← Back
BuildNYC
Miscellaneous two family
250 YORK AVENUE
STATEN ISLAND · BIN 5169985
💬 Discuss this project
2018Year Built
2Stories
B9Building Class
R3-2Zoning
1,804 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Miscellaneous two family · 3,405 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 2 docs
Floor 11p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri107/07/2023
Ryan Design Architecture104/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio203/21/2026
Ryan Design Architecture103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Flow-Right Plumbing & HeatingPlumbing803/22/2026
Kle ConstructionGeneral Contractor303/21/2026
D.G. of SIGeneral Contractor307/08/2026
Frank A VaccaroElectrical103/21/2026
HI-Rite ElectricElectrical103/21/2026
Building Lifecycle
08/02/2023
Signed off — Alteration
RESOLVE HPD COMPLAINTS, UPDATES KITCHEN CABINETS, REPAINTING ENTIRE APARTMENT AND RESURFACE FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00901016-I1
07/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2023
Signed off — Alteration
S00000487-I1
07/10/2023
Permit issued — General Construction
S00901016-I1-GC
07/07/2023
Filed — Alteration
RESOLVE HPD COMPLAINTS, UPDATES KITCHEN CABINETS, REPAINTING ENTIRE APARTMENT AND RESURFACE FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00901016-I1
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKle Construction07/10/2023
DOB NOWCurb CutSigned-offD.G. of SI11/15/2018
BISPLISSUEDFlow-Right Plumbing & Heating04/04/2018
BISEQISSUEDD.G. of SI01/24/2018
BIS—ISSUEDD.G. of SI01/24/2018
2 projects · most recent 11/25/2024
General Wiring Lighting
FiledStatusContractorScope
11/25/2024CompleteHI-Rite Electric—
04/03/2018CompleteRidge ElectricGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
77 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account