← Back
Elevator cooperative
25 WEST 64 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1028132
💬 Discuss this project
1923Year Built
9Stories
D4Building Class
R8Zoning
33,492 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 25 W 64 ST OWNERS COR · 5,021 sf lot · 6.67 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 4Under Construction3p · 1 filing · 6 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES603/22/2026
25 W 64 ST OWNERS COR103/22/2026
25 WEST 64TH STREET OWNERS1503/22/2026
OWNER OF 25 W.64TH ST COR103/22/2026
23 W. 64 ST. OWNERS CO103/22/2026
25 W64ST OWNERS COR103/22/2026
A TEAM CONTRACTING103/21/2026
25 W 64TH ST OWNERS CORP C O203/21/2026
25 WEST 64203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LARSON ARCHITECTURE WORKS PLLC208/17/2026
ENTHINK ENGINEERS LLC102/17/2023
LOCKWOOD ARCHITECTURE312/22/2022
IVAN BRICE ARCHITECTURE109/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC BUILDING CONSULTANTS203/21/2026
TAILWIND CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
6TH AVENUE CONSTRUCTION &General Contractor203/21/2026
MOTTES, STEVEElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SANDHA GENERAL CONTRACTINElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
GRANDEUR HILLS GROUP INCGeneral Contractor107/08/2026
M INTERIORS CORPGeneral Contractor109/25/2026
DESIGN HOME INTERIORS INCElectrical103/21/2026
MEGA PLBG CORPPlumbing107/08/2026
JEROME KRITZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352109/19/2022
Building Lifecycle
All (84)Filed (7)Permit Issued (5)Signed Off (4)Facade (FISP) (13)Violation (45)Inspection (1)Objection (6)Special Inspection (3)
09/24/2026
Permit issued — General Construction
M01384051-I1-GC
08/17/2026
Filed — Alteration
REPLACEMENT AND REMOVAL OF PLUMBING FIXTURES, PIPING, AND ASSOCIATED COMPONENTS AT APARTMENT #4B, 4TH FLOOR.
M01384051-I1
08/17/2026
Filed — Alteration
REPLACEMENT AND REMOVAL OF PLUMBING FIXTURES, PIPING, AND ASSOCIATED COMPONENTS AT APARTMENT #4B, 4TH FLOOR.
M01384051-S1
10/04/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00829679-I1
07/26/2023
Signed off — Alteration
FILING APPLICATION FOR FACADE REPAIR IN COMPLIANCE WITH LL 11/98. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00795434-I1
04/17/2023
Signed off — Alteration
INTERIOR RENOVATION. WORK INCLUDE REPLACE AND RELOCATE PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00719566-I1
02/21/2023
Signed off — Alteration
INTERIOR REMODELATION FOR APARTMENT 3E. WORK INCLUDE: DRYWALL, WALL AND SOFFITS, CARPENTRY, DOORS & HARDWARE, PAINT, FLOORING AND TILING. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00718598-I1
02/17/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00829679-I1
02/17/2023
Permit issued — Sidewalk Shed
M00829679-I1-SH
12/22/2022
Filed — Alteration
INTERIOR RENOVATION. WORK INCLUDE REPLACE AND RELOCATE PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00719566-P1
10/27/2022
Permit issued — General Construction
M00795434-I1-GC
09/20/2022
Objection raised — Structural
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Structural
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Scope
09/20/2022
Objection resolved — Addressed
09/19/2022
Filed — Alteration
FILING APPLICATION FOR FACADE REPAIR IN COMPLIANCE WITH LL 11/98. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00795434-I1
08/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2022
Special inspection requirement — Masonry
JOHN SEMIOLI
08/17/2022
Special inspection requirement — Final
Ivan Brice
06/16/2022
Permit issued — Plumbing
M00719566-I1-PL
06/03/2022
Permit issued — General Construction
M00718598-I1-GC
05/05/2022
Cycle 9 facade report signed — SWARMP
04/20/2022
Filed — Alteration
INTERIOR RENOVATION. WORK INCLUDE REPLACE AND RELOCATE PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00719566-I1
04/20/2022
Filed — Alteration
INTERIOR REMODELATION FOR APARTMENT 3E. WORK INCLUDE: DRYWALL, WALL AND SOFFITS, CARPENTRY, DOORS & HARDWARE, PAINT, FLOORING AND TILING. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00718598-I1
04/13/2022
Special inspection requirement — Final
RAYMOND LOCKWOOD
03/04/2022
Cycle 9 facade report submitted
02/23/2022
Cycle 9 facade inspection completed
11/02/2018
Violation issued (HPD, open)
A
11/02/2018
Violation issued (HPD, open)
A
11/02/2018
Violation issued (HPD, open)
B
08/08/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2018
Cycle 8 facade report submitted
02/01/2018
Violation issued (ECB, closed)
Elevators
01/24/2018
Cycle 8 facade inspection completed
01/18/2018
Cycle 8 facade report signed — SWARMP
04/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/29/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2015
Violation issued (HPD, closed)
