Roof5p · 2 filings · 20 docs
PlumbingStructural
Installation of exterior canopy for restaurant seating area as shown on plans
On file for this job
11 documents · 2 drawing sheets
No filed description on record for this job.
On file for this job
31 documents · 3 drawing sheets
Bulkhead1p · 1 filing · 20 docs
Architecture
Structural work to include wall panels for retail space at 1st floor as shown on plans.
On file for this job
30 documents · 1 drawing sheet
Floor 431p · 1 filing · 2 docs
Architecture
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 421p · 2 filings · 4 docs
ArchitectureFire Protection
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 341p · 1 filing · 11 docs
Architecture
General construction and structural work as shown on plans for facade repair (FISP Cycle 9A - Local Law 11).
On file for this job
11 documents · 1 drawing sheet
Floor 33
Floor 321p · 1 filing · 8 docs
Fire Protection
Modifications to an existing sprinkler system. Jane St - Fl 4.
On file for this job
8 documents · 1 drawing sheet
Floor 31
Floor 30
Floor 29
Floor 281p · 1 filing · 7 docs
Mechanical
Mechanical work as shown on plans
On file for this job
7 documents · 1 drawing sheet
Floor 275p · 1 filing · 10 docs
Mechanical
Mechanical work as shown on plans filed herewith.
On file for this job
10 documents · 5 drawing sheets
Floor 26
Floor 253p · 1 filing · 14 docs
Mechanical
Modifications to an existing sprinkler system (Scotiabank).
On file for this job
14 documents · 3 drawing sheets
Floor 241p · 1 filing · 14 docs
Mechanical
Modifications to an existing sprinkler system (Scotiabank).
On file for this job
14 documents · 1 drawing sheet
Floor 23Under Construction11p · 2 filings · 18 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction
General demolition as shown on plans.
On file for this job
4 documents
Modifications to an existing sprinkler system (Scotiabank).
On file for this job
14 documents · 4 drawing sheets
Floor 22Under Construction9p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction
General demolition as shown on plans.
On file for this job
4 documents
General construction work as shown on plans. Floor 22 (Construction)/ 23 (Marketing). [Scotiabank].
On file for this job
4 documents · 2 drawing sheets
Floor 21Under Construction5p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Filing herewith drawings indicating modification of the Plumbing on the 20th floor construction (marketing as the 21st floor). No change in use, egress, or occupancy under this application.
On file for this job
19 documents · 1 drawing sheet
Filing herewith drawings indicating modification of the Sprinkler System on the 20th floor construction (marketing as the 21st floor). No change in use, egress, or occupancy under this application.
On file for this job
6 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
10 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Under Construction8p · 2 filings · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Filing herewith drawings indicating modification of the Sprinkler System on the 20th floor construction (marketing as the 21st floor). No change in use, egress, or occupancy under this application.
On file for this job
6 documents
Plumbing work as shown on plans (Floor 19 & 20 - Office Renovation).
On file for this job
28 documents · 3 drawing sheets
Floor 193p · 2 filings · 20 docs
Fire ProtectionPlumbing
Plumbing work as shown on plans (Floor 19 & 20 - Office Renovation).
On file for this job
28 documents · 2 drawing sheets
Modifications to an existing sprinkler system (Northeast Office Expansion - Jane St).
On file for this job
8 documents · 1 drawing sheet
Floor 1822p · 3 filings · 20 docs
ArchitectureDMMechanicalStructural
STRUCTURAL WORK AS SHOWN ON PLANS
On file for this job
45 documents · 1 drawing sheet
Structural work as shown on plans. Jane St - Fl 17 (Construction)/18 (Marketing)
On file for this job
47 documents · 20 drawing sheets
No filed description on record for this job.
On file for this job
5 documents · 1 drawing sheet
Floor 179p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
STRUCTURAL WORK AS SHOWN ON PLANS
On file for this job
45 documents · 8 drawing sheets
Structural work as shown on plans. Jane St - Fl 17 (Construction)/18 (Marketing)
On file for this job
47 documents · 1 drawing sheet
Floor 16
Floor 15Under Construction40p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Job M01369869Permit Issued · 09/18/2026
Structural work as shown on plans filed herewith.
On file for this job
6 documents
Job M01370136Permit Issued · 09/18/2026
Structural work as shown on plans filed herewith.
On file for this job
8 documents
Structural work as shown on plans filed herewith.
On file for this job
29 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 14Under Construction73p · 12 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
42 documents · 4 drawing sheets
Modifications to an existing sprinkler/standpipe system. Floor 14 (Construction)/15 (Marketing). Phase 2.
On file for this job
1 drawing sheet
General construction work as shown on plans to level 14 terrace. Floor 13 (Construction)/14 (Marketing).
On file for this job
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 13Under Construction126p · 8 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Job M01369869Permit Issued · 09/18/2026
Structural work as shown on plans filed herewith.
On file for this job
6 documents
Structural work as shown on plans filed herewith.
On file for this job
25 documents · 19 drawing sheets
Structural work as shown on plans filed herewith.
On file for this job
27 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 12Under Construction133p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
28 documents · 2 drawing sheets
Structural work as shown on plans filed herewith.
On file for this job
27 documents · 14 drawing sheets
Structural work as shown on plans filed herewith.
On file for this job
42 documents · 5 drawing sheets
Floor 11Under Construction122p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
28 documents · 14 drawing sheets
Structural work as shown on plans filed herewith.
On file for this job
42 documents · 5 drawing sheets
Structural work as shown on plans (Jane St - Floors 9 & 10).
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 10Under Construction93p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Plumbing · Structural
Structural work as shown on plans filed herewith.
