← Back
Office with commercial, 7-19 stories
251 WEST 30 STREET
MANHATTAN · BIN 1014338
💬 Discuss this project
1927Year Built
16Stories
O6Building Class
M1-5Zoning
104,199 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized
Office with commercial, 7-19 stories · Owner of record: 251 WEST 30TH OWNER LLC · 7,406 sf lot · 14.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof16p · 6 filings · 20 docs
Floor 161 filing · 7 docs
Floor 151 filing · 7 docs
Floor 14
Floor 13
Floor 1214p · 3 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 731p · 2 filings · 20 docs
Floor 6
Floor 5
Floor 445p · 2 filings · 13 docs
Floor 3
Floor 247p · 2 filings · 16 docs
Floor 1Under Construction7p · 2 filings · 20 docs
MezzanineUnder Construction4p · 1 filing · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RESOLUTION REAL ESTATE5109/13/2026
RESOLUTION REAL ESTATE GROUP1407/08/2026
HSP REAL ESTATE GROUP1207/08/2026
NYC GUITAR SCHOOL503/22/2026
VIK XS SERVICES INC503/22/2026
DISH WIRELESS303/22/2026
251 WEST 30TH OWNER8803/22/2026
JUSTION TOWER LTD4603/22/2026
CEPHEUS CONSTRUCTION203/22/2026
SCB ENTERTAIN,EMT LLC D/B103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING1203/21/2026
YAO W GUO ARCHITECT, PC2803/21/2026
BURNHAM NATIONWIDE INC1003/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
AE DESIGN SOLUTION203/21/2026
AO CONSULTING AND DRAFTING203/21/2026
SUPERIOR FIRE CONTROL103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369605/21/2026
PCS ENGINEERING3745104/30/2026
WORLD DESIGN ARCHITECTURE9323211/09/2025
BITOPI CONSULTANTS LLC7036108/07/2025
CMSC, INC6098204/09/2025
SAG ENGINEERING & CONSULT608704/24/2024
GC ENG & ASSOCIATES PC17961410/03/2023
NEW YORK ENGINEERING ASSO851109/14/2023
KMB DESIGN GROUP, LLC513104/10/2023
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
04/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
08/19/2026FinalLEON SKVIRSKYprogress
05/12/2026Post-installed AnchorsLuis Pichardospecial
05/12/2026HVAC-R and service water heating system controlsLuis Pichardoenergy_progress
05/12/2026Energy Code Compliance InspectionsLuis Pichardoprogress
05/12/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
05/12/2026HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
05/12/2026Maintenance informationLuis Pichardoenergy_progress
05/12/2026Shutoff dampersLuis Pichardoenergy_progress
05/12/2026Duct leakage testing, insulation and designLuis Pichardoenergy_progress
05/12/2026HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
05/09/2026Post-installed AnchorsLuis Pichardospecial
05/04/2026Tenant Protection Plan ComplianceLuis Pichardospecial
05/04/2026Tenant Protection Plan ComplianceLuis Pichardospecial
04/28/2026Mechanical SystemsLuis Pichardospecial
04/28/2026FinalJuan Ramosprogress
04/28/2026Sprinkler SystemsLuis Pichardospecial
04/21/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/21/2026Post-installed AnchorsMichael Walshspecial
04/01/2026Structural Steel - DetailsLuis Pichardospecial
04/01/2026FinalJuan Ramosprogress
04/01/2026Public Assembly Emergency LightingJEFFREY BELLprogress
04/01/2026Tenant Protection Plan ComplianceLuis Pichardospecial
04/01/2026Structural Stability – Alterations of existing buildingsLuis Pichardospecial
02/17/2026Tenant Protection Plan Compliance—special
01/22/2026Tenant Protection Plan Compliance—special
Latest 25 of 99.
Nothing on file for this building.