← Back
BuildNYC
Nursing home
2517 BARKER AVENUE
BRONX · BIN 2111063
💬 Discuss this project
1934Year Built
8Stories
I6Building Class
R7-1Zoning
283,833 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Nursing home · Owner of record: Light Property Holdings Associates · 81,885 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBeth Abraham8p · 1 filing · 20 docs
Site & exteriorBeth Abraham1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CBO603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/15/2017$25.0M—BETH ABRAHAM HEALTH SERVICES → LIGHT PROPERTY HOLDINGS ASSOCIATES LLC$88/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hansen Engineering409/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. Heating and Plumbing WorksPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering8174409/11/2025
Building Lifecycle
All (17)Filed (4)Permit Issued (1)Inspection (3)Special Inspection (9)
09/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Filed — Alteration
NSTALLATION OF COGEN SYSTEM GAS PIPING AND METER FOR (2) NEW COGEN UNITS AND A DOMESTIC HW STORAGE TANK
X01108000-P2
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2025
Filed — Alteration
NSTALLATION OF COGEN SYSTEM GAS PIPING AND METER FOR (2) NEW COGEN UNITS AND A DOMESTIC HW STORAGE TANK
X01108000-P1
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
04/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Permit issued — Plumbing
X01108000-S1-PL
09/12/2024
Filed — Alteration
NSTALLATION OF COGEN SYSTEM GAS PIPING AND METER FOR (2) NEW COGEN UNITS AND A DOMESTIC HW STORAGE TANK
X01108000-I1
09/12/2024
Filed — Alteration
NSTALLATION OF COGEN SYSTEM GAS PIPING AND METER FOR (2) NEW COGEN UNITS AND A DOMESTIC HW STORAGE TANK
X01108000-S1
09/09/2024
Special inspection requirement — Mechanical Systems
Ryan Hansen
09/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
09/09/2024
Special inspection requirement — Maintenance information
Ryan Hansen
09/09/2024
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.H. Eagle Plumbing09/18/2024
1 project · most recent 09/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/11/2025Signed-offA. Heating and Plumbing WorksGas, Water/Sanitary
1 project · most recent 01/14/2025
General Wiring
FiledStatusContractorScope
01/14/2025Permit IssuedJohn StassiGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/11/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/01/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
09/09/2024Mechanical SystemsRyan Hansenspecial
09/09/2024Duct leakage testing, insulation and designRyan Hansenenergy_progress
09/09/2024HVAC-R and service water heating equipmentRyan Hansenenergy_progress
09/09/2024HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
09/09/2024HVAC-R and service water heating system controlsRyan Hansenenergy_progress
09/09/2024Maintenance informationRyan Hansenenergy_progress
09/09/2024Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Beth AbrahamMedical / HealthcareCellar
Project X01108000 Alteration · Permit Entire · 09/12/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026X01108000-S1Request digital key ↗
08/18/2026X01108000-I1Request digital key ↗
08/18/2026X01108000-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026X01108000-I1Open ↗
09/02/2026X01108000-I1Open ↗
09/02/2026X01108000-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026X01108000-I1Open ↗
08/18/2026X01108000-P2Open ↗
08/18/2026X01108000-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026X01108000-I1Open ↗
09/01/2026X01108000-P2Open ↗
08/25/2026X01108000-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026X01108000-I1Open ↗
08/18/2026X01108000-P2Open ↗
08/18/2026X01108000-P1Open ↗
Showing 3 of 4 on file for this type