← Back
BuildNYC
Elevator apt, semi-fireproof with stores
2515 ADAM CLAYTON POWELL JR BOULEVARD
MANHATTAN · BIN 1060193
💬 Discuss this project
1910Year Built
6Stories
D7Building Class
R7-2Zoning
15,430 sfGross Floor Area
19Units
Rent Stabilized14 Active Violations 13 unresolved · 1 paperwork only 1 likely answered ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 2515 LLC · 4,000 sf lot · 3.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1King Jamaican & American Restaurant8p · 2 filings · 5 docs
CellarKing Jamaican & American Restaurant3p · 1 filing · 3 docs
Site & exteriorFacade Repair2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2515 LLC603/22/2026
2515LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Denis Associates104/02/2026
Asr Engineering112/26/2023
Mje Professional Services111/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Permit Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sahi ConstructionGeneral Contractor303/21/2026
Jake and Nate ConstructionScaffold303/21/2026
Control Electrical Cont'gElectrical103/21/2026
Nationwide MechanicalPlumbing106/28/2026
Building Lifecycle
All (72)Filed (3)Permit Issued (3)Signed Off (1)Facade (FISP) (3)Violation (60)Inspection (1)Special Inspection (1)
04/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2026
Permit issued — Plumbing
M01377865-I1-PL
04/02/2026
Filed — Alteration
Replace commercial cooking equipment on existing roughing, no change in use, egress or occupancy.
M01377865-I1
06/12/2025
Cycle 10 facade inspection completed
06/12/2025
Cycle 10 facade report signed — SWARMP
05/14/2025
Cycle 10 facade report submitted
04/14/2025
Violation issued (HPD, closed)
C
03/20/2025
Violation issued (HPD, closed)
C
09/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2024
Signed off — Alteration
M00975665-I1
06/20/2024
Violation issued (ECB, open)
Elevators
05/30/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
01/05/2024
Permit issued — General Construction
M00975665-I1-GC
12/26/2023
Filed — Alteration
M00975665-I1
12/12/2023
Violation issued (ECB, closed)
Construction
12/12/2023
Special inspection requirement — Final
RAFI HAMID
11/09/2023
Permit issued — Sidewalk Shed
M00959276-I1-SH
11/08/2023
Filed — Alteration
M00959276-I1
11/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2023
Violation issued (ECB, closed)
Construction
05/23/2023
Violation issued (HPD, closed)
B
05/23/2023
Violation issued (HPD, closed)
A
05/23/2023
Violation issued (HPD, closed)
C
03/15/2023
Violation issued (HPD, closed)
A
03/08/2023
Violation issued (HPD, closed)
B
01/11/2023
Violation issued (HPD, closed)
C
01/11/2023
Violation issued (HPD, closed)
C
12/13/2022
Violation issued (HPD, closed)
C
12/13/2022
Violation issued (HPD, closed)
C
12/13/2022
Violation issued (HPD, closed)
C
12/13/2022
Violation issued (HPD, closed)
C
03/22/2022
Violation issued (FDNY_ORDER, closed)
03/22/2022
Violation issued (FDNY_ORDER, closed)
03/22/2022
Violation issued (FDNY_ORDER, closed)
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, open)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
C
03/14/2022
Violation issued (HPD, closed)
B
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
B
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
03/14/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
A
09/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2020
Violation issued (ECB, closed)
Elevators
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/11/2016
Violation issued (HPD, open)
A
05/11/2016
Violation issued (HPD, open)
A
05/11/2016
Violation issued (HPD, closed)
A
05/11/2016
Violation issued (HPD, closed)
A
05/03/2016
Violation issued (HPD, open)
A
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNationwide Mechanical04/07/2026
DOB NOWGeneral ConstructionSigned-offSahi Construction01/05/2024
DOB NOWSidewalk ShedPermit IssuedJake and Nate Construction11/09/2023
BISPLISSUEDChinatown Plumbing & Heating07/02/2004
BISFPISSUEDNew York Business Fire Systems I06/14/2004
BISMHISSUEDUniversal Groups of New York05/11/2004
BIS—ISSUEDGaetano Diplacidi & Associates11/08/2002
BISBLISSUEDRO-Sal Plumbing & Heating04/08/2002
BISSPISSUEDRO-Sal Plumbing & Heating04/04/2002
BISPLISSUEDRO-Sal Plumbing & Heating01/09/2002
BISEQISSUEDGaetano Diplacidi & Associates10/22/2001
BIS—ISSUEDGaetano Diplacidi & Associates04/25/2001
BISEQISSUEDGaetano Diplacidi & Associates04/25/2001
BISEQISSUEDClark & Wilkins Industries01/22/2001
1 project · most recent 04/02/2026
Gas
FiledStatusContractorScope
04/02/2026Signed-offNationwide MechanicalGas
1 project · most recent 11/13/2023
FiledStatusContractorScope
11/13/2023Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/12/2023FinalRAFI HAMIDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
King Jamaican & American RestaurantRestaurant / Food ServiceCellar, Floor 1
Project M01377865 Alteration · Permit Entire · 04/02/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026M00959276-I1Request digital key ↗
08/28/2026M00975665-I1Request digital key ↗
08/18/2026M01377865-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026M00959276-I1Open ↗
08/28/2026M00975665-I1Open ↗
08/18/2026M01377865-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026M00975665-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026M01377865-I1Open ↗