Office with commercial, 7-19 stories
251 WEST 30TH STREET
MANHATTAN · BIN 1014338
💬 Discuss this project
1927Year Built
16Stories
O6Building Class
M1-5Zoning
104,199 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized8 Active Violations 5 unresolved · 3 paperwork only 5 likely answered 2 old, status unconfirmed ▸FISP: UNSAFE
Office with commercial, 7-19 stories · Owner of record: 251 West 30th Owner · 7,406 sf lot · 14.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBazza, NYC Guitar School17p · 8 filings · 18 docs
Floor 16Herald Square Properties2 filings · 11 docs
Floor 15Herald Square Properties2 filings · 11 docs
Floor 14
Floor 13
Floor 12Resolution Real Estate14p · 3 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Resolution, NYC Guitar School32p · 2 filings · 20 docs
Floor 6
Floor 5
Floor 4Resolution Real Estate Partners46p · 2 filings · 13 docs
Floor 3
Floor 2Resolution Real Estate47p · 2 filings · 16 docs
Floor 1BazzaUnder Construction36p · 3 filings · 20 docs
MezzanineResolution Real EstateUnder Construction7p · 2 filings · 20 docs
CellarResolution Real EstateUnder Construction28p · 2 filings · 20 docs
Site & exteriorBazzaUnder Construction36p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
251 West 30th Owner8203/22/2026
Resolution Real Estate6810/04/2026
Justin Towers1903/21/2026
HSP Real Estate Group1207/08/2026
Herald Sqaure Properties803/22/2026
HSP703/21/2026
NYC Guitar School503/22/2026
JR Building Associates103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2016$50.5M—RG ASSOCIATES RE LLC → 251 WEST 30TH OWNER LLC$484/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE108/19/2026
Twigcon205/21/2026
West Hudson Engineering104/08/2026
JBA704/07/2026
Bitopi Consultants108/07/2025
Construction Management & Safety Con204/09/2025
Diaz Architects Inc., PA304/24/2024
Dipcd104/24/2024
Ospino Engineering101/25/2024
GC Engineering & Associates1410/03/2023
New York & Company109/14/2023
Gaviria Engineering104/10/2023
Enthink Engineers108/24/2022
MSP Engineering103/21/2022
Green Design108/11/2020
Paul Perdek, Prof. Engineering101/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC Expediting1203/21/2026
GC Engineering & Associates2803/21/2026
Burnham Nationwide1003/21/2026
New York & Company203/21/2026
AE Design Solution203/21/2026
AO Consulting and Drafting203/21/2026
Superior Fire Control103/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Archstone BuildersGeneral Contractor2207/08/2026
Andamio ScaffoldingScaffold807/08/2026
Everest ScaffoldingScaffold603/21/2026
Vik XS ServicesGeneral Contractor507/08/2026
Cepheus ConstructionGeneral Contractor507/08/2026
Remi InteriorsGeneral Contractor303/21/2026
AMC Exhaust SystemGeneral Contractor303/21/2026
Cube Builders Group NYGeneral Contractor303/21/2026
Lara ConstructionGeneral Contractor303/21/2026
Mill Brook Fire ProtectionFire Protection307/08/2026
Nova Interiors Cons & ConGeneral Contractor303/21/2026
Sato Construction CoGeneral Contractor307/08/2026
Shaw MechanicalPlumbing207/08/2026
Ket ElectricElectrical203/21/2026
Ket ElectricElectrical203/22/2026
Odyssia Global CommercialGeneral Contractor203/21/2026
KC ExpeditingGeneral Contractor210/02/2026
G&B Plumbing & HeatingPlumbing207/08/2026
William C. Gerakaris P&HPlumbing107/08/2026
A.S.K. ElectricalElectrical103/22/2026
Woodside ElectricElectrical103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Nunez ElectricElectrical103/21/2026
L.E.A. ElectricElectrical103/22/2026
Nee ElectricalElectrical103/22/2026
Ace-Atlas Plumbing & HeatingScaffold103/21/2026
Vessio JosephScaffold103/21/2026
L.S. Sign CoSign hanger110/03/2026
Aqueduct MechanicalFire Protection107/08/2026
Ashlar MechanicalFire Protection107/08/2026
Crossfield Plumbing & HeatingFire Protection107/11/2026
DNA Plumbing ContractorsPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Ask Electl ContrtngElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369605/21/2026
PCS Engineering3745104/30/2026
World Design Architecture9323211/09/2025
Bitopi Consultants7036108/07/2025
CMSC6098204/09/2025
Sag Engineering & Consulting608704/24/2024
GC Engineering & Associates17961410/03/2023
New York Engineering Associates851109/14/2023
KMB Design Group513104/10/2023
Building Lifecycle
All (246)Filed (40)Permit Issued (52)Signed Off (11)Facade (FISP) (21)Violation (60)Inspection (13)Objection (19)Special Inspection (30)
10/20/2026
Signed off — Alteration
Filing to install Take out Restaurant kitchen hood and ductwork as per plans. No change in use, egress, or occupancy.
