← Back
Single or multiple dwelling with stores or offices
2500 AMSTERDAM AVENUE
MANHATTAN · Washington Heights (North) · BIN 1063711
💬 Discuss this project
1900Year Built
3Stories
S9Building Class
R7-2Zoning
5,610 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: 2500 AMSTERDAM OWNER LLC · 2,292 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Roof1p · 1 filing · 3 docs
Floor 33p · 1 filing · 2 docs
Floor 2
Floor 14p · 1 filing · 2 docs
Site & exterior22p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NSACONTRACTING607/08/2026
SAFE-SHIELD ENTERPRISES INC503/22/2026
PRESPECTIVE GENERAL CONSTRUCTION IN407/08/2026
EXPEDITE GENERAL CONTRACTING307/08/2026
2500 AMSTERDAM OWNER LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2023$1.5M—AMSTERDAM MIXED USE OWNER LLC → 2500 AMSTERDAM OWNER LLC$267/sf building
04/05/2022$2.5M—— → —$447/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC112/02/2024
ASHRAF CORP208/08/2023
NY RESTORATION TECHNOLOGY CORP201/24/2023
ENTHINK ENGINEERS LLC106/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA ENGINEERING P C203/21/2026
DANICO SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NADEEM AKHTARGeneral Contractor407/08/2026
PERSPECTIVE GENERAL CONSTGeneral Contractor407/08/2026
EXPEDITE GENERAL CONTRACTGeneral Contractor407/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor303/21/2026
EXPERT CONSTRUCTION NYCGeneral Contractor107/08/2026
JUAN MOLINAElectrical103/21/2026
JESUS CORPORANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187101/24/2023
Building Lifecycle
All (70)Filed (6)Permit Issued (8)Signed Off (6)Violation (44)Inspection (2)Special Inspection (4)
05/14/2026
Signed off — Alteration
M00533975-I1
03/15/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
M00895802-I1
01/24/2025
Signed off — Alteration
M01147378-I1
12/17/2024
Permit issued — General Construction
M01147378-I1-GC
12/02/2024
Filed — Alteration
M01147378-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/12/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00895834-I1
08/17/2023
Permit issued — Supported Scaffold
M00895834-I1-SF
08/09/2023
Permit issued — Supported Scaffold
M00895834-I1-SF
08/08/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00895834-I1
07/17/2023
Permit issued — Sidewalk Shed
M00895802-I1-SH
07/15/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
M00895802-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2023
Signed off — Alteration
M08001130-I1
04/20/2023
Signed off — Alteration
Limited facade repairs to residential portion of building as per plans; no change to use, egress, or occupancy.
M00816797-I1
01/27/2023
Permit issued — General Construction
M00816797-I1-GC
01/24/2023
Filed — Alteration
Limited facade repairs to residential portion of building as per plans; no change to use, egress, or occupancy.
M00816797-I1
01/23/2023
Special inspection requirement — Masonry
Hamidreza Saghari
01/23/2023
Special inspection requirement — Final
Hamidreza Saghari
01/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
01/23/2023
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
10/06/2022
Permit issued — Sidewalk Shed
M00533975-I1-SH
09/19/2022
Permit issued — Construction Fence
M08001130-I1-FN
09/12/2022
Filed — Alteration
M08001130-I1
01/31/2022
Violation issued (ECB, closed)
Construction
01/14/2022
Violation issued (ECB, closed)
Construction
11/24/2021
Violation issued (ECB, closed)
Construction
09/30/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/13/2021
Violation issued (ECB, closed)
Construction
07/13/2021
Violation issued (ECB, closed)
Construction
06/09/2021
Permit issued — Sidewalk Shed
M00533975-I1-SH
06/04/2021
Filed — Alteration
M00533975-I1
06/02/2021
Violation issued (ECB, closed)
Construction
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/29/2021
Violation issued (ECB, closed)
Construction
05/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2017
Violation issued (ECB, closed)
Boilers
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEXPERT CONSTRUCTION NYC12/17/2024
DOB NOWSupported ScaffoldSigned-offNADEEM AKHTAR08/17/2023
DOB NOWSupported ScaffoldSigned-offNADEEM AKHTAR08/09/2023
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN07/17/2023
DOB NOWGeneral ConstructionSigned-offEXPEDITE GENERAL CONTRACT01/27/2023
DOB NOWSidewalk ShedSigned-offPERSPECTIVE GENERAL CONST10/06/2022
DOB NOWConstruction FenceSigned-offEXPEDITE GENERAL CONTRACT09/19/2022
DOB NOWSidewalk ShedSigned-offPERSPECTIVE GENERAL CONST06/09/2021
BISPLISSUEDH BRONNER & SON PLBG & HTG04/07/1999
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/05/1999
4 projects · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteOM ELECTRIC, INCGeneral Wiring
08/06/2024CompleteOM ELECTRIC, INCGeneral Wiring
08/17/2023Permit IssuedK.N.C ELECTRIC INC—
09/27/2022Permit IssuedCLAIRMONT ELEC'L CONTR'G—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/23/2023MasonryHamidreza Sagharispecial
01/23/2023FinalHamidreza Saghariprogress
01/23/2023Energy Code Compliance InspectionsHamidreza Saghariprogress
01/23/2023Air barrier - visual inspectionHamidreza Sagharienergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00533975-I1Request digital key ↗
09/01/2026M08001130-I1Request digital key ↗
09/01/2026M00816797-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00533975-I1Open ↗
09/01/2026M08001130-I1Open ↗
08/13/2026M01147378-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026M00816797-I1Open ↗
08/23/2026M00816797-I1Open ↗
08/23/2026M00816797-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00816797-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00816797-I1Open ↗
08/13/2026M01147378-I1Open ↗