← Back
Elevator apt, semi-fireproof without stores
251 FT WASHINGTON AVENUE
MANHATTAN · Washington Heights (South) · BIN 1063415
💬 Discuss this project
1912Year Built
8Stories
D1Building Class
R8Zoning
58,167 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 251 FT. REALTY LLC · 9,595 sf lot · 6.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof1p · 1 filing · 7 docs
Floor 737p · 5 filings · 20 docs
Floor 628p · 3 filings · 20 docs
Floor 541p · 5 filings · 20 docs
Floor 428p · 3 filings · 20 docs
Floor 328p · 3 filings · 20 docs
Floor 228p · 3 filings · 20 docs
Floor 139p · 5 filings · 20 docs
Basement28p · 3 filings · 20 docs
Site & exterior11p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HELLER REALTY4509/13/2026
251 FT REALTY2503/22/2026
MNK ENTERPRISES209/01/2026
251 FT REALTY LLC C O HELLER REA203/21/2026
251 ASSOCIATES203/21/2026
HELLER REALTY 251 FT WASHINGTON LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP106/10/2026
NICHOLAS AGNETA AIA306/03/2026
GARY H SILVER ARCHITECTS PC2501/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GARY H SILVER ARCHITECTS PC5003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRISHTINA CONSTRUCTIONGeneral Contractor1207/08/2026
GREY STONE RESTORATIONGeneral Contractor603/21/2026
HENRY MYERS P & H, INCPlumbing307/08/2026
ACCURATE ELEC'L CONTR'S CElectrical203/22/2026
MNK ENTERPRISES LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GARY H SILVER ARCHITECTS13822101/02/2024
Building Lifecycle
All (182)Filed (30)Permit Issued (14)Signed Off (10)Facade (FISP) (23)Violation (60)Inspection (13)Objection (2)Special Inspection (30)
08/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01411923-I1
08/03/2026
Signed off — Alteration
Remove and Replace Defective Terra Cotta at 6 Lintels
M01409872-I1
08/03/2026
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK WITH INSPECTIONS AT 251 FORT WASHINGTON AVENUE, MANHATTAN.
M01413227-I1
07/02/2026
Permit issued — Suspended Scaffold
M01413227-I1-SC
06/30/2026
Permit issued — General Construction
M01409872-I1-GC
06/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01411923-I1
06/10/2026
Permit issued — Sidewalk Shed
M01411923-I1-SH
06/07/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK WITH INSPECTIONS AT 251 FORT WASHINGTON AVENUE, MANHATTAN.
M01413227-I1
06/03/2026
Filed — Alteration
Remove and Replace Defective Terra Cotta at 6 Lintels
M01409872-I1
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
NICHOLAS AGNETA
06/03/2026
Special inspection requirement — Masonry
NICHOLAS AGNETA
06/01/2026
Special inspection requirement — Final
NICHOLAS AGNETA
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, closed)
A
03/07/2026
Violation issued (HPD, closed)
C
03/07/2026
Violation issued (HPD, closed)
C
12/21/2025
Violation issued (HPD, closed)
C
12/21/2025
Violation issued (HPD, closed)
B
12/21/2025
Violation issued (HPD, closed)
C
12/21/2025
Violation issued (HPD, closed)
C
12/21/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
I
07/23/2025
Violation issued (HPD, open)
C
07/23/2025
Violation issued (HPD, closed)
B
06/03/2025
Cycle 10 facade report submitted
04/05/2025
Cycle 10 facade inspection completed
03/31/2025
Cycle 10 facade report signed — SAFE
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
B
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
01/02/2024
Filed — Alteration CO
WORK TYPE IS FILED ON EXISTING APT. UNIT 52 FOR INTERIOR ALTERATION WORK TO SPLIT EXISTING APARTMENT UNIT INTO APT. 57 & APT. 58 ON 5th FLOOR LEVEL, REVISE SCHEDULE A AND OBTAIN AMENDED CERTIFICATE OF OCCUPANCY. PL WORK TYPE FILED SEPARATELY.
M00560857-P2
01/02/2024
Filed — Alteration CO
WORK TYPE IS FILED FOR INTERIOR ALTERATION TO CONVERT EXISTING DOCTOR'S APARTMENT WITH OFFICES INTO TWO (2) SEPARATE APT. 1A & 1B AND OBTAIN AMENDED CERTIFICATE OF OCCUPANCY FOR 1ST FLOOR LEVEL ONLY. PL WORK TYPE FILED SEPARATELY
M00566223-P5
01/02/2024
Filed — Alteration CO
WORK TYPE IS FILED ON EXISTING APT. UNIT 72 FOR INTERIOR ALTERATION WORK TO SPLIT EXISTING UNIT INTO APT. 77 & APT 78 ON 7TH FLOOR LEVEL, REVISE SCHEDULE A AND OBTAIN AMENDED CERTIFICATE OF OCCUPANCY. PL WORK TYPE FILED SEPARATELY.
