← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2511 FRISBY AVENUE
BRONX · BIN 2041895
💬 Discuss this project
1962Year Built
6Stories
D1Building Class
R6Zoning
37,380 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized52 Active Violations 51 unresolved · 1 paperwork only 1 likely answered 4 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: 2511 Frisby Ave · 9,710 sf lot · 3.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Morgan Group LLC1p · 2 filings · 6 docs
Floor 6Facade repair work for multi-family elevator buildings1 filing · 5 docs
Floor 5Facade repair work for multi-family elevator buildings1 filing · 5 docs
Floor 4Facade repair work for multi-family elevator buildings1 filing · 5 docs
Floor 3Facade repair work for multi-family elevator buildings1 filing · 5 docs
Floor 2Facade repair work for multi-family elevator buildings1 filing · 5 docs
Floor 1Facade repair work for multi-family elevator buildings1 filing · 5 docs
Site & exteriorPipe scaffold live load4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Egidio Realty Co503/21/2026
2511 Frisby Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2018$8.7M—2511 COOPER LLC → 2511 FRISBY AVE. LLC$233/sf building
05/20/2015$7.3M—EGIDIO REALTY CORP. → 2511 COOPER LLC$195/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APT201/31/2024
Enthink Engineers206/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group103/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RK ContractingGeneral Contractor203/21/2026
Cel Tech Electricspecialty_contractor107/08/2026
RK ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842201/31/2024
Enthink Engineers6247106/07/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/29/2026
Boiler inspection report filed
Initial · no defects · Payment Verification In Progress
08/11/2026
Atoi observed that the compactor that been installed under permit# 200262562 , has been removed from the cellar . The incinerator room is currently…
ECB violation · open
08/11/2026
Atoi observed unapproved, unsafe, unsuitable, noncompliant electrical equipment, apparatus, materials, devices, and/or wiring in use at the laundry…
ECB violation · open
08/11/2026
Atoi observed fail to maintain , at gas meter room missing fresh air intake , at laundry room ceiling exposed gas waste water and waste pipes as…
ECB violation · open
223 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRK Contracting06/13/2022
DOB NOWSupported ScaffoldSigned-offRK Contracting06/01/2022
DOB NOWAntennaSigned-offCel Tech Electric08/20/2018
BISOTISSUEDCostrotta Construction Ma05/09/2014
BISBLISSUEDStar Industrial Service08/21/2008
BISMHISSUEDTri-State Telecommunications06/19/2006
BISOTISSUEDTri-State Telecomm06/19/2006
BISBLISSUEDNew York Heating10/27/1999
BISSPISSUEDApple Incinerator & Compaction07/28/1993
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/27/2022MasonrySunil Saigalspecial
05/27/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
05/27/2022FinalSunil Saigalprogress
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account