← Back
Two stories - detached, small or mid-size
2510 WOODHULL AVENUE
BRONX · Pelham Gardens · BIN 2053137
💬 Discuss this project
1940Year Built
1.75Stories
A1Building Class
R3-2Zoning
2,254 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · 3,325 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Filed — no permit issued24p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NGYUEN PHU T 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREATLY OBSERVED OBJECTIVES DEFINED406/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREATLY OBSERVED OBJECTIVES DEFINED303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616206/04/2025
Building Lifecycle
All (25)Filed (4)Violation (3)Objection (16)Special Inspection (2)
07/31/2026
Objection raised — C/O of existing property requi
07/31/2026
Objection raised — C/O of existing property requi
07/31/2026
Objection raised — C/O of existing property requi
07/31/2026
Objection raised — C/O of existing property requi
07/20/2026
Objection resolved — Resolved
07/08/2026
Objection raised — C/O of existing property requi
06/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
To Legalize a 3-PC Bathroom in the Cellar Fl, along a Washer-Dryer, To Legalize a Lav Sink & Gas Stove on the 1st Fl, & a 3-PC Bathroom in the Attic Fl. Remove OATH/ECB Violation: 39111252L (Work Without Permit).
X01063174-S3
04/01/2026
Violation issued (ECB, open)
Construction
06/10/2025
Objection raised — Energy
06/10/2025
Objection raised — Admin
06/09/2025
Objection raised — Admin
06/09/2025
Objection raised — Energy
06/09/2025
Objection raised — Plumbing
06/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
To Legalize a 3-PC Bathroom in the Cellar Fl, along a Washer-Dryer, To Legalize a Lav Sink & Gas Stove on the 1st Fl, & a 3-PC Bathroom in the Attic Fl. Remove OATH/ECB Violation: 39111252L (Work Without Permit).
X01063174-S1
06/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
To Legalize a 3-PC Bathroom in the Cellar Fl, along a Washer-Dryer, To Legalize a Lav Sink & Gas Stove on the 1st Fl, & a 3-PC Bathroom in the Attic Fl. Remove OATH/ECB Violation: 39111252L (Work Without Permit).
X01063174-S2
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
10/30/2024
Objection resolved — Resolved
10/30/2024
Objection resolved — Resolved
08/09/2024
Objection raised — Admin
08/09/2024
Objection raised — Cost
08/09/2024
Objection raised — Admin
07/30/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
To Legalize a 3-PC Bathroom in the Cellar Fl, along a Washer-Dryer, To Legalize a Lav Sink & Gas Stove on the 1st Fl, & a 3-PC Bathroom in the Attic Fl. Remove OATH/ECB Violation: 39111252L (Work Without Permit).
X01063174-I1
04/10/2024
Violation issued (ECB, open)
Construction
04/10/2024
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDKAMTECH RESTORATION CORP10/20/2021
1 project · most recent 06/19/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/19/2026——Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric Single Zone, MSZ System : MSZ-GL09NA 10,900 BTU · Heat Pump Outdoor ×2
Single Zone, MSZ System : MSZ-GL12NA 14,400 BTU · Heat Pump Outdoor ×2
Single Zone, MUZ System : MUZ-GL09NA. 9,000 BTU · Condensing Unit ×2
Single Zone, MUZ System : MUZ-GL12NA. 12,000 BTU · Condensing Unit ×2
Single Zone, MSY System : MSY-GL18NA 18,000 BTU · Heat Pump Outdoor ×1
Single Zone, MSY System : MSY-GL24NA 24,000 BTU · Pump ×1
Single Zone, MUY System : MUY-GL18NA 18,000 BTU · Heat Pump Outdoor ×1
Single Zone, MUY System : MUY-GL24NA. 22,500 BTU · Condensing Unit ×1
Heating
H.B. Smith Smith Cast Iron Boilers, BB14A-S/W-3 89,500 BTU · Radiant ×1
Htp Model - SSU 45N 38,000 BTU · Water Heater ×1
1 project · most recent 06/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/19/2026——Gas, Water/Sanitary
1 project · most recent 10/22/2021
FiledStatusContractorScope
10/22/2021CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/14/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/14/2025Energy Code Compliance Inspections—progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/15/2026X01063174-S3Request digital key ↗
08/15/2026X01063174-I1Request digital key ↗
08/15/2026X01063174-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/13/2021240310392Open ↗
▸BISWORK PERMIT APPLICATION1
10/20/2021240310392Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01063174-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X01063174-S3Open ↗
08/21/2026X01063174-I1Open ↗
08/21/2026X01063174-S1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/13/2021240310392Open ↗
▸Safety & Tenant Protection3
▸BISTPP1: TENANT PROTECTION PLAN1
10/18/2021240310392Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01063174-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01063174-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/13/2021240310392Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/01/2021240310392Open ↗
10/13/2021240310392Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/13/2021240310392Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/01/2021240310392Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/01/2021240310392Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/01/2021240310392Open ↗
10/13/2021240310392Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
12/02/2021240310392Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/02/2021240310392Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/01/2021240310392Open ↗
10/13/2021240310392Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
10/18/2021240310392Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2021240310392Open ↗
▸Other Documents3
▸BISTax Abatement Miscellaneous1
12/02/2021240310392Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01063174-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01063174-I1Open ↗