M01265814-I1
10/16/2026
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - BAZZA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01435395-I1
10/02/2026
Permit issued — Sign
M01435395-I1-SG
10/01/2026
Permit issued — Mechanical Systems
M01235880-S4-MS
10/01/2026
Permit issued — Structural
M01235880-S3-ST
08/19/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - BAZZA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01435395-I1
08/19/2026
Special inspection requirement — Final
LEON SKVIRSKY
07/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/10/2026
Permit issued — Sprinklers
M01235880-S5-EW-SP
06/22/2026
Objection resolved — Resolved
06/22/2026
Objection resolved — Resolved
06/09/2026
Objection raised — Cost
06/09/2026
Objection raised — Energy
05/21/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-S4
05/15/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-S5
05/12/2026
Permit issued — Suspended Scaffold
M01390507-I1-SC
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
05/12/2026
Special inspection requirement — Maintenance information
Luis Pichardo
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
05/12/2026
Special inspection requirement — Shutoff dampers
Luis Pichardo
05/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
Luis Pichardo
05/12/2026
Special inspection requirement — Post-installed Anchors
Luis Pichardo
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Luis Pichardo
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
05/09/2026
Special inspection requirement — Post-installed Anchors
Luis Pichardo
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/30/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01390507-I1
04/29/2026
Violation issued (HPD, open)
A
04/28/2026
Special inspection requirement — Final
Juan Ramos
04/28/2026
Special inspection requirement — Sprinkler Systems
Luis Pichardo
04/28/2026
Special inspection requirement — Mechanical Systems
Luis Pichardo
04/21/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
04/21/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/20/2026
Violation issued (ECB, open)
Local Law
04/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/17/2026
Objection raised — Cost
04/17/2026
Objection resolved — Addressed
04/15/2026
Objection raised — Scope
04/08/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-S3
04/07/2026
Filed — No Work
M01381351-I1
04/01/2026
Special inspection requirement — Public Assembly Emergency Lighting
JEFFREY BELL
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
04/01/2026
Special inspection requirement — Structural Steel - Details
Luis Pichardo
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/01/2026
Special inspection requirement — Final
Juan Ramos
02/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/29/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-P3
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2025
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-P2
11/09/2025
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
M01235880-P1
11/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedL.S. Sign Co10/02/2026
DOB NOWMechanical SystemsPermit IssuedKC Expediting10/01/2026
DOB NOWStructuralPermit IssuedKC Expediting10/01/2026
DOB NOWSprinklersPermit IssuedCrossfield Plumbing & Heating07/10/2026
DOB NOWSuspended ScaffoldPermit IssuedColgate Restoration05/12/2026
DOB NOWMechanical SystemsSigned-offAMC Exhaust System08/22/2025
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing08/04/2025
DOB NOWGeneral ConstructionPermit IssuedLara Construction07/07/2025
DOB NOWPlumbingPermit IssuedJames Cruz05/14/2025
DOB NOWGeneral ConstructionSigned-offRemi Interiors02/27/2025
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY01/16/2025
DOB NOWBoiler EquipmentSigned-offAce-Atlas Plumbing & Heating01/09/2025
DOB NOWGeneral ConstructionSigned-offSato Construction Co12/17/2024
DOB NOWStructuralSigned-offSato Construction Co12/17/2024
