirement — Sprinkler Systems
Liangkai Xia
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
12/04/2025
Special inspection requirement — Post-installed Anchors
Liangkai Xia
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
11/21/2025
Special inspection requirement — Post-installed Anchors
Liangkai Xia
11/21/2025
Special inspection requirement — Sprinkler Systems
Liangkai Xia
09/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2025
Permit issued — Sprinklers
M01186176-I1-EW-SP
06/19/2025
Signed off — Alteration
M01162673-I1
04/30/2025
Cycle 9 facade report signed — SWARMP
04/28/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01186533-I1
04/23/2025
Filed — Alteration
TO FILE THE SPRINKLER JOB TO ADDRESS LOCAL LAW 26 OF 2004. NO CHANGE OF USE, EGRESS, AND OCCUPANCY. THIS APPLICATION TO SUPERSEDE SP WORK TYPE IN APPLICATION#110080983, 103623125.
M01186176-P1
03/07/2025
Filed — Alteration
TO FILE THE SPRINKLER JOB TO ADDRESS LOCAL LAW 26 OF 2004. NO CHANGE OF USE, EGRESS, AND OCCUPANCY. THIS APPLICATION TO SUPERSEDE SP WORK TYPE IN APPLICATION#110080983, 103623125.
M01186176-I1
03/07/2025
Permit issued — Suspended Scaffold
M01186533-I1-SC
02/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01186533-I1
02/14/2025
Cycle 9 facade report submitted
02/05/2025
Cycle 9 facade inspection completed
01/07/2025
Permit issued — Sidewalk Shed
M01162673-I1-SH
01/06/2025
Filed — Alteration
M01162673-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2024
Violation issued (ECB, closed)
Local Law
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Signed off — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M00860412-I1
06/13/2023
Permit issued — Mechanical Systems
M00860412-I1-MS
06/06/2023
Filed — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M00860412-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/25/2021
Violation issued (ECB, closed)
Construction
04/21/2020
Violation issued (ECB, closed)
Construction
12/09/2019
Violation issued (ECB, open)
Construction
09/03/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/12/2019
Cycle 8 facade report signed — SAFE
01/02/2019
Cycle 8 facade report submitted
12/13/2018
Cycle 8 facade inspection completed
10/15/2018
Violation issued (ECB, closed)
Local Law
09/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2018
Permit issued — Sidewalk Shed
M00050450-I1-SH
06/05/2018
Filed — Alteration
M00050450-I1
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2017
Violation issued (ECB, closed)
Plumbing
10/17/2017
Violation issued (ECB, closed)
Construction
10/06/2017
Violation issued (ECB, closed)
Construction
10/06/2017
Violation issued (ECB, closed)
Construction
06/29/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.06/20/2025
DOB NOWSuspended ScaffoldSigned-offOSMANI NYC INC03/07/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/07/2025
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC06/13/2023
DOB NOWSidewalk ShedPermit IssuedJJS BUILDERS06/27/2018
BISOTISSUEDPREMIER SANITATION LLC10/21/2020
BISOTISSUEDPHASE 3 INTERIORS LLC01/07/2019
BISOTISSUEDABBASI GENERAL CONSTRUCTI07/12/2018
BISOTISSUEDWINGO CONSTRUCTION INC02/07/2017
BISPLISSUEDRRP PLUMBING CORP05/26/2016
BISOTISSUEDFIVE STAR CARTING LLC05/23/2016
BISOTISSUEDHI-TECH C.P.M. CORP02/16/2016
BISEQISSUEDHI-TECH C.P.M. CORP02/11/2016
BISPLISSUEDPETER PLUMBING ASSOC. INC.03/24/2014
BISOTISSUEDHI-TECH C.P.M. CORP12/23/2013
BISOTISSUEDHI-TECH C.P.M. CORP11/14/2012
BISFSISSUEDACE ACCURATE CONT'G SVC11/03/2011
BISEQISSUEDH & B CONSTRUCTION NY INC10/20/2010
BISOTISSUEDA L EASTMOND & SONS INC10/18/2010
BISOTISSUEDHI-TECH C.P.M. CORP07/11/2008
BISSPISSUEDG.J.K. MECHANICAL INC.02/25/2008
BISOTISSUEDCH STUDIOS, INC.02/06/2008
BISEQISSUEDHI-TECH C.P.M. CORP11/27/2007
BISOTISSUEDHI-TECH C.P.M. CORP10/06/2006
BISOTISSUEDHI-TECH C.P.M. CORP06/16/2006
BISOTISSUEDKORMAN DESIGN & BUILD12/15/2004
BIS—ISSUEDUNITECH DESIGN INC06/10/2004
BISFSISSUEDACE ATLAS CORP05/20/2004
BISOTISSUEDPRECISION CONSTR.03/26/2004
BISPLISSUEDFALIDERIO PLUMB HEAT. CORP03/26/2004
BISOTISSUEDK LAM CONSTR. INC.01/02/2004
BISOTISSUEDARCHE DESIGN INC11/26/2003
BIS—ISSUEDARCHE DESIGN INC.10/02/2003
BISOTISSUEDK & LAM CONSTRUCTION INC09/12/2003
BIS—ISSUEDNOVA PLUMB HEAT. INC.09/05/2003
BISOTISSUEDK LA CONSTR. INC.06/09/2003
BISOTISSUEDMING FUNG CONSTRUCTION03/28/2002
BISOTISSUEDMING FUNG CONST07/13/2001
BISOTISSUEDMING FUNG CONSTRUCTION07/02/2001
BISOTISSUEDMING FUNG CONSTRUCTION INC.04/27/2001
+ 7 more permits on file
1 project · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025Signed-offRRP PLUMBING CORP240 heads