M00561047-P4
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Silver
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Gary Silver
01/02/2024
Special inspection requirement — Lighting in dwelling units
Gary Silver
01/02/2024
Special inspection requirement — Metering
Gary Silver
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Silver
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Gary Silver
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Gary Silver
01/02/2024
Special inspection requirement — Lighting in dwelling units
Gary Silver
01/02/2024
Special inspection requirement — Metering
Gary Silver
01/02/2024
Special inspection requirement — Metering
Gary Silver
01/02/2024
Special inspection requirement — Metering
Gary Silver
01/02/2024
Special inspection requirement — Lighting in dwelling units
Gary Silver
01/02/2024
Special inspection requirement — Lighting in dwelling units
Gary Silver
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Gary Silver
11/08/2023
Violation issued (HPD, closed)
B
11/08/2023
Violation issued (HPD, closed)
A
11/08/2023
Violation issued (HPD, closed)
B
11/08/2023
Violation issued (HPD, closed)
B
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offAZI CONSTRUCTION CORP07/02/2026
DOB NOWGeneral ConstructionSigned-offMNK ENTERPRISES LLC06/30/2026
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC06/10/2026
DOB NOWGeneral ConstructionSigned-offGREY STONE RESTORATION08/17/2022
DOB NOWGeneral ConstructionSigned-offGREY STONE RESTORATION05/03/2022
DOB NOWGeneral ConstructionPermit IssuedPRISHTINA CONSTRUCTION10/20/2021
DOB NOWGeneral ConstructionPermit IssuedPRISHTINA CONSTRUCTION10/20/2021
DOB NOWGeneral ConstructionPermit IssuedPRISHTINA CONSTRUCTION10/06/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC10/05/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC10/05/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC10/05/2021
DOB NOWGeneral ConstructionSigned-offPRISHTINA CONSTRUCTION09/17/2021
DOB NOWGeneral ConstructionSigned-offPRISHTINA CONSTRUCTION09/09/2021
DOB NOWGeneral ConstructionSigned-offPRISHTINA CONSTRUCTION09/09/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/06/2023
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/04/2022
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/17/2021
BISOTISSUEDCADENA CONSTRUCTION INC12/02/2020
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/03/2020
BISOTISSUEDV&L RESTORATION CORP11/27/2019
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/15/2019
BISOTISSUEDV&L RESTORATION CORP10/24/2018
BISOTISSUEDV&L RESTORATION CORP04/24/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/22/2018
BISPLISSUEDHENRY MYERS P & H, INC01/10/2018
BISOTISSUEDLANDMARK RENOVATION GROUP11/20/2017
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/09/2017
BISEQISSUEDVILES CONTRACTING CORP03/21/2012
BISOTISSUEDVILES CONTRACTING CORP09/24/2007
BISOTISSUEDVILES CONTRACTING CORP03/16/2007
BISEQISSUEDJOBIL CONTRACTING CORP03/02/2007
BISOTISSUEDVILES CONTRACTING07/11/2000
BISOTISSUEDVILES CONTRACTING06/27/2000
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/27/1997
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/30/1997
BISOTISSUEDVILES CONTRATING CORP11/13/1996
BISEQISSUEDCOLGATE SCAFFOLDING07/08/1994
8 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedACCURATE ELEC'L CONTR'S CGeneral Wiring
06/10/2026CompleteRICHARD NEU—
04/25/2022CompleteACCURATE ELEC'L CORP.—
02/27/2022CompleteACCURATE ELEC'L CORP.General Wiring
09/24/2020CompleteTAKOS AND K ELECTRIC INCGeneral Wiring
02/20/2019CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
02/20/2019CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
02/11/2018CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 06/10/2026
Sidewalk Shed
FiledStatusContractorScope
06/10/2026Signed-offMNK ENTERPRISES LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/26/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/19/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2021Fail-Final CND-Occupancy InspectionFailView ↗
12/02/2021Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/03/2026Tenant Protection Plan ComplianceNICHOLAS AGNETAspecial
06/03/2026MasonryNICHOLAS AGNETAspecial
06/01/2026FinalNICHOLAS AGNETAprogress
01/02/2024Fire-Resistance Rated ConstructionGary Silverprogress
01/02/2024Lighting in dwelling unitsGary Silverenergy_progress
01/02/2024MeteringGary Silverenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsGary Silverspecial
01/02/2024Fire-Resistant Penetrations and JointsGary Silverspecial
01/02/2024Energy Code Compliance InspectionsGary Silverprogress
01/02/2024Fire-Resistance Rated ConstructionGary Silverprogress
01/02/2024MeteringGary Silverenergy_progress
01/02/2024Lighting in dwelling unitsGary Silverenergy_progress
01/02/2024Lighting in dwelling unitsGary Silverenergy_progress
01/02/2024MeteringGary Silverenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsGary Silverspecial
01/02/2024Energy Code Compliance InspectionsGary Silverprogress
01/02/2024MeteringGary Silverenergy_progress
01/02/2024Fire-Resistance Rated ConstructionGary Silverprogress
01/02/2024Energy Code Compliance InspectionsGary Silverprogress
01/02/2024Fire-Resistant Penetrations and JointsGary Silverspecial
01/02/2024Energy Code Compliance InspectionsGary Silverprogress
01/02/2024Fire-Resistance Rated ConstructionGary Silverprogress
01/02/2024Lighting in dwelling unitsGary Silverenergy_progress
05/23/2023FinalNICHOLAS AGNETAprogress
01/05/2023MeteringGary Silverenergy_progress
Latest 25 of 65.
