| Owner | Filings | Most Recent |
|---|---|---|
| 59 MAIDEN LANE ASSOCIATES, LLC | 457 | 09/13/2026 |
| CEPRINE CONSTRUCTION | 13 | 07/08/2026 |
| OWNERS REP | 3 | 07/08/2026 |
| PYRAMID RESTORATION NY | 3 | 04/09/2026 |
| 250 BROADWAY ASSOCIATES | 155 | 03/22/2026 |
| SIGNATURE CONSTRUCTION GR | 2 | 03/22/2026 |
| 250 BDWY ASSOCIATES CORP | 1 | 03/22/2026 |
| SKYLINE SCAFFOLDING GROUP | 1 | 03/22/2026 |
| 225 BROADWAY COMPANY | 1 | 03/22/2026 |
| HARDVARD MAINTENANCE INC | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GKV ARCHITECTS | 36 | 08/03/2026 |
| AM ARCHITECT P.C. | 1 | 05/27/2026 |
| MG ENGINEERING D.P.C. | 7 | 02/23/2026 |
| WSP | 5 | 02/23/2026 |
| JACK GREEN ASSOCIATES | 81 | 02/12/2026 |
| KZ ENGINEERING, P.C | 2 | 12/02/2025 |
| METROPOLITAN MECHANICAL CONTRACTORS | 1 | 09/26/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 05/05/2022 |
| F.P.VILLANO CONSULTING ENGINEER LLC | 2 | 07/12/2021 |
| ETNA CONSULTING | 1 | 04/12/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 150 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 4 | 03/21/2026 |
| PAUL FUSCO CONSULTING | 2 | 03/21/2026 |
| CB | 2 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| PYRAMID RESTORATION NY | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SIGNATURE CONSTRUCTION GROUP | General Contractor | 57 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 14 | 07/08/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 13 | 07/08/2026 |
| PAL ENVIRONMENTAL SAFETY | General Contractor | 10 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 8 | 07/08/2026 |
| W5 GROUP LLC | General Contractor | 6 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 6 | 07/08/2026 |
| PLAZA CONSTRUCTION LLC | General Contractor | 5 | 04/09/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 4 | 07/08/2026 |
| AMERICAN STANDARD PLUMBING & | Fire Protection | 4 | 07/08/2026 |
| AMERICAN STANDARD P&H CORORP. | Plumbing | 4 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 3 | 07/08/2026 |
| ULTIMATE SIGNS DESIGNS | Scaffold | 2 | 07/08/2026 |
| PEREZ, JHONATAN | Electrical | 2 | 03/21/2026 |
| VOUYIOUKLIS, DEMETRIOS | Electrical | 2 | 03/21/2026 |
| COPPER SERVICES LLC | Fire Protection | 2 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 07/08/2026 |
| WALTON, MARC | Electrical | 1 | 03/21/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 1 | 07/08/2026 |
| GENERAL PLUMBING CORP | Fire Protection | 1 | 05/27/2026 |
| MACKLER MASTER FIRE INC | Fire Protection | 1 | 07/08/2026 |
| ASANKOMAH, KOFI | Electrical | 1 | 03/21/2026 |
| ALPINE ENTERPRISES NY LTD | General Contractor | 1 | 04/09/2026 |
| VAQUERO, RICHARD | Electrical | 1 | 03/21/2026 |
| CERINA GENERAL CONTR INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JACK GREEN ASSOCIATES | 422 | 103 | 08/03/2026 |
| SPECIAL TESTING & CONSULT | 1688 | 7 | 02/23/2026 |
| METROPOLITAN MECHANICAL C | 2277 | 1 | 09/26/2025 |
| ETNA CONSULTING | 1869 | 1 | 04/12/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | SOHO CONTRACTING CORP | 05/27/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 12/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 12/31/2025 |
| DOB NOW | Structural | Signed-off | SIGNATURE CONSTRUCTION GR | 12/31/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 12/31/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 12/31/2025 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 12/08/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 12/08/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STREAMLINE CONSULTANTS NY | 12/03/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CEPRINE CONSTRUCTION INC | 12/03/2025 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 12/03/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 12/02/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 12/02/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | CERINA GENERAL CONTR. INC | 12/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 11/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | METROPOLITAN MECHANICAL C | 09/29/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 09/29/2025 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 09/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 09/22/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 09/22/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STREAMLINE CONSULTANTS NY | 09/22/2025 |
| DOB NOW | Structural | Signed-off | SIGNATURE CONSTRUCTION GR | 09/22/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 09/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 09/19/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 09/19/2025 |
| DOB NOW | Structural | Signed-off | SIGNATURE CONSTRUCTION GR | 09/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 09/18/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 09/18/2025 |
| DOB NOW | Plumbing | Signed-off | AMERICAN STANDARD P&H CORORP. | 09/05/2025 |
| DOB NOW | Sprinklers | Signed-off | AMERICAN STANDARD PLUMBIN | 08/29/2025 |
| DOB NOW | Plumbing | Signed-off | AMERICAN STANDARD P&H CORORP. | 08/28/2025 |
| DOB NOW | Sprinklers | Signed-off | AMERICAN STANDARD PLUMBIN | 08/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | W5 GROUP LLC | 08/12/2025 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 08/11/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 08/11/2025 |
| DOB NOW | Structural | Signed-off | SIGNATURE CONSTRUCTION GR | 08/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 08/08/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 08/08/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/07/2025 | Permit Issued | PLAZA CONSTRUCTION LLC | Air Conditioning Systems | Cooling Bosch CL018-1HZC-LRETUA-XCGMXXXX5XXXX1XXXXSBA 16 tons · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2025 | Signed-off | BEDROCK MECHANICAL INC | 110 heads |