On file for this job
28 documents · 2 drawing sheets
SPRINKLER WORK AS SHOWN ON PLANS
On file for this job
19 documents · 5 drawing sheets
General construction work as shown on plans to include interior renovations and non-structural demolition (Jane St - Floors 9 & 10)
On file for this job
8 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 9Under Construction36p · 14 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
Structural
Structural work including new steel framing and support to new elevator rails and buffers at 1st floor, new elevator machines at 8th floor EMR, and new hoist beams below the 8th floor, as shown on plans filed herewith.
On file for this job
6 documents
General construction work as shown on plans to include interior renovations and non-structural demolition (Jane St - Floors 9 & 10)
On file for this job
8 documents · 8 drawing sheets
Mechanical work as shown on plans. Floors 4, 9, 10.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 845p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Structural
Installation of mechanical equipment as shown on plans. No change in egress, use, or occupancy. (Jane Street 4th, 7th & 8th floors)
On file for this job
17 documents · 6 drawing sheets
Plumbing work as shown on plans. No change in use, egress, or occupancy.
On file for this job
12 documents · 3 drawing sheets
Sprinkler work as shown on plans. No change in use, egress, or occupancy. (Jane Street 4th, 7th and 8th Floors)
On file for this job
14 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 717p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of mechanical equipment as shown on plans. No change in egress, use, or occupancy. (Jane Street 4th, 7th & 8th floors)
On file for this job
17 documents · 5 drawing sheets
Plumbing work as shown on plans. No change in use, egress, or occupancy.
On file for this job
12 documents · 2 drawing sheets
Sprinkler work as shown on plans. No change in use, egress, or occupancy. (Jane Street 4th, 7th and 8th Floors)
On file for this job
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 644p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Plumbing
Modifications to an existing standpipe system to include installation of (3) fire hose valve cabinets on the 6th floor as shown on plans.
On file for this job
9 documents · 2 drawing sheets
Plumbing work as shown on plans. No change in use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
Plumbing work as shown on plans. No change to use, egress, or occupancy. (Jane Street 6th Floor)
On file for this job
7 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 513p · 15 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Mechanical work as shown on plans (Jane Street - Floor 4).
On file for this job
8 documents
Plumbing work as shown on plans (Jane Street, Floors 4 and 5).
On file for this job
3 documents · 1 drawing sheet
Mechanical work as shown on plans at the 5th floor (Jane Street).
On file for this job
21 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 454p · 21 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Structural
Installation of mechanical equipment as shown on plans. No change in egress, use, or occupancy. (Jane Street 4th, 7th & 8th floors)
On file for this job
17 documents · 3 drawing sheets
Sprinkler work as shown on plans. No change in use, egress, or occupancy. (Jane Street 4th, 7th and 8th Floors)
On file for this job
14 documents · 1 drawing sheet
Filing PAA for modification to existing sprinkler system. (Jane Street- Phase 2)
On file for this job
15 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3Under Construction151p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL WORK AS SHOWN ON PLANS
On file for this job
84 documents · 9 drawing sheets
Support steel for composite slab infill and beam web penetrations.
On file for this job
53 documents · 25 drawing sheets
Structural work as shown on plans
On file for this job
24 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2115p · 17 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Mechanical work as shown on plans (Brookfield Building Office Relocation).
On file for this job
4 documents · 3 drawing sheets
General Construction: General construction work as shown on plans (Brookfield Building Office Relocation).
On file for this job
8 documents · 1 drawing sheet
Plumbing work as shown on plans (Brookfield Building Office Relocation).
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction56p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
General construction in conjunction with increase in occupant load at floor 4 as shown. New partition and door upgrades to create areas of refuge. Obtain amended certificate of occupancy. (Jane St)
On file for this job
15 documents
THIS APPLICATION FILED FOR EXPANSION OF KITCHEN AREA AND CORRESPONDING REDUCTION OF OFFICE OCCUPANCY. AREAS OUTSIDE OF SCOPE OF WORK SHOWN ON THE PLANS SUBMITTED HEREWITH HAVE BEEN PREVIOUSLY FILED UNDER ALT 1 APPLICATION NUMBER 12389086.
On file for this job
14 documents
Application filed for change of use occupancy to the 17th construction floor/18th marketing floor and to establish place of assembly as shown on plans.
On file for this job
12 documents
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction16p · 6 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
General construction in conjunction with increase in occupant load at floor 4 as shown. New partition and door upgrades to create areas of refuge. Obtain amended certificate of occupancy. (Jane St)
On file for this job
15 documents
INCREASE IN OCCUPANT LOAD AND NEW PA SPACE AT 16TH FLOOR (MARKETING: 17TH)
On file for this job
15 documents
THIS APPLICATION FILED FOR EXPANSION OF KITCHEN AREA AND CORRESPONDING REDUCTION OF OFFICE OCCUPANCY. AREAS OUTSIDE OF SCOPE OF WORK SHOWN ON THE PLANS SUBMITTED HEREWITH HAVE BEEN PREVIOUSLY FILED UNDER ALT 1 APPLICATION NUMBER 12389086.
On file for this job
14 documents
Latest 3 of 6 filings on this floor.
CellarUnder Construction16p · 8 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction
General construction in conjunction with increase in occupant load at floor 4 as shown. New partition and door upgrades to create areas of refuge. Obtain amended certificate of occupancy. (Jane St)
On file for this job
15 documents
INCREASE IN OCCUPANT LOAD AND NEW PA SPACE AT 16TH FLOOR (MARKETING: 17TH)
On file for this job
15 documents
Structural work as shown on plans (Jane St - Fl 3).
On file for this job
44 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction26p · 8 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Structural work as shown on plans
On file for this job
9 documents · 4 drawing sheets
Relocation of conduit
On file for this job
3 documents
Modifications to an existing standpipe system to include installation of new fire pump servicing 100 West Street.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.