▾Documents — 327 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch27
09/03/2026M00583890-P1Request digital key ↗
09/03/2026M00583890-I1Request digital key ↗
09/03/2026M00583878-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00397800-I1Request digital key ↗
08/15/2026M00397800-P1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION19
04/28/2022104685413Open ↗
04/27/2022104685413Open ↗
03/05/2022121017112Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION14
03/06/2023140613986Open ↗
03/07/2022140613986Open ↗
03/17/2021140613986Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications109
▸DOB NOWProgress Inspector Seal & Signature46
09/23/2026M01409872-I1Open ↗
09/23/2026M00566223-P4Open ↗
09/23/2026M00566223-P4Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/03/2026M00583890-I1Open ↗
09/03/2026M00583890-P1Open ↗
09/03/2026M00583878-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M00566223-P4Open ↗
09/23/2026M01409872-I1Open ↗
09/23/2026M01409872-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/19/2019140758400Open ↗
06/04/2018123134063Open ↗
08/25/2017123134063Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/19/2018140758400Open ↗
08/25/2017123134063Open ↗
03/07/2017140613986Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/21/2020140951414Open ↗
04/19/2018140758400Open ↗
03/07/2017140613986Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/25/2017123134063Open ↗
04/02/2012121017112Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/19/2018140758400Open ↗
03/07/2017140613986Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/21/2020140951414Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/02/2012121017112Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/15/2018123134063Open ↗
08/25/2017123134063Open ↗
▸Safety & Tenant Protection52
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist28
09/03/2026M00583878-I1Open ↗
09/03/2026M00583878-P1Open ↗
09/03/2026M00566922-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWStreet Tree Checklist12
08/28/2026M00560857-P2Open ↗
08/28/2026M00560857-P1Open ↗
08/13/2026M00561047-P2Open ↗
Showing 3 of 12 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES5
03/10/2022121017112Open ↗
04/19/2018140758400Open ↗
03/07/2017140613986Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
04/19/2018140758400Open ↗
09/05/2017123134063Open ↗
03/07/2017140613986Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00397800-P1Open ↗
08/13/2026M00397800-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/21/2020140951414Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/03/2026M00583890-P1Open ↗
09/03/2026M00583890-I1Open ↗
09/03/2026M00583878-P1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/21/2020140951414Open ↗
09/21/2020140951414Open ↗
04/19/2018140758400Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/19/2019140758400Open ↗
06/04/2018123134063Open ↗
08/25/2017123134063Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026M00560857-I1Open ↗
08/13/2026M00561047-I1Open ↗
08/13/2026M00566223-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/19/2019140758400Open ↗
06/04/2018123134063Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/21/2020140951414Open ↗
04/19/2018140758400Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/07/2017140613986Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/21/2020140951414Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/19/2018140758400Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/28/2022121017112Open ↗
09/21/2020140951414Open ↗
04/19/2018140758400Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
02/28/2022121017112Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
05/16/2023140613986Open ↗
05/10/2022104685413Open ↗
03/21/2022121017112Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/06/2023140613986Open ↗
03/07/2022140613986Open ↗
03/17/2021140613986Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
03/06/2023140613986Open ↗
03/07/2022140613986Open ↗
03/17/2021140613986Open ↗
▸BISFINAL2
05/15/2023140613986Open ↗
02/28/2022121017112Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/02/2020140951414Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/02/2012121017112Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/19/2019140758400Open ↗
06/04/2018123134063Open ↗
04/19/2018140758400Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/21/2020140951414Open ↗
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM9
03/06/2023140613986Open ↗
03/07/2022140613986Open ↗
03/17/2021140613986Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
10/02/2020140951414Open ↗
07/29/2020140758400Open ↗
11/21/2019140758400Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/21/2020140951414Open ↗
04/19/2018140758400Open ↗
03/07/2017140613986Open ↗
▸BISEFILING COVER SHEET2
08/25/2017123134063Open ↗
04/02/2012121017112Open ↗
▸Other Documents8
▸BISDHCR DOCUMENT3
05/02/2022104685413Open ↗
01/19/2022101849546Open ↗
07/18/2019140758400Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/07/2022140613986Open ↗
03/07/2022140613986Open ↗
▸BISPLOT DIAGRAM1
09/21/2020140951414Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01413227-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01413227-I1Open ↗