Condo, residential tower (mixed-use, multi-family elevator) [derived]
252 BEDFORD AVENUE
BROOKLYN · BIN 3396636
💬 Discuss this project
2010Year Built
5Stories
RMBuilding Class
M1-4/R6BZoning
138,233 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized4 Active Violations 3 unresolved · 1 paperwork only 3 likely answered ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 41,419 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWalgreensUnder Construction28p · 3 filings · 20 docs
Floor 2Triton Realty Group LLC12p · 1 filing · 20 docs
Floor 1Walgreens31p · 2 filings · 20 docs
CellarWalgreens25p · 1 filing · 20 docs
Site & exteriorCitizensUnder Construction10p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Triton Realty Group3607/08/2026
Williamsburg Terrace3103/21/2026
201 Berry603/21/2026
East 112th Realty Co503/21/2026
Quadrid Realty Partners303/21/2026
BBN3 Mngmnt, LLC C/O N 3rd Bedf103/21/2026
SL Green Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kazam Consultants403/21/2026
Codegreen403/21/2026
New York & Company203/21/2026
Socotec403/21/2026
All in Permit Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Balaton ConsultingSign hanger207/08/2026
North Shore Neon Sign CoSign hanger207/08/2026
P.H. WorksPlumbing207/08/2026
Coil Techs HVAC Servicesspecialty_contractor107/08/2026
M. Fried Store FixturesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851302/18/2026
Twig Special Inspections885410/10/2025
Special Inspection Services1200205/18/2021
Building Lifecycle
All (113)Filed (10)Permit Issued (8)Signed Off (3)Violation (60)Inspection (2)Special Inspection (30)
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2026
Permit issued — Boiler Equipment
B01352012-I1-BE
03/06/2026
Permit issued — Plumbing
B01352012-S1-PL
02/18/2026
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS AND HOT WATER HEATERS. INSTALL DOMESTIC HOT WATER STORAGE TANKS. AKA 129 NORTH 3RD STREET, BROOKLYN
B01352012-I1
02/18/2026
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS AND HOT WATER HEATERS. INSTALL DOMESTIC HOT WATER STORAGE TANKS. AKA 129 NORTH 3RD STREET, BROOKLYN
B01352012-S1
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/06/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/03/2026
Permit issued — Sign
B01339030-I1-SG
02/03/2026
Permit issued — Sign
B01339034-I1-SG
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/03/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/30/2026
Special inspection requirement — Heating Systems
LOUIS ARENA
01/23/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL FOR CITIZENS BANK ON BEDFORD AVE ELEVATION.
B01339034-I1
01/23/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CITIZENS BANK ON N. 3RD STREET.
B01339030-I1
12/22/2025
Special inspection requirement — Final
JERE MURDOCH
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2025
Filed — Alteration
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 1ST AND 2ND FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01212922-P1
10/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dave Wall
10/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dave Wall
10/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dave Wall
10/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Dave Wall
10/10/2025
Special inspection requirement — Mechanical Systems
Dave Wall
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dave Wall
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
10/10/2025
Special inspection requirement — Post-installed Anchors
Dave Wall
10/10/2025
Special inspection requirement — Final
Dave Wall
10/10/2025
Special inspection requirement — Maintenance information
Dave Wall
08/13/2025
Special inspection requirement — Final
Dave Wall
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
08/13/2025
Special inspection requirement — Mechanical Systems
Dave Wall
08/13/2025
Special inspection requirement — Post-installed Anchors
Dave Wall
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dave Wall
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
05/20/2025
Permit issued — Mechanical Systems
B01212922-I1-MS
04/25/2025
Filed — Alteration
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 1ST AND 2ND FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01212922-I1
04/25/2025
Violation issued (FDNY_NOV, closed)
01/30/2025
Violation issued (HPD, closed)
A
12/12/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/08/2024
Violation issued (ECB, open)
Elevators
07/07/2024
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, closed)
B
06/26/2024
Violation issued (HPD, closed)
B
07/29/2023
Violation issued (HPD, open)
C
06/28/2023
Violation issued (HPD, closed)
A
06/28/2023
Violation issued (HPD, closed)
C
06/28/2023
Violation issued (HPD, closed)
A
06/28/2023
Violation issued (HPD, open)
C
06/28/2023
Violation issued (HPD, closed)
C
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedP.H. Works03/09/2026
DOB NOWPlumbingPermit IssuedP.H. Works03/06/2026
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co02/03/2026
