← Back
Public elementary, junior or senior high
J.H.S. 151 Lou Gehrig
250 EAST 156 STREET · Concourse-Concourse Village · BIN 2002458
💬 Discuss this project
1970Year Built
4Stories
W1Building Class
R8Zoning
153,600 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 0 unresolved · 6 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 112,814 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1Under Construction9p · 2 filings · 20 docs
Site & exterior17p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY SCHOOL CONSTRUCTION AUTHORITY1203/21/2026
NYC SCHOOL CONSTRUCTION AUTH603/21/2026
NYCSCHOOL CONSTRUCTION AUTHORITY603/21/2026
NYC SCHOOL CONST AUTHORITY203/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DIVISION OF SCHOOL FACILITIES103/21/2026
NY SCHOOL CONSTRUCTION AUTH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES603/21/2026
RA403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERLAST SCAFFOLDING INCGeneral Contractor907/08/2026
EMPIRE CONTROL ABATEMENTGeneral Contractor704/09/2026
WDF INCGeneral Contractor403/21/2026
ANTHONY MATRONEElectrical203/21/2026
DEREK MOHANElectrical203/21/2026
CARNAK CONSTRUCTION INCGeneral Contractor207/08/2026
MAR-SAL PLBG & HTG, INCPlumbing207/08/2026
MP & L METAL INCElectrical103/21/2026
PRAVATO, ANTHONYElectrical103/21/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
HAS, MEHMETElectrical103/21/2026
DONALD WHITEElectrical103/21/2026
JEFFREY MILADElectrical103/21/2026
KATZEN, BARRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317812/13/2024
Building Lifecycle
All (125)Filed (10)Permit Issued (16)Signed Off (4)Violation (60)Inspection (1)Objection (8)Special Inspection (26)
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
03/26/2026
Violation issued (ECB, open)
Construction
03/26/2026
Violation issued (ECB, open)
Construction
01/28/2026
Permit issued — General Construction
X00685888-I1-GC
07/05/2025
Violation issued (ECB, open)
Construction
02/25/2025
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/19/2025
Objection resolved — Addressed
12/18/2024
Objection raised — Other
12/13/2024
Filed — Alteration
Demo drinking fountain and all piping and appurtenances including connections to existing cold water, waste and vent. Install new ADA compliant double drinking fountain w/bottle filler and connect to existing cold water, waste and vent.
X00685888-P1
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
12/11/2024
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
12/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
12/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
12/11/2024
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
12/11/2024
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
07/18/2024
Permit issued — General Construction
X00685888-I1-GC
07/03/2024
Signed off — Alteration
Proposed mechanical work is to replace rooftop exhaust fans in kind. Fans are located at building roof. Miscellaneous work for exhaust grilles and dampers replacement on first through fourth floors of the building.
X00385903-I1
04/09/2024
Objection resolved — Addressed
03/19/2024
Objection raised — Other
03/16/2024
Filed — Alteration
Proposed mechanical work is to replace rooftop exhaust fans in kind. Fans are located at building roof. Miscellaneous work for exhaust grilles and dampers replacement on first through fourth floors of the building.
X00385903-P4
03/12/2024
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
03/12/2024
Special inspection requirement — Electrical motors
MIKHAIL ZEYGMAN
03/12/2024
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
03/12/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
03/12/2024
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
02/05/2024
Signed off — Alteration
SF/IS151X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(Scaffold) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201202723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00568579-I1
01/31/2024
Signed off — Alteration
X00568560-I1
01/30/2024
Signed off — Alteration
X00568569-I1
03/27/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (ECB, closed)
Construction
02/03/2023
Permit issued — Sidewalk Shed
X00568569-I1-SH
02/03/2023
Permit issued — Supported Scaffold
X00568579-I1-SF
12/20/2022
Filed — Alteration
Proposed mechanical work is to replace rooftop exhaust fans in kind. Fans are located at building roof. Miscellaneous work for exhaust grilles and dampers replacement on first through fourth floors of the building.
