← Back
Elevator apt, semi-fireproof with stores
Douglass Port
251 DOUGLAS STREET · BIN 3006610
💬 Discuss this project
2024Year Built
15Stories
D7Building Class
M1-4/R7XZoning
250,496 sfGross Floor Area
262Units
1 Open Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: GOWANUS DOUGLASS STREET LLC · 28,500 sf lot · 8.79 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingEquipment
Roof3p · 2 filings · 20 docs
Floor 151 filing · 20 docs
Floor 141p · 2 filings · 20 docs
Floor 131 filing · 20 docs
Floor 121 filing · 20 docs
Floor 111 filing · 20 docs
Floor 101 filing · 20 docs
Floor 91 filing · 20 docs
Floor 81 filing · 20 docs
Floor 71 filing · 20 docs
Floor 61 filing · 20 docs
Floor 51 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP1707/08/2026
OWNERS REP803/22/2026
BROADWAY CONSTRUCTION GRO803/22/2026
GRO BROADWAY CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PLAN B ENGINEERING306/10/2025
RIGID STRUCTURAL DESIGN, LLC409/30/2024
PAUL PERDEK, PROF. ENG. PLLC203/29/2022
ANCORA ENGINEERING, PLLC101/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM203/21/2026
Rigid Structural Design, LLC803/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY CONSTRUCTION GROGeneral Contractor2807/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor1707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1203/21/2026
XOLLE DEMO LLCGeneral Contractor603/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection607/08/2026
CARA PLUMBING GROUP INCPlumbing207/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
ORBA ELECTRIC, INCElectrical103/22/2026
LIMONGELLI ELECTRIC CORPElectrical103/22/2026
Building Lifecycle
All (104)Filed (10)Permit Issued (43)Signed Off (7)Violation (11)Inspection (31)Objection (2)
08/24/2026
Signed off — Alteration
B00661581-I1
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Signed off — Alteration
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
B01084366-I1
05/11/2026
Signed off — Alteration
B01084356-I1
05/05/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/17/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/23/2026
Signed off — Alteration
Cars 1A & 2B: Installation of temporary dual Personnel/Material hoists per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00992646-I1
02/17/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2025
Permit issued — Sidewalk Shed
B01084356-I1-SH
08/01/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/29/2025
Permit issued — Protection and Mechanical Methods
B01084366-I1-PMM
06/10/2025
Filed — Alteration
Cars 1A & 2B: Installation of temporary dual Personnel/Material hoists per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00992646-P2
06/02/2025
Violation issued (ECB, closed)
Construction
05/16/2025
Permit issued — Support of Excavation
B00621061-S2-SE
05/15/2025
Permit issued — Protection and Mechanical Methods
B00992646-I1-PMM
05/14/2025
Signed off — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01112261-I1
05/14/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
05/14/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/01/2025
Permit issued — Protection and Mechanical Methods
B00992646-I1-PMM
04/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2025
Violation issued (ECB, closed)
Construction
04/03/2025
Violation issued (ECB, closed)
Construction
03/31/2025
Violation issued (ECB, closed)
Construction
03/07/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/05/2025
Permit issued — Plumbing
B00621061-S5-PL
12/23/2024
Permit issued — Earth Work
B00621061-S9-EA
12/23/2024
Permit issued — Support of Excavation
B00621061-S2-SE
12/23/2024
Permit issued — Structural
B00621061-S3-ST
12/23/2024
Permit issued — Mechanical Systems
B00621061-S4-MS
12/23/2024
Permit issued — Foundation
B00621061-S8-FO
12/20/2024
Violation issued (ECB, closed)
Unknown
12/20/2024
Violation issued (ECB, closed)
Unknown
12/12/2024
Permit issued — Foundation
B00621061-S8-FO
10/29/2024
Permit issued — Standpipe
B00621061-S7-EW-SD
10/28/2024
Permit issued — Standpipe
B00621061-S6-EW-SP
10/28/2024
Permit issued — Sprinklers
B00621061-S6-EW-SD
10/24/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/01/2024
Permit issued — Protection and Mechanical Methods
B01112261-I1-PMM
09/30/2024
Filed — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01112261-I1
09/19/2024
Filed — Alteration
Cars 1A & 2B: Installation of temporary dual Personnel/Material hoists per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00992646-P1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP08/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP07/29/2025
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO05/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/01/2025
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY03/05/2025
DOB NOWEarth WorkSigned-offBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWFoundationPermit IssuedBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWFoundationPermit IssuedBROADWAY CONSTRUCTION GRO12/12/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/29/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/28/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP10/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/01/2024
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO09/12/2024
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO09/12/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP08/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP02/05/2024
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO12/28/2023
DOB NOWEarth WorkSigned-offBROADWAY CONSTRUCTION GRO12/26/2023
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO12/26/2023
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO11/03/2023
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY11/01/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP10/31/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/31/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/31/2023
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO10/10/2023
DOB NOWEarth WorkSigned-offBROADWAY CONSTRUCTION GRO10/05/2023
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO10/05/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/27/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/24/2023
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC02/28/2023
DOB NOWFoundationPermit IssuedBROADWAY CONSTRUCTION GRO04/29/2022
+ 7 more permits on file
4 projects · most recent 07/31/2024
FiledStatusContractorScope
07/31/2024CompleteTOP SHELF ELECTRIC CORP—
06/11/2024CompleteORBA ELECTRIC, INC—
01/04/2024Permit IssuedLIMONGELLI ELECTRIC CORP1 meters, 1 new_meters
03/27/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 33
DateTypeResultReport
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/17/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/17/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/14/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/14/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
Latest 25 of 33.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00661581-I1Request digital key ↗
08/30/2026B00706847-I1Request digital key ↗
08/30/2026B00706846-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
03/29/2023322095781Open ↗
10/13/2022322095781Open ↗
03/30/2022322095781Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
04/29/2025322095781Open ↗
06/02/2021322095781Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/30/2026B00706847-I1Open ↗
08/26/2026B00992646-I1Open ↗
08/24/2026B01084356-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/17/2025322095781Open ↗
03/30/2022322095781Open ↗
03/30/2022322095781Open ↗
▸Safety & Tenant Protection2
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/30/2022322095781Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/30/2022322095781Open ↗
▸Environmental & Asbestos4
▸BISRODENT CONTROL3
03/29/2023322095781Open ↗
10/13/2022322095781Open ↗
03/30/2022322095781Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/29/2023322095781Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION13
03/29/2023322095781Open ↗
03/29/2023322095781Open ↗
03/29/2023322095781Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL1
03/30/2022322095781Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/29/2023322095781Open ↗
10/13/2022322095781Open ↗
03/30/2022322095781Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
10/13/2022322095781Open ↗
03/30/2022322095781Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/13/2022322095781Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM4
03/29/2023322095781Open ↗
10/13/2022322095781Open ↗
10/13/2022322095781Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
03/29/2023322095781Open ↗
10/13/2022322095781Open ↗
▸BISEFILING COVER SHEET1
06/02/2021322095781Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/29/2023322095781Open ↗
03/29/2023322095781Open ↗