← Back
Two stories - detached, small or mid-size
252-15 HORACE HARDING EXPWY
QUEENS · Douglaston-Little Neck · BIN 4171483
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R1-2Zoning
1,404 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 1,786 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Filed — no permit issued13p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOCK DEBOER, AIA205/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING403/21/2026
Building Lifecycle
All (47)Filed (2)Objection (28)Special Inspection (17)
01/08/2026
Objection resolved — Addressed
02/18/2025
Objection raised — Inspections
02/18/2025
Objection resolved — Addressed
01/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
01/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
01/22/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
11/14/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Other
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Inspections
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Scope
06/06/2024
Objection raised — Fire_Protection
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Zoning
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Zoning
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Inspections
06/06/2024
Objection raised — Zoning
06/06/2024
Objection raised — Zoning
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Zoning
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Other
06/06/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Admin
06/06/2024
Objection raised — Zoning
05/30/2024
Filed — Alteration
Plumbing in conjunction with construction
Q01053573-S1
05/29/2024
Filed — Alteration
Plumbing in conjunction with construction
Q01053573-I1
05/20/2024
Special inspection requirement — Final
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
05/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
05/20/2024
Special inspection requirement — Structural Wood Frame
05/20/2024
Special inspection requirement — Fenestration air leakage
05/20/2024
Special inspection requirement — Insulation placement and R values
05/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
05/20/2024
Special inspection requirement — Air barrier — testing
05/20/2024
Special inspection requirement — Lighting in dwelling units
05/20/2024
Special inspection requirement — Lighting controls
05/20/2024
Special inspection requirement — Mechanical Systems
05/20/2024
Special inspection requirement — Protection of exposed foundation insulation
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nothing on file for this building.
1 project · most recent 05/30/2024
Water/Sanitary
FiledStatusContractorScope
05/30/2024——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/31/2025HVAC-R and service water heating system controls—energy_progress
01/31/2025HVAC-R and service water piping design and insulation—energy_progress
01/31/2025HVAC-R and service water heating equipment—energy_progress
05/20/2024Final—progress
05/20/2024Energy Code Compliance Inspections—progress
05/20/2024Fire-Resistance Rated Construction—progress
05/20/2024Structural Wood Frame—progress
05/20/2024Fenestration air leakage—energy_progress
05/20/2024Insulation placement and R values—energy_progress
05/20/2024Fenestration and door U-factor and product ratings—energy_progress
05/20/2024Air barrier — testing —energy_progress
05/20/2024Lighting in dwelling units—energy_progress
05/20/2024Lighting controls—energy_progress
05/20/2024Mechanical Systems—special
05/20/2024Protection of exposed foundation insulation—energy_progress
05/20/2024Fire-Resistant Penetrations and Joints—special
05/20/2024Structural Stability – Alterations of existing buildings—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026Q01053573-S1Request digital key ↗
08/22/2026Q01053573-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026Q01053573-S1Open ↗
08/22/2026Q01053573-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026Q01053573-S1Open ↗
08/22/2026Q01053573-I1Open ↗