← Back
BuildNYC
Over six families without stores
251 MOTHER GASTON BOULEVARD
BROOKLYN · Brownsville · BIN 3083403
💬 Discuss this project
1921Year Built
4Stories
C1Building Class
R7AZoning
8,800 sfGross Floor Area
10Units
Rent Stabilized256 Active Violations 252 unresolved · 4 paperwork only 2 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Mhany Mother Gaston Housing Development Fund · 2,500 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVestibule renovationUnder Construction91p · 1 filing · 20 docs
BulkheadVestibule renovationUnder Construction4p · 1 filing · 20 docs
Floor 4Vestibule renovationUnder Construction84p · 1 filing · 20 docs
Floor 3Vestibule renovationUnder Construction85p · 1 filing · 20 docs
Floor 2Vestibule renovationUnder Construction84p · 1 filing · 20 docs
Floor 1Vestibule renovationUnder Construction88p · 1 filing · 20 docs
CellarVestibule renovationUnder Construction87p · 1 filing · 20 docs
Site & exteriorMHANY MOTHER GASTON SITES fence and light poleUnder Construction2p · 2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development403/21/2026
Mhany Mother Gaston Housing Development Fund203/21/2026
City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering108/20/2026
Rosenthal603/05/2026
CTC103/04/2026
Shakespeare, Gordon, Vlado Architects201/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Galaxy G.C. GroupGeneral Contractor508/30/2026
Galaxy G.C. GroupScaffold208/27/2026
Vema GroupScaffold108/21/2026
AJC Plumbing & HeatingPlumbing107/08/2026
AJC SprinklerFire Protection106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665108/17/2026
Metric Consulting and Ins1803803/05/2026
Building Lifecycle
All (174)Filed (11)Permit Issued (10)Violation (60)Inspection (5)Objection (58)Special Inspection (30)
09/01/2026
Permit issued — Suspended Scaffold
B01446867-I1-SC
09/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2026
Objection raised — Other
09/01/2026
Objection resolved — Addressed
08/28/2026
Permit issued — Mechanical Systems
B00819890-S2-MS
08/27/2026
Permit issued — General Construction
B00819890-I1-GC
08/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/26/2026
Permit issued — Construction Fence
B01366790-I1-FN
08/20/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01428866-I1
08/20/2026
Permit issued — Sidewalk Shed
B01428866-I1-SH
08/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
B01446867-I1
08/17/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/17/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
07/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/07/2026
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Permit issued — Sprinklers
B00819890-S3-EW-SP
05/06/2026
Violation issued (HPD, open)
A
04/14/2026
Permit issued — Plumbing
B00819890-S1-PL
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/16/2026
Objection raised — Cost
03/16/2026
Objection raised — Cost
03/11/2026
Permit issued — Construction Fence
B01366790-I1-FN
03/11/2026
Permit issued — General Construction
B00819890-I1-GC
03/05/2026
Filed — Alteration
Repair of building infrastructure and reconfiguration of apartment of 4 story multiple dwelling. No change in use, occupancy, or egress.
B00819890-P3
03/05/2026
Filed — Alteration
Repair of building infrastructure and reconfiguration of apartment of 4 story multiple dwelling. No change in use, occupancy, or egress.
B00819890-P2
03/04/2026
Filed — Alteration
B01366790-I1
02/20/2026
Permit issued — General Construction
B00819890-I1-GC
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Chimneys and vents
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
02/13/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Metering
SAMI HAJJAR P.E
02/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
01/16/2026
Filed — Alteration
Repair of building infrastructure and reconfiguration of apartment of 4 story multiple dwelling. No change in use, occupancy, or egress.