X00385903-P2
11/07/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2022
Permit issued — Sidewalk Shed
X00568569-I1-SH
10/12/2022
Permit issued — Supported Scaffold
X00568579-I1-SF
09/22/2022
Permit issued — Construction Fence
X00568560-I1-FN
09/15/2022
Permit issued — Plumbing
X00685888-S1-PL
07/05/2022
Permit issued — Plumbing
X00685888-S1-PL
06/22/2022
Permit issued — General Construction
X00685888-I1-GC
05/25/2022
Violation issued (ECB, closed)
Construction
05/25/2022
Violation issued (ECB, closed)
Construction
05/25/2022
Violation issued (ECB, closed)
Construction
05/17/2022
Permit issued — General Construction
X00685888-I1-GC
04/18/2022
Objection resolved — Addressed
04/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
03/14/2022
Objection raised — Other
03/01/2022
Filed — Alteration
Demo drinking fountain and all piping and appurtenances including connections to existing cold water, waste and vent. Install new ADA compliant double drinking fountain w/bottle filler and connect to existing cold water, waste and vent.
X00685888-S1
02/28/2022
Filed — Alteration
Demo drinking fountain and all piping and appurtenances including connections to existing cold water, waste and vent. Install new ADA compliant double drinking fountain w/bottle filler and connect to existing cold water, waste and vent.
X00685888-I1
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT01/28/2026
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT07/18/2024
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING02/03/2023
DOB NOWSupported ScaffoldSigned-offEVERLAST SCAFFOLDING02/03/2023
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING10/12/2022
DOB NOWSupported ScaffoldSigned-offEVERLAST SCAFFOLDING10/12/2022
DOB NOWConstruction FenceSigned-offCARNAK CONSTRUCTION INC09/22/2022
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC09/15/2022
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC07/05/2022
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT06/22/2022
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT05/17/2022
DOB NOWSupported ScaffoldSigned-offEVERLAST SCAFFOLDING10/26/2021
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING10/12/2021
DOB NOWConstruction FenceSigned-offCARNAK CONSTRUCTION INC09/29/2021
DOB NOWMechanical SystemsSigned-offWDF INC07/06/2021
DOB NOWMechanical SystemsSigned-offWDF INC08/27/2020
BISOTISSUEDCARNAK CONSTRUCTION INC01/28/2025
BISOTISSUEDCARNAK CONSTRUCTION INC01/27/2025
BISOTISSUEDCARNAK CONSTRUCTION INC01/30/2024
BISOTISSUEDCARNAK CONSTRUCTION INC01/30/2024
BISPLISSUEDVARSITY PLBG AND HTG INC10/11/2023
BISMHISSUEDU & I MECHANICAL CORP07/31/2023
BISOTISSUEDCARNAK CONSTRUCTION INC02/02/2023
BISOTISSUEDCARNAK CONSTRUCTION INC02/02/2023
BISPLISSUEDVARSITY PLBG AND HTG INC10/17/2022
BISMHISSUEDU & I MECHANICAL CORP07/08/2022
BISOTISSUEDCARNAK CONSTRUCTION INC02/18/2022
BISOTISSUEDCARNAK CONSTRUCTION INC02/18/2022
BISMHISSUEDU & I MECHANICAL CORP10/26/2021
BISOTISSUEDCARNAK CONSTRUCTION INC10/26/2021
BISOTISSUEDCARNAK CONSTRUCTION INC10/26/2021
BISPLISSUEDVARSITY PLBG AND HTG INC10/26/2021
BISOTISSUEDLITEHOUSE BUILDERS INC07/13/2021
BISPLISSUEDMAR-SAL PLBG & HTG, INC07/27/2020
BISOTISSUEDLITEHOUSE BUILDERS INC07/14/2020
BISPLISSUEDMAR-SAL PLBG & HTG, INC10/05/2018
BISMHISSUEDLITEHOUSE BUILDERS INC07/03/2018
BISOTISSUEDLITEHOUSE BUILDERS INC07/03/2018
BISPLISSUEDMAR-SAL PLBG & HTG, INC08/29/2017
BISMHISSUEDLITEHOUSE BUILDERS INC08/25/2017
+ 26 more permits on file
1 project · most recent 12/13/2024
Water/Sanitary
FiledStatusContractorScope
12/13/2024Permit IssuedMAR-SAL PLBG & HTG, INCWater/Sanitary
10 projects · most recent 04/25/2026
General Wiring Lighting
FiledStatusContractorScope
04/25/2026Pending PaymentEVEREST ELECTRIC CORPGeneral Wiring
11/12/2025CompleteANCO ELECTL CONTCTNG INC—
03/06/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
03/22/2023CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
01/03/2023CompleteURBAN ELECTRICAL CORPGeneral Wiring
05/17/2022CancelledJAMES F. VOLPE ELEC'LGeneral Wiring
12/07/2021CompleteMILAD CONTRACTING CORP.General Wiring, Lighting
10/06/2021CompleteSTANCO SYSTEM ELEC'L CONT—
08/25/2020CompleteUNISYS ELECTRIC INC.General Wiring
