ECB09/27/2026Note: at time of inspection, i observed a 14-story existing building undergoing full alteration operations, with the existing wet standpipe system remaining in service, contrary to 3303.8 (4) which requires the$5K due
ECB09/27/2026Note: at time of inspection of an active construction site, the required standpipe system was observed to have been drained of water and was not in a state of readiness. The standpipe system a required fire pro$5K due
ECB08/11/2026At time of inspection observed area where worker in 10 b apartment was injured while sanding ceiling area on a 3' a-frame ladder causing fall resulting in back injury. Unable to walk ems recued and taken to har$2K due
ECB06/08/2026Obs construction operations in progress without the construction superintendent adequately exercising direct oversight& ensuring compliance with applicable safety requirements. Required site safety controls, co$5K due
ECB06/08/2026Observed designated rigger foreman letter on site issued by big sky construction co., inc.; however, work permit is held by je levine builders, inc. Required designation was not provided by the permit holder. F$1K due
DOB02/22/2024Failed to file FISP cycle 9C technical report by 2/21/2024
HPD05/20/2005§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORS AT BASE CABINET IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
HPD05/20/2005§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE KNOBS TO STOVE IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
ECB06/08/2026Obs ssp was inadequate &did not accurately reflect field conditions. Suspended scaffold installations in use on the project were not identified, depicted, or otherwise addressed within the approved site safetyHearing held — result not yet published$1K proposed
ECB07/30/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906704. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB07/17/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906710. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB07/17/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906708. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB07/17/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906707. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/08/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906705. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB04/08/2025Failure to submit an acceptable required cycle 9C report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #906709. Remedy: submit acceptable requNothing owed — awaiting certificate of correction
ECB12/12/201428-110.1,10HR osha.noted:mr.kimmy guerrero was in processon of a(fraudenbent)10HR osha card.mr.guerrero stated that he obtain card from a(fruen)for the amount of $70.08,& a did not attend a school.rem:comply w/Nothing owed — awaiting certificate of correction