| 06/26/2025 | Signed-off | BEDROCK MECHANICAL INC | 74 heads |
| 02/24/2025 | — | — | 27 heads |
| 02/13/2024 | Signed-off | BEDROCK MECHANICAL INC | 30 heads |
| 12/06/2023 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 07/27/2023 | Signed-off | BEDROCK MECHANICAL INC | 41 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2025 | — | — | — |
| 07/31/2025 | Signed-off | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| 06/26/2025 | — | — | — |
| 12/06/2023 | Permit Issued | MACKLER MASTER FIRE INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 05/13/2026 | Permit Issued | PALANT ELEC'L CONTR'G COR | — |
| 12/02/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 09/26/2025 | Permit Issued | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 08/27/2025 | Complete | MAUCERI ELECTRIC CORP. | General Wiring |
| 04/23/2025 | Permit Issued | REDGRAVE ELECTL MAINTNCE | General Wiring |
| 03/31/2025 | Complete | ATLAS-ACON ELEC. SERVICE | 4 meters |
| 01/29/2025 | Permit Issued | REDGRAVE ELECTL MAINTNCE | General Wiring |
| 01/22/2025 | Complete | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 01/16/2025 | Complete | MAUCERI ELECTRIC CORP. | General Wiring |
| 12/29/2023 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 11/29/2023 | Complete | COGEN ELEC'L SERVICES,INC | General Wiring |
| 10/30/2023 | Permit Issued | MAUCERI ELECTRIC CORP. | — |
| 08/03/2023 | Permit Issued | MAUCERI ELECTRIC CORP. | General Wiring |
| 08/03/2023 | Permit Issued | MAUCERI ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/14/2026 | Signed-off | SIGNATURE CONSTRUCTION GR | Steel, Concrete |
| 09/18/2025 | Permit Issued | SIGNATURE CONSTRUCTION GR | 1 scope_items |
| 04/12/2021 | Permit Issued | CERINA GENERAL CONTR INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | Permit Issued | SOHO CONTRACTING CORP | Sidewalk Shed |
| 12/02/2025 | Signed-off | CEPRINE CONSTRUCTION INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/11/2025 | Signed-off | CERINA GENERAL CONTR. INC | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/11/2025 | Signed-off | CERINA GENERAL CONTR. INC | Suspended Scaffold (SC) |
| 09/08/2025 | Signed-off | STREAMLINE CONSULTANTS NY | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/17/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/17/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/04/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/09/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 01/20/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 01/07/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/07/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/31/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/23/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/19/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/21/2026 | Final | Benita Welch | progress |
| 07/21/2026 | Fire-Resistance Rated Construction | JACK GREEN | progress |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | JACK GREEN | special |
| 07/09/2026 | Final | Benita Welch | progress |
| 07/09/2026 | Sprayed fire-resistant materials | JACK GREEN | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | JACK GREEN | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | JACK GREEN | special |
| 06/03/2026 | Final | Benita Welch | progress |
| 06/03/2026 | Sprayed fire-resistant materials | JACK GREEN | special |
| 02/24/2026 | Duct leakage testing, insulation and design | JACK GREEN | energy_progress |
| 02/24/2026 | Mechanical Systems | JACK GREEN | special |
| 02/24/2026 | Interior lighting power | JACK GREEN | energy_progress |
| 02/24/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 02/24/2026 | Demolition | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 02/24/2026 | Shutoff dampers | JACK GREEN | energy_progress |
| 02/24/2026 | HVAC-R and service water heating system controls | JACK GREEN | energy_progress |
| 02/24/2026 | Fire-Resistant Penetrations and Joints | JACK GREEN | special |
| 02/24/2026 | Lighting controls | JACK GREEN | energy_progress |
| 02/24/2026 | Final | JACK GREEN | progress |
| 02/24/2026 | Exhaust and Vent Systems in Plenums and Ducts | JACK GREEN | special |
| 02/24/2026 | Heating Systems | JACK GREEN | special |
| 02/24/2026 | Post-installed Anchors | JACK GREEN | special |
| 02/24/2026 | Maintenance information | JACK GREEN | energy_progress |
| 02/24/2026 | HVAC-R and service water heating equipment | JACK GREEN | energy_progress |
| 02/24/2026 | HVAC-R and service water piping design and insulation | JACK GREEN | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| City Council | Office | Floors 7, 8 | Project M01130553 Project M01130569 |
| New York City Council | Office | Floors 7, 8 | Project M01130391 Project M01130401 Project M01121636 |
| Worldwide TechServices | Office | Floors 5, 6 | Project M00963307 Project M00963408 Project M00963420 Project M00900659 Project M00901890 Project M00901907 Project M00901918 |
| RMDAK Holdings | Office | Floor 5 | Project M00936540 |
| Pollack, Isaac & DeCicco | Unknown | Floor 6 | Project M00839235 Project M00839251 Project M00839266 Project M00839281 |
| AmTrust | Office | Floors 11, 12, 25 | Project M00477121 Project M00478278 Project M00477102 Project M00454998 Project M00454888 Project M00459646 Project M00459165 |
| Council | Office | Floors 9–12 | Project M00359283 Project M00368881 |