← Back
One story retail building
250 CYPRESS AVENUE
BRONX · BIN 2003805
💬 Discuss this project
1925Year Built
1Stories
K1Building Class
R6Zoning
12,200 sfGross Floor Area
4Units
4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 679 E 138TH STREET REALTY CORP. · 12,200 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Floor 16p · 2 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (70)Filed (7)Permit Issued (6)Signed Off (4)Violation (19)Inspection (4)Special Inspection (30)
02/05/2026
Violation issued (ECB, open)
Construction
08/06/2024
Violation issued (ECB, open)
Construction
03/26/2024
Signed off — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-S2
03/26/2024
Signed off — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-I1
03/25/2024
Signed off — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-S1
02/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2024
Filed — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-P1
01/29/2024
Filed — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-P2
01/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
01/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
01/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/29/2024
Special inspection requirement — Mechanical Systems
Robert Truskosky
01/29/2024
Special inspection requirement — Final
Robert Truskosky
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
01/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
01/29/2024
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
01/29/2024
Special inspection requirement — Fenestration areas
Robert Truskosky
01/29/2024
Special inspection requirement — Lighting controls
Robert Truskosky
01/29/2024
Special inspection requirement — Fenestration air leakage
Robert Truskosky
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/29/2024
Special inspection requirement — Interior lighting power
Robert Truskosky
01/29/2024
Special inspection requirement — Maintenance information
Robert Truskosky
01/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
01/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
01/22/2024
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
01/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
01/22/2024
Special inspection requirement — Interior lighting power
Robert Truskosky
01/22/2024
Special inspection requirement — Fenestration air leakage
Robert Truskosky
01/22/2024
Special inspection requirement — Fenestration areas
Robert Truskosky
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
01/22/2024
Special inspection requirement — Lighting controls
Robert Truskosky
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
01/22/2024
Special inspection requirement — Maintenance information
Robert Truskosky
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/22/2024
Special inspection requirement — Mechanical Systems
Robert Truskosky
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
08/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2023
Permit issued — Plumbing
X00833523-S1-PL
04/17/2023
Permit issued — Mechanical Systems
X00833523-I1-GC-CX
04/17/2023
Permit issued — Construction Fence
X00833523-S2-FN
04/03/2023
Filed — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-S2
04/03/2023
Filed — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-S1
03/13/2023
Permit issued — Mechanical Systems
X00833523-I1-GC-CX
03/02/2023
Filed — Alteration
ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION INCLUDES REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, MODIFY STOREFRONT, DRYERS VENT, H.W.H. VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00833523-I1
03/11/2022
Violation issued (FDNY_NOV, closed)
03/11/2022
Violation issued (FDNY_NOV, closed)
10/27/2021
Signed off — Alteration
REPLACE EXIST'G 20 HP GAS FIRED HIGH PRESSURE STEAM BOILER (#: 110209) W/ 20 HP GAS-FIRED ONE AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN. NO GAS TEST IS REQUIRED, GAS PRESSURE IS THE SAME, DISCONNECT BY THE APPLIANCE VALVE BY THE EXIST'G GAS BOILER.
X00273818-I1
06/28/2021
Permit issued — Boiler Equipment
X00273818-I1-BE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/25/2020
Filed — Alteration
REPLACE EXIST'G 20 HP GAS FIRED HIGH PRESSURE STEAM BOILER (#: 110209) W/ 20 HP GAS-FIRED ONE AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN. NO GAS TEST IS REQUIRED, GAS PRESSURE IS THE SAME, DISCONNECT BY THE APPLIANCE VALVE BY THE EXIST'G GAS BOILER.
X00273818-P1
12/03/2019
Permit issued — Boiler Equipment
X00273818-I1-BE
12/01/2019
Filed — Alteration
REPLACE EXIST'G 20 HP GAS FIRED HIGH PRESSURE STEAM BOILER (#: 110209) W/ 20 HP GAS-FIRED ONE AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN. NO GAS TEST IS REQUIRED, GAS PRESSURE IS THE SAME, DISCONNECT BY THE APPLIANCE VALVE BY THE EXIST'G GAS BOILER.