B00819890-P1
11/19/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, closed)
A
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedVema Group09/01/2026
DOB NOWMechanical SystemsPermit IssuedGalaxy G.C. Group08/28/2026
DOB NOWGeneral ConstructionPermit IssuedGalaxy G.C. Group08/27/2026
DOB NOWConstruction FencePermit IssuedGalaxy G.C. Group08/26/2026
DOB NOWSidewalk ShedPermit IssuedVema Group08/20/2026
DOB NOWSprinklersPermit IssuedAJC Sprinkler05/26/2026
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating04/14/2026
DOB NOWConstruction FencePermit IssuedGalaxy G.C. Group03/11/2026
DOB NOWGeneral ConstructionPermit IssuedGalaxy G.C. Group03/11/2026
DOB NOWGeneral ConstructionPermit IssuedGalaxy G.C. Group02/20/2026
BISPLISSUEDVenture Plumbing & Heating04/05/1993
BISEQISSUEDEmd Construction01/06/1993
BIS—ISSUEDEmd Construction01/06/1993
BISPLISSUEDStivan Plumbing & Heating01/29/1992
BISEQISSUEDEmd Construction01/02/1992
BISEQISSUEDEmd Construction12/30/1991
BIS—ISSUEDEmd Construction12/30/1991
1 project · most recent 03/05/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026Permit IssuedGalaxy G.C. GroupHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Ephoca APP10N3H1 5,780 BTU · Heat Pump Outdoor ×72
Heating
Stelpro ARWF1001T 1,275 BTU · Electric Heater ×44
AWFA1502T 5,120 BTU · Electric Heater ×22
ARWFA2008T 6,820 BTU · Electric Heater ×6
1 project · most recent 03/05/2026
Sprinkler System
FiledStatusContractorScope
03/05/2026Permit IssuedAJC SprinklerSprinkler System
1 project · most recent 03/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit IssuedAJC Plumbing & HeatingGas, Storm, Water/Sanitary
4 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026Permit IssuedHigh Quality Electric of NYC—
07/23/2026Permit IssuedHigh Quality Electric of NYC—
06/29/2026Permit IssuedBulk ElectricGeneral Wiring
02/14/2018Permit IssuedWHYNN Electric20 meters, 1 new_meters
1 project · most recent 08/20/2026
Sidewalk Shed
FiledStatusContractorScope
08/20/2026Permit IssuedVema GroupSidewalk Shed
1 project · most recent 08/17/2026
Suspended Scaffold
FiledStatusContractorScope
08/17/2026Permit IssuedVema GroupSuspended Scaffold
1 project · most recent 08/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/17/2026Permit IssuedVema GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/07/2026Pass-Final SD - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/17/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/17/2026Post-installed AnchorsKarol Zdancewiczspecial
03/26/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/26/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/13/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/13/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/13/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/13/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/13/2026Chimneys and ventsSAMI HAJJAR P.Especial
02/13/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/13/2026Mechanical SystemsSAMI HAJJAR P.Especial
02/13/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/13/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/13/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/13/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
02/13/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/13/2026FinalSAMI HAJJAR P.Eprogress
02/13/2026Heating SystemsSAMI HAJJAR P.Especial
02/02/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
02/02/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/02/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/02/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
02/02/2026FinalSAMI HAJJAR P.Eprogress
02/02/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
Latest 25 of 42.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01428866-I1Request digital key ↗
08/18/2026B01446867-I1Request digital key ↗
08/18/2026B00819890-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026B01428866-I1Open ↗
08/18/2026B00819890-S2Open ↗
08/18/2026B00819890-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00819890-S1Open ↗
09/02/2026B00819890-S1Open ↗
08/27/2026B00819890-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B01446867-I1Open ↗
09/02/2026B01446867-I1Open ↗
09/02/2026B00819890-S1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/18/2026B00819890-S2Open ↗
08/18/2026B00819890-S1Open ↗
08/18/2026B00819890-I1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/21/2026B01428866-I1Open ↗
08/13/2026B00819890-S4Open ↗
08/13/2026B00819890-P3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents9
▸DOB NOWDHCR Document5
08/13/2026B00819890-P2Open ↗
08/13/2026B00819890-S3Open ↗
08/13/2026B00819890-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00819890-P1Open ↗
08/13/2026B00819890-I1Open ↗
▸DOB NOWCalculations1
08/18/2026B01446867-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/18/2026B01446867-I1Open ↗