1 project · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025———
2 projects · most recent 01/03/2025
FiledStatusContractorScope
01/03/2025CompleteBOROWIDE ELECT'L CONTR'S—
06/25/2018Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/04/2025Sprinkler SystemsLiangkai Xiaspecial
12/04/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
12/04/2025Post-installed AnchorsLiangkai Xiaspecial
11/21/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
11/21/2025Post-installed AnchorsLiangkai Xiaspecial
11/21/2025Sprinkler SystemsLiangkai Xiaspecial
▾Documents — 271 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00050450-I1Request digital key ↗
08/31/2026M00860412-I1Request digital key ↗
08/25/2026M01162673-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits81
▸BISPLAN / WORK APPROVAL APPLICATION57
08/12/2021102505424Open ↗
08/03/2021102591376Open ↗
07/29/2021102591376Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION24
10/21/2020103731758Open ↗
01/07/2019123469344Open ↗
07/12/2018123426131Open ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
01/07/2019123469344Open ↗
10/16/2018123426131Open ↗
10/16/2018123426131Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/07/2019123469344Open ↗
05/26/2016122690677Open ↗
02/23/2011120614923Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00050450-I1Open ↗
08/31/2026M00860412-I1Open ↗
08/25/2026M01162673-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
02/23/2011120614923Open ↗
10/28/2010120509805Open ↗
10/19/2010120499861Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/07/2019123469344Open ↗
05/26/2016122690677Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026M01186176-I1Open ↗
08/26/2026M01186176-P2Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/15/2014121746879Open ↗
04/03/2014121746879Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026M01186176-P1Open ↗
08/13/2026M01186176-I1Open ↗
08/13/2026M01186176-P2Open ↗
▸BISSCHEDULE B - PLUMBING2
10/10/2013121784916Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
04/10/2014121784916Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/19/2010120499861Open ↗
▸BISEQUIPMENT USE PERMITS1
04/15/2014121746879Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/26/2016122690677Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
10/09/2013121746879Open ↗
02/23/2011120614923Open ↗
▸BISST-1 Street Tree Checklist2
10/10/2013121784916Open ↗
11/15/2012121496167Open ↗
▸Environmental & Asbestos23
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
02/23/2011120614923Open ↗
10/28/2010120509805Open ↗
10/28/2010120509805Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/07/2019123469344Open ↗
05/14/2018123426131Open ↗
12/07/2016122824774Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00860412-I1Open ↗
08/13/2026M01186176-P2Open ↗
08/13/2026M01186176-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
10/10/2013121784916Open ↗
11/15/2012121496167Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
01/07/2019123469344Open ↗
10/16/2018123426131Open ↗
10/16/2018123426131Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/16/2018123426131Open ↗
04/15/2014121746879Open ↗
12/13/2012121496167Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/23/2011120614923Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/10/2013121784916Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
03/25/2021103123923Open ↗
03/25/2021103123923Open ↗
11/05/2020102505424Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISADMINISTRATIVE OBJECTIONS9
11/15/2012121496167Open ↗
02/23/2011120614923Open ↗
02/23/2011120616958Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/25/2021103123923Open ↗
10/16/2018123426131Open ↗
08/02/2016120499861Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/02/2016120499861Open ↗
04/15/2014121746879Open ↗
12/13/2012121496167Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
01/04/2011120495981Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
01/07/2019123469344Open ↗
10/16/2018123426131Open ↗
10/16/2018123426131Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET13
01/07/2019123469344Open ↗
05/11/2018123426131Open ↗
12/07/2016122824774Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION4
01/03/2023102096544Open ↗
08/12/2021102505424Open ↗
08/03/2021102591376Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/02/2020103731758Open ↗
10/16/2018123426131Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01186533-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01186533-I1Open ↗