DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
ECB10/17/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM. NOTED: CREATED 1 ROOM AT 2ND FLOOR USED AS SLEEPING QUARTERS/BEDROOM WITHOUT R$2K due
ECB10/17/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE) FOR 2 ROOMS USED AS$2K due
ECB10/14/2025ELECTRICAL WORK WITHOUT A PERMIT AT 2ND FLOOR. ELECTRICAL LINES AND OUTLETS INSTALLED FOR HOT WATER HEATER, WASHER AND DRYER. REMEDY: OBTAINPERMIT.$2K due
ECB10/14/2025OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O #98491. RECORDS INDICATE,2ND FLOOR IS LEGALLY APPROVED AS 3 OFFICES. NOW, 2ND FLOOR IS ILLEGALLY OCCUPIED/CONVERTED INTO A HEALTH AND FITNESS ESTABLISHMENT/AMBULATOR$2K due
ECB10/14/2025ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT. A PRIBITED USE PER ZA 12-10 OPERATING IN A C1-2 ZONING DSITRICT. DOING BUSINESS AS "K ACUPUNTURE AND BODY WORK" ON THE 2ND FLOO$1K due
ECB10/14/2025WORK WITHOUT A PERMIT AT 2ND FLOOR. INSTALLED WATER AND WASTE LINES FOR SHOWER ROOM. PLUMBING LINES INSTALLED FOR HIT WATER HEATER AND WASHER. REMEDY: OBTAIN PERMITS.$1K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/11/2016V-DOB VIOLATION - ACTIVE
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/07/1994V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
DOB11/05/199032....INSTALL NEW BAROMETIC DAMPER ON FLUE PIPE EXISTING DAMPER DEFECTIVE
ECB08/25/2016AS PER CLASS 2(B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER D.O.B.RECORDS.SUBMIT A CURRENT BO-9 REPORT CORRECT ALL VIOLATING CONDITIONS AND SUBMIT THE CERTIFICATE OF CORRECTION.Nothing owed — awaiting certificate of correction