DOB NOWStructuralPermit IssuedCepheus Construction04/29/2024
DOB NOWGeneral ConstructionSigned-offVik XS Services04/23/2024
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services01/26/2024
DOB NOWMechanical SystemsPermit IssuedArchstone Builders12/28/2023
DOB NOWMechanical SystemsPermit IssuedArchstone Builders12/27/2023
DOB NOWMechanical SystemsPermit IssuedArchstone Builders12/27/2023
DOB NOWMechanical SystemsPermit IssuedArchstone Builders12/27/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders12/27/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders12/27/2023
DOB NOWPlumbingPermit IssuedDNA Plumbing Contractors10/24/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders10/16/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders10/16/2023
DOB NOWSprinklersPermit IssuedLeguci Piping & Heating10/13/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/29/2023
DOB NOWPlumbingSigned-offJames Cruz07/21/2023
DOB NOWSprinklersPermit IssuedLeguci Piping & Heating07/20/2023
DOB NOWSprinklersPermit IssuedLeguci Piping & Heating07/20/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders07/19/2023
DOB NOWMechanical SystemsPermit IssuedArchstone Builders07/19/2023
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders07/19/2023
DOB NOWGeneral ConstructionSigned-offCepheus Construction07/19/2023
DOB NOWMechanical SystemsPermit IssuedArchstone Builders07/19/2023
DOB NOWAntennaSigned-offOdyssia Global Commercial06/08/2023
DOB NOWStructuralPermit IssuedCepheus Construction05/01/2023
DOB NOWStructuralPermit IssuedVik XS Services10/27/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/06/2022
+ 60 more permits on file
3 projects · most recent 05/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2026Permit IssuedKC ExpeditingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXAQ18PVJU 1,520 CFM · Vrf Indoor ×3
FXMQ54TBVJU 640 CFM · Vrf Indoor ×2
FXMQ18TBVJU 1,520 CFM · Vrf Indoor ×1
FXMQ36TBVJU 500 CFM · Vrf Indoor ×1
FXMQ48TBVJU 500 CFM · Vrf Indoor ×1
FXSQ09TBVJU 320 CFM · Vrf Indoor ×1
Ventilation
Renewaire HE-3XINV 2,280 CFM · Erv ×1
08/07/2025Signed-offAMC Exhaust SystemVentilation Systems
Ventilation
Grainger 391NH8 12,000 CFM · Kitchen Exhaust ×1
08/06/2023Permit IssuedArchstone BuildersHeating and Air Conditioning Systems
Heat / Cool
Daikin RXYQ192ATJA 192,000 BTU · Vrf Outdoor ×1
6 projects · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026Permit IssuedCrossfield Plumbing & Heating—
10/03/2023Permit IssuedLeguci Piping & Heating55 heads
08/06/2023Permit IssuedLeguci Piping & Heating82 heads
08/06/2023Permit IssuedLeguci Piping & Heating—
06/10/2020Permit IssuedAshlar Mechanical77 heads
11/08/2019Permit IssuedAqueduct Mechanical30 heads
6 projects · most recent 05/21/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/21/2026Permit IssuedInfiniti Esc PlumbingGas, Water/Sanitary
10/03/2023Permit IssuedShaw MechanicalWater/Sanitary
08/06/2023——Water/Sanitary
08/06/2023Signed-offShaw MechanicalWater/Sanitary
06/10/2020Signed-offWilliam C. Gerakaris P&HWater/Sanitary
11/08/2019Signed-offG&B Plumbing & HeatingWater/Sanitary
19 projects · most recent 03/16/2026
General Wiring Lighting
FiledStatusContractorScope
03/16/2026Permit IssuedKet ElectricGeneral Wiring
09/29/2025CompleteKet ElectricGeneral Wiring
07/30/2025Permit IssuedJN ElectricalGeneral Wiring, Lighting
08/14/2023Permit IssuedCrosswire ElectricalGeneral Wiring
06/14/2023Permit IssuedAssociated Electric Cont of NGeneral Wiring
09/09/2020Permit IssuedAll State Electric CnstctGeneral Wiring
08/05/2020Permit IssuedMRD Electrical ServicesGeneral Wiring
07/27/2020CompleteEvs ElectricGeneral Wiring
01/16/2020CompleteBorowide Elect'l Contractors—
05/12/2019Permit IssuedAmor ElectricGeneral Wiring
04/15/2019CompleteElpo Electrical ContgGeneral Wiring
03/25/2019Permit IssuedMRD Electrical ServicesGeneral Wiring
10/03/2018Permit IssuedE & M Electrical NYGeneral Wiring
