← Back
Three families
251 WEIRFIELD STREET
BROOKLYN · Bushwick (East) · BIN 3078375
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R6Zoning
2,850 sfGross Floor Area
3Units
3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: SHIRAISHI LLC · 1,900 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Floor 214p · 2 filings · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
Sub-Basement12p · 2 filings · 20 docs
Site & exterior8p · 1 filing · 20 docs
Filed — no permit issued10p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USA DEVELOPMENT LLC1703/22/2026
SHIRAISHI LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2023$2.1M—FULTON PARTNERS NY LLC → SHIRAISHI LLC$737/sf building
03/09/2023$950K—— → —$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MASTROGIACOMO ENGINEERING PC408/25/2023
RAUL CABATO, ARCHITECT210/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WINNING EXPEDITING SERVICE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor903/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MASTROGIACOMO ENGINEERING4237408/25/2023
Building Lifecycle
All (59)Filed (6)Permit Issued (4)Signed Off (2)Violation (4)Inspection (7)Objection (6)Special Inspection (30)
05/20/2026
Violation issued (HPD, open)
I
05/11/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2026
Violation issued (HPD, open)
C
05/08/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2023
Signed off — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, CAP UNUSED PIPING, INSTALL NEW PLUMBING FIXTURES AS PER PLAN WITH ASSOCIATED PIPING. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# B00829478, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00834532-I1
09/08/2023
Signed off — Alteration
RENOVATION WORK TO EXISTING 2-FAMILY HOUSE AS INDICATED ON THE PLANS, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00829478-I1
09/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Maintenance information
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Structural Steel - Details
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Heating Systems
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Final
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Maintenance information
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fenestration air leakage
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Metering
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Air barrier - visual inspection
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Fenestration areas
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL MASTROGIACOMO
08/26/2023
Special inspection requirement — Interior lighting power
MICHAEL MASTROGIACOMO
08/25/2023
Filed — Alteration
RENOVATION WORK TO EXISTING 2-FAMILY HOUSE AS INDICATED ON THE PLANS, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00829478-P2
08/25/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, CAP UNUSED PIPING, INSTALL NEW PLUMBING FIXTURES AS PER PLAN WITH ASSOCIATED PIPING. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# B00829478, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00834532-P1
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL MASTROGIACOMO
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
08/25/2023
Special inspection requirement — Heating Systems
MICHAEL MASTROGIACOMO
08/25/2023
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
08/25/2023
Special inspection requirement — Structural Steel - Details
MICHAEL MASTROGIACOMO
06/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/23/2023
Permit issued — Plumbing
B00834532-I1-PL
03/22/2023
Permit issued — Mechanical Systems
B00829478-I1-MS
03/22/2023
Permit issued — General Construction
B00829478-I1-GC
03/22/2023
Permit issued — Mechanical Systems
B00829478-I1-ST
03/17/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, CAP UNUSED PIPING, INSTALL NEW PLUMBING FIXTURES AS PER PLAN WITH ASSOCIATED PIPING. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# B00829478, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00834532-I1
03/17/2023
Filed — Alteration
RENOVATION WORK TO EXISTING 2-FAMILY HOUSE AS INDICATED ON THE PLANS, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00829478-I1
03/03/2022
Objection raised — Scope
03/03/2022
Objection resolved — Addressed
03/03/2022
Objection raised — Scope
03/03/2022
Objection resolved — Addressed
10/14/2021
Objection raised — Other
10/14/2021
Objection resolved — Addressed
10/13/2021
Filed — Alteration
Filing for plumbing work in conjunction with job # B00567512-I1.
B00567516-I1
09/28/2021
Filed — Alteration
B00567512-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT03/23/2023
DOB NOWMechanical SystemsSigned-offPRIMROSE SERVICE INC03/22/2023
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC03/22/2023
DOB NOWMechanical SystemsSigned-offPRIMROSE SERVICE INC03/22/2023
1 project · most recent 10/13/2021
Water/Sanitary
FiledStatusContractorScope
10/13/2021——Water/Sanitary
1 project · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023CompleteK.A.B. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/26/2023HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
08/26/2023Energy Code Compliance InspectionsMICHAEL MASTROGIACOMOprogress
08/26/2023HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
08/26/2023HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
08/26/2023HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Maintenance informationMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Structural Steel - DetailsMICHAEL MASTROGIACOMOspecial
08/26/2023Heating SystemsMICHAEL MASTROGIACOMOspecial
08/26/2023Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
08/26/2023Mechanical SystemsMICHAEL MASTROGIACOMOspecial
08/26/2023Concrete - Cast-In-PlaceMICHAEL MASTROGIACOMOspecial
08/26/2023Structural Steel - High Strength BoltingMICHAEL MASTROGIACOMOspecial
08/26/2023Fire-Resistance Rated ConstructionMICHAEL MASTROGIACOMOprogress
08/26/2023FinalMICHAEL MASTROGIACOMOprogress
08/26/2023Energy Code Compliance InspectionsMICHAEL MASTROGIACOMOprogress
08/26/2023Maintenance informationMICHAEL MASTROGIACOMOenergy_progress
08/26/2023HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Fenestration air leakageMICHAEL MASTROGIACOMOenergy_progress
08/26/2023MeteringMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Air barrier - visual inspectionMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Fenestration and door U-factor and product ratingsMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Fenestration areasMICHAEL MASTROGIACOMOenergy_progress
08/26/2023HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
08/26/2023Interior lighting powerMICHAEL MASTROGIACOMOenergy_progress
Latest 25 of 50.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00567512-I1Request digital key ↗
09/01/2026B00567516-I1Request digital key ↗
08/27/2026B00834532-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature36
09/27/2026B00829478-P2Open ↗
09/27/2026B00829478-P2Open ↗
09/27/2026B00829478-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/27/2026B00829478-P2Open ↗
09/27/2026B00829478-P2Open ↗
09/27/2026B00829478-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00567512-I1Open ↗
09/01/2026B00567516-I1Open ↗
08/27/2026B00834532-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00567512-I1Open ↗
09/01/2026B00567516-I1Open ↗
08/27/2026B00834532-I1Open ↗
Showing 3 of 6 on file for this type