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co02/03/2026
DOB NOWMechanical SystemsPermit IssuedCoil Techs HVAC Services05/20/2025
DOB NOWSignSigned-offNorth Shore Neon Sign Co11/23/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co11/23/2021
DOB NOWMechanical SystemsSigned-offM. Fried Store Fixtures03/10/2021
BISMHISSUEDBar Construction Services06/18/2021
BISSPISSUEDPrecision Plumbing Services08/23/2013
BISPLISSUEDHydro Tech Mechanical08/23/2013
BISSPISSUEDSkinner Plumbing & Heating06/27/2012
BISSPISSUEDMercury Fire Supp05/04/2012
BISPLISSUEDSkinner Plumbing & Heating12/02/2011
BISMHISSUEDGazebo Contracting12/01/2011
BISBLISSUEDHydro Tech Mechanical11/10/2011
BISOTISSUEDGazebo Contracting10/11/2011
BISSPISSUEDPrecision Plumbing Services01/13/2011
BISSPISSUEDManhattan Automatic Sprinkler10/12/2010
BISSPISSUEDRam Fire Protection09/30/2010
BISSPISSUEDManhattan Automatic Sprinkler07/19/2010
BISMHISSUEDDuane Reade - A NY Partners07/14/2010
BISOTISSUEDDuane Reade - A NY Partners06/28/2010
BISOTISSUEDAcc Construction04/27/2010
BISMHISSUEDAcc Construction04/27/2010
BISMHISSUEDAcc Construction04/16/2010
BISOTISSUEDAcc Construction04/16/2010
BISEQISSUEDH & B Construction NY01/04/2010
BISEQISSUEDJanbar11/23/2009
BISOTISSUEDJanbar11/23/2009
BISOTISSUEDJanbar01/26/2009
BISEQISSUEDH & B Construction NY01/14/2009
BISEQISSUEDH & B Construction NY02/25/2008
BISEQISSUEDH & B Construction11/28/2007
BISOTISSUEDAlcon Builders Group10/24/2007
BISEQISSUEDAlcon Builders Group10/24/2007
BISEQISSUEDThe Krew Maintenance01/05/2007
BISEQISSUEDThe Krew Maintenance01/05/2007
BISEQISSUEDThe Krew Maintenance01/05/2007
BISEQISSUEDThe Krew Maintenance12/05/2006
+ 8 more permits on file
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025Permit IssuedCoil Techs HVAC ServicesHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PFFY-P12NRMU-E 35,000 BTU · Vrf Indoor ×18
PEFY-P24NMAU-E4 27,000 BTU · Vrf Indoor ×8
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×6
PEFY-P54NMHU-E4 60,000 BTU · Vrf Indoor ×4
PFFY-P06NRMU-E 6,700 BTU · Vrf Indoor ×4
PUHY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×2
PUHY-EP384TSNU-A1 160,000 BTU · Vrf Outdoor ×2
6 projects · most recent 08/20/2026
General Wiring Lighting
FiledStatusContractorScope
08/20/2026Permit IssuedMartinez Electrical ContGeneral Wiring
05/22/2025Permit IssuedD'Alco ElectricalGeneral Wiring
03/27/2023CompleteSRM Electrical ServiceGeneral Wiring, Lighting
01/20/2022CompleteCity Electrical Sign Erectors—
01/20/2022CompleteCity Electrical Sign Erectors—
08/25/2020CompleteFqe ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
02/12/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
02/12/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
02/06/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/06/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/06/2026Maintenance informationLOUIS ARENAenergy_progress
02/06/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/03/2026Maintenance informationLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/30/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
01/30/2026Heating SystemsLOUIS ARENAspecial
12/22/2025FinalJERE MURDOCHprogress
10/10/2025HVAC-R and service water heating equipmentDave Wallenergy_progress
10/10/2025HVAC-R and service water heating system controlsDave Wallenergy_progress
10/10/2025HVAC-R and service water piping design and insulationDave Wallenergy_progress
10/10/2025Duct leakage testing, insulation and designDave Wallenergy_progress
10/10/2025Mechanical SystemsDave Wallspecial
10/10/2025Fire-Resistant Penetrations and JointsDave Wallspecial
10/10/2025Tenant Protection Plan ComplianceDave Wallspecial
10/10/2025Energy Code Compliance InspectionsDave Wallprogress
10/10/2025Post-installed AnchorsDave Wallspecial
10/10/2025FinalDave Wallprogress
10/10/2025Maintenance informationDave Wallenergy_progress
08/13/2025FinalDave Wallprogress
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CitizensBank / Financial branchFloor 1
Project B01339030 Alteration · Permit Entire · 01/23/2026
Project B01339034 Alteration · Permit Entire · 01/23/2026
Project B00622931 Alteration · LOC Issued · 11/22/2021
Project B00622935 Alteration · LOC Issued · 11/22/2021
WalgreensRetailCellar, Floor 1, Roof
Project B00451577 Alteration · LOC Issued · 03/04/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 518 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/31/2026B00622935-I1Request digital key ↗
08/31/2026B00622931-I1Request digital key ↗
08/20/2026B01212922-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00451577-I1Request digital key ↗
08/15/2026B00451577-P1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION61
05/26/2021321300043Open ↗
05/30/2020320493667Open ↗
01/21/2016321300043Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION29
06/18/2021321300043Open ↗
06/14/2021321300043Open ↗
06/10/2021321300043Open ↗
Showing 3 of 29 on file for this type
▸BISPLACE OF ASSEMBLY3
06/08/2020320493667Open ↗
