← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Atlantic Chestnut I Condominium
250 EUCLID AVENUE · BIN 3428952
💬 Discuss this project
2022Year Built
14Stories
RMBuilding Class
M1-4/R8AZoning
316,213 sfGross Floor Area
405Units
LL97 CoveredRent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: ATLANTIC CHESTNUT I HOUSING DEV FUND COR PORATION · 65,994 sf lot · 4.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilOther
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 13 docs
Floor 144p · 1 filing · 6 docs
Floor 133p · 1 filing · 6 docs
Floor 122p · 1 filing · 6 docs
Floor 112p · 1 filing · 6 docs
Floor 103p · 1 filing · 6 docs
Floor 92p · 1 filing · 6 docs
Floor 82p · 1 filing · 6 docs
Floor 72p · 1 filing · 6 docs
Floor 62p · 1 filing · 6 docs
Floor 52p · 1 filing · 6 docs
Floor 42p · 1 filing · 6 docs
Floor 32p · 1 filing · 6 docs
Floor 22p · 1 filing · 6 docs
Floor 12p · 1 filing · 6 docs
CellarUnder Construction196p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHIPPS HOUSES8507/08/2026
COSAN CONSTRUCTION607/08/2026
MONADNOCK CONSTRUCTION, INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3503/21/2026
EUROCELT EXPEDITING, INC603/21/2026
A1 EXPEDITING SERVICE603/21/2026
PATUXENT ENGINEERING603/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONADNOCK GEN'L CONT INCGeneral Contractor1507/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor1207/08/2026
CMA PLUMBING & HEATING INFire Protection907/08/2026
MONADNOCK CONSTRUCTION INGeneral Contractor704/09/2026
ROBERT GIOELLOElectrical603/21/2026
GLO ELECTRIC LLC 004157General Contractor603/22/2026
M. EARLY PLBG & HTG CORPPlumbing507/08/2026
VOLTAIR SOLAR LLCGeneral Contractor303/21/2026
COSAN CONSTRUCTION CORPGeneral Contractor207/08/2026
AKRF, INC.General Contractor203/22/2026
ANTHONY G FERRY INCElectrical103/22/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
B.P. ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC2672904/22/2025
NKM ENGINEERING PLLC6244103/25/2024
Building Lifecycle
All (175)Filed (45)Permit Issued (45)Signed Off (18)Violation (6)Inspection (18)Objection (13)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
11/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S8
08/11/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S3
06/17/2025
Signed off — Alteration
B01014039-I1
06/06/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S5
06/06/2025
Signed off — Alteration
Provide temporary dry standpipe during construction activity as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# B00640786-I1
B00712197-I1
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-Z2
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S2
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S1
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S4
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S6
06/02/2025
Signed off — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-S7
05/26/2025
Signed off — Alteration
Install new temporary construction fence as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #B00640786-I1.
B08007215-I1
05/14/2025
Permit issued — Plumbing
B00640786-S3-PL
05/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Matthew Wavro
05/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
B00905049-I1
04/23/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00947242-I1
04/23/2025
Signed off — Alteration
TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00934533-I1
04/23/2025
Violation issued (FDNY_ORDER, closed)
04/22/2025
Filed — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-B5
04/17/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Matthew Wavro
04/07/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
Matthew Wavro
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
04/07/2025
Special inspection requirement — Heating Systems
Matthew Wavro
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
04/07/2025
Special inspection requirement — Shutoff dampers
Matthew Wavro
04/07/2025
Special inspection requirement — Final
Matthew Wavro
04/07/2025
Special inspection requirement — Maintenance information
Matthew Wavro
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2025
Filed — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-B4
03/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
Matthew Wavro
03/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
03/24/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
03/24/2025
Special inspection requirement — Heating Systems
Matthew Wavro
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
03/24/2025
Special inspection requirement — Maintenance information
Matthew Wavro
03/24/2025
Special inspection requirement — Final
Matthew Wavro
03/24/2025
Special inspection requirement — Shutoff dampers
Matthew Wavro
03/19/2025
Permit issued — Mechanical Systems
B00640786-Z2-MS
03/19/2025
Permit issued — General Construction
B00640786-I1-GC
03/18/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Matthew Wavro
03/18/2025
Special inspection requirement — Sprayed fire-resistant materials
Matthew Wavro
03/18/2025
Special inspection requirement — Concrete - Precast
Matthew Wavro
03/18/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Matthew Wavro
03/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
03/18/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Matthew Wavro
03/18/2025
Special inspection requirement — Masonry
Matthew Wavro
03/18/2025
Special inspection requirement — Subgrade Inspections
Matthew Wavro
03/12/2025
Filed — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-B2
03/04/2025
Filed — New Building
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy.