08/16/2018CompleteL.E.A. ElectricGeneral Wiring
05/15/2018CompleteAsk Electl ContrtngGeneral Wiring, Lighting
2 projects · most recent 05/21/2026
Steel
FiledStatusContractorScope
05/21/2026Permit IssuedKC ExpeditingSteel
03/21/2022Permit IssuedCepheus ConstructionSteel
1 project · most recent 04/30/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/30/2026Permit IssuedColgate RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
08/19/2026FinalLEON SKVIRSKYprogress
05/12/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
05/12/2026Post-installed AnchorsLuis Pichardospecial
05/12/2026HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
05/12/2026Energy Code Compliance InspectionsLuis Pichardoprogress
05/12/2026HVAC-R and service water heating system controlsLuis Pichardoenergy_progress
05/12/2026HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
05/12/2026Duct leakage testing, insulation and designLuis Pichardoenergy_progress
05/12/2026Shutoff dampersLuis Pichardoenergy_progress
05/12/2026Maintenance informationLuis Pichardoenergy_progress
05/09/2026Post-installed AnchorsLuis Pichardospecial
05/04/2026Tenant Protection Plan ComplianceLuis Pichardospecial
05/04/2026Tenant Protection Plan ComplianceLuis Pichardospecial
04/28/2026Mechanical SystemsLuis Pichardospecial
04/28/2026FinalJuan Ramosprogress
04/28/2026Sprinkler SystemsLuis Pichardospecial
04/21/2026Post-installed AnchorsMichael Walshspecial
04/21/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/01/2026Structural Steel - DetailsLuis Pichardospecial
04/01/2026Public Assembly Emergency LightingJEFFREY BELLprogress
04/01/2026Structural Stability – Alterations of existing buildingsLuis Pichardospecial
04/01/2026Tenant Protection Plan ComplianceLuis Pichardospecial
04/01/2026FinalJuan Ramosprogress
02/17/2026Tenant Protection Plan Compliance—special
01/22/2026Tenant Protection Plan Compliance—special
Latest 25 of 99.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BazzaRestaurant / Food ServiceFloor 1, Roof
Project M01435395 Alteration · LOC Issued · 08/19/2026
Project M01265814 Alteration · LOC Issued · 08/07/2025
NYC Guitar SchoolEducationFloor 7, Roof
Project M01147553 Alteration · LOC Issued · 11/27/2024
ResolutionOfficeFloor 7
Project M00933823 Alteration · Permit Entire · 10/03/2023
Herald Square PropertiesOfficeFloors 15, 16
Project M00218766 Alteration · Approved · 11/08/2019
Project M00218784 Alteration · Permit Entire · 11/08/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 811 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch35
09/02/2026M00554835-I1Request digital key ↗
09/02/2026M00554835-P1Request digital key ↗
09/02/2026M00615691-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00218766-I1Request digital key ↗
08/15/2026M00343116-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00218784-I1Request digital key ↗
09/04/2026M00343137-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00218784-I1Request digital key ↗
09/04/2026M00343137-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00383325-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00298246-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/18/2026M01381351-I1Request digital key ↗
▸Applications & Permits166
▸BISPLAN / WORK APPROVAL APPLICATION98
07/19/2023122994910Open ↗
07/21/2022123828484Open ↗
11/25/2020122955025Open ↗
Showing 3 of 98 on file for this type
▸BISWORK PERMIT APPLICATION68
06/15/2020140910058Open ↗
01/22/2020123712107Open ↗
10/10/2019123712107Open ↗
Showing 3 of 68 on file for this type
▸Seals & Professional Certifications263
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
10/13/2021123715033Open ↗
10/13/2021123715033Open ↗
09/18/2019123712107Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/25/2026M00933823-S1Open ↗
09/23/2026M01265814-I1Open ↗
09/23/2026M01265814-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/05/2026M00218766-I1Open ↗