X00273818-I1
07/19/2017
Violation issued (FDNY_NOV, closed)
10/19/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 70 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HB HOLDING1507/08/2026
SHIRTS KIM INC903/22/2026
679 E 138TH STREET REALTY CORP.203/22/2026
SHIRT KING CLEANERS INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.501/29/2024
M B KIM ARCHITECT P C202/25/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NILCOMAT INCGeneral Contractor207/08/2026
WASOFF PLBG & UTILITY COPlumbing207/08/2026
SMOOT, ALEXANDERElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
CESAR QUERYElectrical103/21/2026
PLUMBING NYC INCPlumbing107/08/2026
ART OF CONSTRUCTIONGeneral Contractor107/08/2026
CRAWLEY, STEVENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637401/29/2024
M B KIM ARCHITECT P C4257202/25/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC04/24/2023
DOB NOWMechanical SystemsSigned-offNILCOMAT INC04/17/2023
DOB NOWConstruction FenceSigned-offNILCOMAT INC04/17/2023
DOB NOWMechanical SystemsSigned-offART OF CONSTRUCTION03/13/2023
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO06/28/2021
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO12/03/2019
BISOTISSUEDFORT-CICA ROOFING & GEN05/29/2014
BISOTISSUEDBOUBACAR SOW05/23/2014
BISPLISSUEDVITELLO P & MECHANICAL INC12/31/1998
BISOTISSUEDNEW YORK MACHINERY INC.10/07/1998
BISOTISSUEDGLOBE CONSTRUCTION CO.07/22/1997
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
01/29/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
01/29/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
01/29/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
01/29/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/29/2024Mechanical SystemsRobert Truskoskyspecial
01/29/2024FinalRobert Truskoskyprogress
01/29/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
01/29/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
01/29/2024Air barrier - visual inspectionRobert Truskoskyenergy_progress
01/29/2024Fenestration areasRobert Truskoskyenergy_progress
01/29/2024Lighting controlsRobert Truskoskyenergy_progress
01/29/2024Fenestration air leakageRobert Truskoskyenergy_progress
01/29/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/29/2024Interior lighting powerRobert Truskoskyenergy_progress
01/29/2024Maintenance informationRobert Truskoskyenergy_progress
01/29/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
01/29/2024Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
01/29/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
01/22/2024Air barrier - visual inspectionRobert Truskoskyenergy_progress
01/22/2024Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
01/22/2024Interior lighting powerRobert Truskoskyenergy_progress
01/22/2024Fenestration air leakageRobert Truskoskyenergy_progress
01/22/2024Fenestration areasRobert Truskoskyenergy_progress
01/22/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
01/22/2024Lighting controlsRobert Truskoskyenergy_progress
Latest 25 of 35.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/21/2026X00833523-P2Request digital key ↗
08/21/2026X00833523-S2Request digital key ↗
08/21/2026X00833523-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/26/2026X00273818-I1Request digital key ↗
08/15/2026X00273818-P1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/14/2014220380120Open ↗
05/15/2014220380120Open ↗
▸BISWORK PERMIT APPLICATION1
06/18/2014220380120Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026X00273818-I1Open ↗
09/23/2026X00833523-P1Open ↗
09/23/2026X00833523-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026X00273818-I1Open ↗
08/26/2026X00273818-P1Open ↗
08/21/2026X00833523-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00833523-P1Open ↗
09/23/2026X00833523-P1Open ↗
09/23/2026X00273818-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/11/2014220380120Open ↗
05/15/2014220380120Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/15/2014220380120Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/15/2014220380120Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00273818-P1Open ↗
08/26/2026X00273818-I1Open ↗
08/21/2026X00833523-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/15/2014220380120Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00273818-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/11/2014220380120Open ↗
06/18/2014220380120Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/25/2014220380120Open ↗
08/16/2014220380120Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/11/2014220380120Open ↗
05/15/2014220380120Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
05/15/2014220380120Open ↗
▸BISADDITIONAL INFORMATION1
05/29/2014220380120Open ↗