05/30/2020320493667Open ↗
06/15/2012320493667Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/10/2020320493667Open ↗
11/21/2019320493667Open ↗
11/13/2019321300043Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/05/2013320713821Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
12/03/2014320493667Open ↗
▸Seals & Professional Certifications122
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
01/21/2016321300043Open ↗
07/27/2015320493667Open ↗
07/27/2015320493667Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026B01352012-S1Open ↗
09/01/2026B00451577-I1Open ↗
09/01/2026B00451577-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B01352012-S1Open ↗
09/01/2026B00451577-I1Open ↗
08/29/2026B01352012-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/21/2016321300043Open ↗
07/11/2013320787788Open ↗
11/28/2011320397584Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00451577-I1Open ↗
09/01/2026B00451577-P1Open ↗
08/20/2026B01212922-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
07/11/2013320787788Open ↗
11/28/2011320397584Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/21/2016321300043Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment65
▸BISSELF-CERT PLUMBING NOTICE19
07/10/2014320787788Open ↗
02/01/2014320787788Open ↗
03/07/2013320395513Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING15
01/30/2014320787788Open ↗
10/09/2013320787788Open ↗
07/11/2013320787788Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
08/22/2012320183341Open ↗
Showing 1 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
06/30/2015320282546Open ↗
06/29/2015320282546Open ↗
08/29/2014320240949Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
07/08/2021321300043Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
03/07/2013320395513Open ↗
06/09/2012320175617Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/30/2014320787788Open ↗
01/03/2014320787788Open ↗
▸Safety & Tenant Protection12
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
08/13/2026B01212922-P1Open ↗
08/13/2026B01352012-I1Open ↗
08/13/2026B00622935-I1Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist3
02/15/2012320411247Open ↗
Showing 1 of 3 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
07/11/2013320787788Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00451577-P1Open ↗
09/01/2026B00451577-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY4
03/26/2012320356707Open ↗
12/23/2011320411247Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/21/2016321300043Open ↗
07/22/2014320397584Open ↗
06/23/2014320397584Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/22/2014320397584Open ↗
03/26/2012320356707Open ↗
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)1
07/27/2015320493667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/08/2021321300043Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00451577-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/08/2021321300043Open ↗
07/08/2021321300043Open ↗
▸BISHYDRO FLOW TEST LETTER2
03/05/2013320395513Open ↗
05/29/2012320395513Open ↗
▸Approvals, Objections & Sign-offs73
▸BISADMINISTRATIVE OBJECTIONS28
07/11/2013320787788Open ↗
06/15/2012320493667Open ↗
12/30/2011320411256Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
07/13/2021321300043Open ↗
06/30/2015320282546Open ↗
06/29/2015320282546Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
07/28/2015320493667Open ↗
07/27/2015320493667Open ↗
04/25/2014310045411Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
11/07/2012320411256Open ↗
09/19/2012320411256Open ↗
12/30/2011320411256Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISThird Party Electrical Signoff Compliance Report1
05/22/2013320089391Open ↗
▸BISFLAME SPREAD/FIRE LETTER1
07/28/2015320493667Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT44
01/21/2016321300043Open ↗
06/30/2015320282546Open ↗
08/29/2014320240949Open ↗
Showing 3 of 44 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/13/2021321300043Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/08/2021321300043Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET23
01/21/2016321300043Open ↗
07/12/2013320787788Open ↗
02/20/2013320713821Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION10
07/29/2021320493667Open ↗
05/26/2021321300043Open ↗
08/29/2014320240949Open ↗
Showing 3 of 10 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
03/05/2013320713821Open ↗
Showing 1 of 2 on file for this type
▸BISBOROUGH INTAKE FORM1
06/14/2021321300043Open ↗
▸Other Documents16
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS6
08/29/2014320240949Open ↗
05/13/2013320183341Open ↗
Showing 2 of 6 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED4
08/29/2014320240949Open ↗
Showing 1 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/29/2021320493667Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDHCR Document2
08/13/2026B00622935-I1Open ↗
08/13/2026B00622931-I1Open ↗
▸BISPLOT DIAGRAM1
12/30/2011320411256Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type