09/04/2026M00343116-I1Open ↗
09/02/2026M00554835-P1Open ↗
Showing 3 of 41 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT36
06/09/2020140910058Open ↗
09/18/2019123712107Open ↗
04/05/2019140841551Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026M01265814-I1Open ↗
09/02/2026M01147553-P1Open ↗
09/02/2026M01147553-P1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
11/17/2020122955025Open ↗
09/18/2019123712107Open ↗
03/14/2019123680034Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/09/2020140910058Open ↗
04/05/2019140841551Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/09/2020140910058Open ↗
04/05/2019140841551Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
03/14/2019123680034Open ↗
03/14/2019123717120Open ↗
03/11/2019123715033Open ↗
Showing 3 of 23 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/13/2020123717120Open ↗
▸BISSCHEDULE B - PLUMBING1
04/05/2019140841551Open ↗
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes11
09/18/2019123712107Open ↗
09/28/2018123400300Open ↗
06/09/2020140910058Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan6
08/13/2026M00218766-I1Open ↗
08/13/2026M00218784-I1Open ↗
08/13/2026M00383325-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos65
▸BISASBESTOS: CERTIFICATION (DEP ACP5)38
06/09/2020140910058Open ↗
09/18/2019123712107Open ↗
04/05/2019140841551Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/05/2026M00218766-I1Open ↗
09/04/2026M00343116-I1Open ↗
08/29/2026M00873311-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/02/2026M00554835-I1Open ↗
09/02/2026M00615691-I1Open ↗
08/13/2026M00933823-S1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance49
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
02/10/2020123717120Open ↗
09/18/2019123712107Open ↗
09/18/2019123712107Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
10/08/2020123356741Open ↗
10/08/2020121241833Open ↗
10/08/2020122994929Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/08/2020121241833Open ↗
06/09/2020140910058Open ↗
04/17/2019140841551Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/09/2020140910058Open ↗
04/05/2019140841551Open ↗
▸BISINTERIOR LIGHTING POWER1
08/13/2020123717120Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/13/2020123717120Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY14
10/08/2020123356741Open ↗
10/08/2020121241833Open ↗
10/08/2020121241833Open ↗
Showing 3 of 14 on file for this type
▸BISMECHANICAL SYSTEMS1
08/13/2020123717120Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/13/2020123717120Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
10/08/2020123356741Open ↗
10/08/2020121241833Open ↗
10/08/2020122994929Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
10/07/2020123107084Open ↗
09/29/2020123107084Open ↗
Showing 2 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/03/2018123107084Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
08/13/2020123717120Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership60
▸BISCOST AFFIDAVIT59
10/08/2020123356741Open ↗
10/08/2020121241833Open ↗
10/08/2020122994929Open ↗
Showing 3 of 59 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/13/2020123717120Open ↗
▸Filing & Intake Forms68
▸BISEFILING COVER SHEET41
09/18/2019123712107Open ↗
03/14/2019123680034Open ↗
03/14/2019123676129Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM17
02/10/2020123712107Open ↗
02/04/2019123547162Open ↗
09/27/2018123364938Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION8
02/08/2019123547162Open ↗
Showing 1 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/09/2020140910058Open ↗
04/05/2019140841551Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/17/2026M01390507-I1Open ↗
08/13/2026M00081951-S1Open ↗
▸DOB NOWCalculations2
08/17/2026M01390507-I1Open ↗
08/13/2026M00081951-S1Open ↗
▸BISSAFETY MONITORING PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMAINTENANCE INFORMATION1
08/13/2020123717120Open ↗