B00640786-B1
02/07/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/14/2025
Violation issued (ECB, closed)
Unknown
01/09/2025
Permit issued — Supported Scaffold
B00905049-I1-SF
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP05/14/2025
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC03/19/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC03/19/2025
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION01/09/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN11/21/2024
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN11/21/2024
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN11/21/2024
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC11/21/2024
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP10/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP09/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP09/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP09/26/2024
DOB NOWStructuralSigned-offMONADNOCK GEN'L CONT INC08/01/2024
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC07/31/2024
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC07/30/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP05/28/2024
DOB NOWSolarSigned-offVOLTAIR SOLAR LLC05/20/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP05/13/2024
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC11/21/2023
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN11/17/2023
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN11/15/2023
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN11/14/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP10/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP10/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP10/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP10/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP09/28/2023
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC08/25/2023
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN08/21/2023
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN08/18/2023
DOB NOWEarth WorkSigned-offMONADNOCK GEN'L CONT INC08/16/2023
DOB NOWStructuralSigned-offMONADNOCK GEN'L CONT INC08/15/2023
DOB NOWFoundationSigned-offMONADNOCK GEN'L CONT INC08/02/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC08/02/2023
DOB NOWSupport of ExcavationSigned-offMONADNOCK GEN'L CONT INC08/01/2023
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION07/18/2023
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP05/22/2023
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP05/11/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN04/27/2023
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN04/18/2023
+ 5 more permits on file
1 project · most recent 04/22/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2025Signed-offMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems, Ventilation Systems
Ventilation
N/A N/A 400 CFM ×8
Heat / Cool
Lg ARUM144BTE5 144,000 BTU · Vrf Outdoor ×37
ARUM121BTE5 121,000 BTU · Vrf Outdoor ×20
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×17
ARUM168BTE5 168,000 BTU · Vrf Outdoor ×1
ARUN038GSS4 38,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/22/2025
Sprinkler System
FiledStatusContractorScope
04/22/2025Signed-offCMA PLUMBING & HEATING INSprinkler System
1 project · most recent 04/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/22/2025Signed-offM. EARLY PLBG & HTG CORPGas, Storm, Water/Sanitary
8 projects · most recent 03/20/2025
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
03/20/2025CompleteB.P. ELECTRIC CORP—
03/13/2025CompleteB.P. ELECTRIC CORP—
04/03/2024CompleteGLO ELECTRIC LLCGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
03/05/2024CompleteTUXEDO ELEC'L CONTR'G INC—
03/05/2024CompleteTUXEDO ELEC'L CONTR'G INC—
10/13/2023CompleteANTHONY G FERRY INC—
10/04/2023CompleteAMBER LITE ELECTRIC CORP.1 meters, 1 new_meters
09/28/2023CompleteANTHONY G FERRY INCGeneral Wiring
1 project · most recent 04/22/2025
Steel Concrete Masonry
FiledStatusContractorScope
04/22/2025Signed-offM. EARLY PLBG & HTG CORPSteel, Concrete, Masonry
1 project · most recent 06/09/2021
Fence
FiledStatusContractorScope
06/09/2021——Fence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
11/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/19/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/01/2024Pass-Final PL - UndergroundPassView ↗
06/13/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/01/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/14/2023Pass-Final PL - UndergroundPassView ↗
08/11/2023Pass-Final PL - UndergroundPassView ↗
07/20/2023Pass-Final PL - UndergroundPassView ↗
07/13/2023Pass-Final PL - UndergroundPassView ↗
05/19/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/06/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMatthew Wavrospecial
04/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMatthew Wavrospecial
04/07/2025FinalMatthew Wavroprogress
04/07/2025Heating SystemsMatthew Wavrospecial
04/07/2025Mechanical SystemsMatthew Wavrospecial
04/07/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
04/07/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
04/07/2025Maintenance informationMatthew Wavroenergy_progress
04/07/2025Shutoff dampersMatthew Wavroenergy_progress
04/07/2025HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
04/07/2025Duct leakage testing, insulation and designMatthew Wavroenergy_progress
03/24/2025Duct leakage testing, insulation and designMatthew Wavroenergy_progress
03/24/2025Shutoff dampersMatthew Wavroenergy_progress
03/24/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
03/24/2025Maintenance informationMatthew Wavroenergy_progress
03/24/2025Heating SystemsMatthew Wavrospecial
03/24/2025Mechanical SystemsMatthew Wavrospecial
03/24/2025FinalMatthew Wavroprogress
03/24/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
03/24/2025HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
03/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMatthew Wavrospecial
03/18/2025Sprayed fire-resistant materialsMatthew Wavrospecial
03/18/2025Concrete - PrecastMatthew Wavrospecial
03/18/2025Post-installed AnchorsMatthew Wavrospecial
03/18/2025Concrete - Cast-In-PlaceMatthew Wavrospecial
Latest 25 of 150.
▾Documents — 379 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
09/01/2026B00534235-I1Request digital key ↗
08/29/2026B00712197-P1Request digital key ↗
08/29/2026B00712197-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits8
▸DOB NOWHPD - Permit Notice5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/08/2024340840530Open ↗
04/25/2022340840530Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/14/2022340840530Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/10/2024321601913Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/10/2024321601913Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/10/2024321601913Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications237
▸DOB NOWProgress Inspector Seal & Signature111
09/25/2026B00640786-B4Open ↗
09/25/2026B00640786-B4Open ↗
09/25/2026B00640786-B4Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature78
09/25/2026B00640786-B4Open ↗
09/25/2026B00640786-B4Open ↗
09/25/2026B00640786-B2Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
08/28/2026B08007215-I1Open ↗
08/26/2026B00934533-P1Open ↗
08/26/2026B00934533-I1Open ↗
Showing 3 of 46 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/25/2022340840530Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/25/2022340840530Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026B00640786-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
11/14/2022340840530Open ↗
05/25/2022340840530Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/14/2022340840530Open ↗
▸BISSTREET TREE SIGNOFF1
03/03/2026340840530Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/25/2022340840530Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWOER: Notice to Proceed1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/23/2026B00640786-A8Open ↗
08/23/2026B00640786-S1Open ↗
08/23/2026B00640786-S5Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/10/2024321601913Open ↗
07/10/2024321601913Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/04/2026340840530Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
03/12/2024340840530Open ↗
11/14/2022340840530Open ↗
07/26/2022340840530Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/25/2022340840530Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
12/09/2022340840530Open ↗
07/26/2022340840530Open ↗
04/25/2022340840530Open ↗
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
07/10/2024321601913Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type