2505 STILLWELL AVENUE
BROOKLYN · Gravesend (South) · BIN 3195636
💬 Discuss this project
1931Year Built
1Stories
G1Building Class
M1-1Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
All parking garages · Owner of record: ALEXANDRINA LLC · 0.12 FAR built · Flood zone X500
Locations of Work
Plumbing
Floor 12p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALEXANDRINA707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT212/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965212/01/2021
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Violation (4)Inspection (1)Special Inspection (2)
10/07/2022
Violation issued (FDNY_NOV, closed)
12/01/2021
Filed — Alteration
REPLACE 1 MODINE HEATEER, REPLACEGAS PIPING AND GAS METER.
B00627827-P1
12/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
12/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
11/26/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2021
Permit issued — Plumbing
B00627827-I1-PL
11/10/2021
Filed — Alteration
REPLACE 1 MODINE HEATEER, REPLACEGAS PIPING AND GAS METER.
B00627827-I1
05/04/1998
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (ECB, closed)
Construction
12/12/1995
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLS PLUMBING CORP11/19/2021
BISOTISSUEDSTILLWELL AUTO PARTS & REPAIR SH02/22/2001
1 project · most recent 12/01/2021
Gas
FiledStatusContractorScope
12/01/2021Signed-offRITE WAY HEATING CORPGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/26/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
12/01/2021Fire-Resistant Penetrations and JointsSYED RIZVIspecial
12/01/2021Fire-Resistant Penetrations and JointsSYED RIZVIspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00627827-P1Request digital key ↗
08/31/2026B00627827-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00627827-P1Open ↗
08/13/2026B00627827-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00627827-P1Open ↗
08/23/2026B00627827-I1Open ↗