← Back
Three families
251 BEDFORD PARK BLVD
BRONX · BIN 2017128
💬 Discuss this project
1900Year Built
2.5Stories
C0Building Class
R7AZoning
2,200 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Three families · 3,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof1p · 1 filing · 2 docs
Bulkhead1p · 1 filing · 3 docs
Floor 51p · 1 filing · 2 docs
Floor 41p · 1 filing · 3 docs
Floor 31p · 1 filing · 2 docs
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar2p · 2 filings · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2022$1.2M—— → —$568/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC108/13/2026
KING DAVID ARCHITECTURE PC109/08/2024
Building Lifecycle
All (4)Filed (2)Violation (2)
08/13/2026
Filed — Alteration
PROPOSED SPRINKLER SYSTEM FOR A SIX STORY MIXED USE BUILDING
X01431545-I1
08/06/2025
Violation issued (HPD, open)
C
08/06/2025
Violation issued (HPD, open)
B
09/08/2024
Filed — New Building
X01102721-I1
Nothing on file for this building.
1 project · most recent 08/13/2026
FiledStatusContractorScope
08/13/2026———
1 project · most recent 08/13/2026
FiledStatusContractorScope
08/13/2026———
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/13/2026Seismic Isolation Systems—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Post-installed Anchors—special
07/15/2026Sprinkler Systems—special
03/14/2025Preliminary—progress
03/14/2025Energy Code Compliance Inspections—progress
03/14/2025Fire-Resistance Rated Construction—progress
03/14/2025Maintenance information—energy_progress
03/13/2025Electrical motors and elevators—energy_progress
03/13/2025Metering—energy_progress
08/29/2024Fire-Resistant Penetrations and Joints—special
08/29/2024Subgrade Inspections—special
08/29/2024Excavations - Sheeting, Shoring, and Bracing—special
08/29/2024Masonry—special
08/29/2024Air barrier - visual inspection—energy_progress
08/29/2024Subsurface Investigations (Borings/Test Pits)—special
08/29/2024Lighting controls—energy_progress
08/29/2024Air barrier — testing —energy_progress
08/29/2024Fenestration and door U-factor and product ratings—energy_progress
08/29/2024Lighting in dwelling units—energy_progress
08/29/2024Fenestration areas—energy_progress
08/29/2024Exterior lighting power—energy_progress
08/29/2024Fenestration air leakage—energy_progress
08/29/2024Insulation placement and R values—energy_progress
08/29/2024Interior lighting power—energy_progress
Latest 25 of 28.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01431545-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01102721-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01431545-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026X01102721-I1Open ↗