09/24/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
1 project · most recent 12/13/2024
FiledStatusContractorScope
12/13/2024Permit IssuedEMPIRE CONTROL ABATEMENT1 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/07/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/25/2025Interior lighting powerMIKHAIL ZEYGMANenergy_progress
02/25/2025Lighting controlsMIKHAIL ZEYGMANenergy_progress
02/25/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
02/25/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/25/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
02/25/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
12/11/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
12/11/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
12/11/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
12/11/2024Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
12/11/2024Interior lighting powerMIKHAIL ZEYGMANenergy_progress
12/11/2024Lighting controlsMIKHAIL ZEYGMANenergy_progress
03/12/2024Maintenance informationMIKHAIL ZEYGMANenergy_progress
03/12/2024Electrical motorsMIKHAIL ZEYGMANenergy_progress
03/12/2024Mechanical SystemsMIKHAIL ZEYGMANspecial
03/12/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
03/12/2024FinalMIKHAIL ZEYGMANprogress
03/12/2024Shutoff dampersMIKHAIL ZEYGMANenergy_progress
04/13/2022Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
09/30/2021FinalMIKHAIL ZEYGMANprogress
09/30/2021Electrical motorsMIKHAIL ZEYGMANenergy_progress
09/30/2021Maintenance informationMIKHAIL ZEYGMANenergy_progress
09/30/2021Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
09/30/2021Mechanical SystemsMIKHAIL ZEYGMANspecial
09/30/2021Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
Latest 25 of 26.
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
08/25/2026X00568569-I1Request digital key ↗
08/25/2026X00568560-I1Request digital key ↗
08/20/2026X00685888-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/26/2026X00385903-P2Request digital key ↗
08/26/2026X00385903-I1Request digital key ↗
08/26/2026X00385903-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/06/2016220540467Open ↗
▸BISWORK PERMIT APPLICATION1
07/08/2016220540467Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026X00685888-P1Open ↗
09/02/2026X00685888-P1Open ↗
09/02/2026X00685888-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00385903-I1Open ↗
08/26/2026X00385903-P1Open ↗
08/26/2026X00385903-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026X00685888-P1Open ↗
09/02/2026X00685888-P1Open ↗
09/01/2026X00385903-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/06/2016220540467Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/08/2016220540467Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/06/2016220540467Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026X00568579-I1Open ↗
08/13/2026X00568569-I1Open ↗
08/13/2026X00568560-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026X00385903-I1Open ↗
08/20/2026X00685888-S1Open ↗
08/15/2026X00685888-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/06/2016220540467Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00385903-I1Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/13/2026X00385903-P1Open ↗
08/13/2026X00568560-I1Open ↗
08/13/2026X00685888-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/25/2026X00568560-I1Open ↗
08/20/2026X00685888-S1Open ↗
08/15/2026X00685888-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026X00685888-I1Open ↗
08/13/2026X00685888-S1Open ↗
08/13/2026X00385903-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/20/2026X00685888-S1Open ↗
08/15/2026X00685888-I1Open ↗
08/13/2026X00385903-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/06/2016220540467Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/08/2016220540467Open ↗
▸BISEFILING COVER SHEET1
07/06/2016220540467Open ↗
▸Other Documents13
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
08/13/2026X00685888-P1Open ↗
08/13/2026X00385903-P1Open ↗
08/13/2026X00385903-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026X00568579-I1Open ↗
08/13/2026X00568560-I1Open ↗
08/13/2026X00568569-I1Open ↗