I
04/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2013
Cycle 7 facade report submitted
03/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/20/2012
Cycle 7 facade report submitted
08/20/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/2012
Cycle 7 facade inspection completed
08/10/2012
Cycle 7 facade report signed — UNSAFE
03/12/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/10/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/21/2006
Cycle 6 facade report submitted
10/28/2006
Cycle 6 facade report signed — SAFE
05/03/2006
Cycle 6 facade inspection completed
04/26/2006
Violation issued (HPD, open)
A
04/26/2006
Violation issued (HPD, closed)
A
04/26/2006
Violation issued (HPD, closed)
A
06/06/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM INTERIORS CORP09/24/2026
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/17/2023
DOB NOWGeneral ConstructionSigned-off6TH AVENUE CONSTRUCTION &10/27/2022
DOB NOWPlumbingSigned-offMEGA PLBG CORP06/16/2022
DOB NOWGeneral ConstructionSigned-offGRANDEUR HILLS GROUP INC06/03/2022
BISPLISSUEDHUB PLUMBING&HEATING CORP05/10/2013
BISEQISSUEDSPRING SCAFFOLDING LLC01/18/2013
BISOTISSUEDDESCHAMPS INDURSTRIES INC01/04/2013
BISEQISSUEDSPRING SCAFFOLDING LLC08/20/2012
BISOTISSUEDLEARDON BOILER WORKS INC12/19/2011
BISOTISSUEDALBA HOME REMODELING INC08/21/2009
BISEQISSUEDARSENAL SCAFFOLD INC12/01/2006
BISOTISSUEDPASHKO'S PAINTING COMPANY,INC04/24/2006
BISOTISSUEDEBRO CONSTRUC. CORP09/28/2005
BISEQISSUEDOUTDOOR INSTALLATIONS LLC.09/23/2005
BISPLISSUEDENOBRAC PLUMBING, INC07/13/2005
BISOTISSUEDTOTAL BUILLDING SERV.07/06/2005
BISOTISSUEDA TO Z CONTRACTING07/24/2000
BISPLISSUEDZAFI PLBG & HTG02/09/2000
BISOTISSUEDRELD CONSTRUCION CORP03/16/1999
BISOTISSUEDDNA CONSTRUCITON CO04/02/1997
BISEQISSUEDSPRING SCAFF.,INC.11/19/1996
1 project · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026——Gas, Water/Sanitary
5 projects · most recent 02/17/2023
General Wiring
FiledStatusContractorScope
02/17/2023CompleteRICHARD NEU—
06/08/2022CompleteKINGS ELECTRIC CO., INC.—
12/22/2020CompleteALL CITY ELECTRICAL INCGeneral Wiring
04/09/2019CompleteEVS ELECTRIC CORPGeneral Wiring
03/14/2019CompleteSAFETECH ELECL CONTNG CORGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/17/2022MasonryJOHN SEMIOLIspecial
08/17/2022FinalIvan Briceprogress
04/13/2022FinalRAYMOND LOCKWOODprogress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00719566-I1Request digital key ↗
09/02/2026M00719566-P1Request digital key ↗
09/02/2026M00718598-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
05/15/2013121497460Open ↗
01/23/2013121349068Open ↗
01/07/2013121497460Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
11/14/2012121497460Open ↗
08/21/2012121349068Open ↗
12/16/2011120924330Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/14/2013121497460Open ↗
12/27/2012121497460Open ↗
11/14/2012121497460Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00718598-I1Open ↗
08/31/2026M00829679-I1Open ↗
08/18/2026M01384051-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/21/2012121349068Open ↗
01/03/2012120924330Open ↗
08/18/2009120132971Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/21/2012121349068Open ↗
08/18/2009120132971Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00718598-I1Open ↗
08/27/2026M00795434-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M00795434-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
11/14/2012121497460Open ↗
08/18/2009120132971Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/18/2013121497460Open ↗
06/14/2013121497460Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00718598-I1Open ↗
08/18/2026M01384051-S1Open ↗
08/18/2026M01384051-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
01/03/2012120924330Open ↗
08/18/2009120132971Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
01/02/2013121497460Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/27/2012121497460Open ↗
07/05/2012120924330Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
11/14/2012121497460Open ↗
08/21/2012121349068Open ↗
12/16/2011120924330Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/19/2013121349068Open ↗
06/14/2013121497460Open ↗
07/05/2012120924330Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/23/2013121349068Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
06/14/2013121497460Open ↗
12/27/2012121497460Open ↗
11/14/2012121497460Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/21/2009120132971Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
11/14/2012121497460Open ↗
08/21/2012121349068Open ↗
12/16/2011120924330Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
07/12/2012120924330Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/05/2012120924330Open ↗