← Back
Two family converted from one family
252 MYRTLE AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5136871
💬 Discuss this project
1901Year Built
2.5Stories
B3Building Class
R3AZoning
1,780 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 5,980 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC301/25/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LL CUSTOM HOMES LLCGeneral Contractor207/08/2026
TESTA ELECTRIC CO., INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216301/25/2023
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Special Inspection (10)
08/08/2023
Signed off — Alteration
RECONSTRUCTION OF AN EXISTING TWO CAR GARAGE TO THE SAME FOOTPRINT AND HEIGHT.
S07996796-I1
08/08/2023
Signed off — Alteration
RECONSTRUCTION OF AN EXISTING TWO CAR GARAGE TO THE SAME FOOTPRINT AND HEIGHT.
S07996796-S1
02/22/2023
Permit issued — General Construction
S07996796-S1-GC
01/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
01/26/2023
Special inspection requirement — Final
Steven Savino
01/25/2023
Filed — Alteration
RECONSTRUCTION OF AN EXISTING TWO CAR GARAGE TO THE SAME FOOTPRINT AND HEIGHT.
S07996796-P1
01/17/2023
Special inspection requirement — Final
01/17/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
11/30/2022
Filed — Alteration
RECONSTRUCTION OF AN EXISTING TWO CAR GARAGE TO THE SAME FOOTPRINT AND HEIGHT.
S07996796-S1
09/27/2022
Permit issued — General Construction
S07996796-I1-GC
09/19/2022
Filed — Alteration
RECONSTRUCTION OF AN EXISTING TWO CAR GARAGE TO THE SAME FOOTPRINT AND HEIGHT.
S07996796-I1
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
09/01/2022
Special inspection requirement — Lighting in dwelling units
Steven Savino
09/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
08/31/2022
Special inspection requirement — Final
Steven Savino
07/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLL CUSTOM HOMES LLC02/22/2023
DOB NOWGeneral ConstructionSigned-offLL CUSTOM HOMES LLC09/27/2022
1 project · most recent 04/11/2023
General Wiring
FiledStatusContractorScope
04/11/2023CompleteTESTA ELECTRIC CO., INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/26/2023Concrete - Cast-In-PlaceSteven Savinospecial
01/26/2023FinalSteven Savinoprogress
01/17/2023Final—progress
01/17/2023Concrete - Cast-In-PlaceSteven Savinospecial
09/01/2022Fire-Resistant Penetrations and JointsSteven Savinospecial
09/01/2022Lighting in dwelling unitsSteven Savinoenergy_progress
09/01/2022Structural Stability – Alterations of existing buildingsSteven Savinospecial
09/01/2022Energy Code Compliance InspectionsSteven Savinoprogress
09/01/2022Fire-Resistance Rated ConstructionSteven Savinoprogress
08/31/2022FinalSteven Savinoprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026S07996796-I1Request digital key ↗
08/24/2026S07996796-S1Request digital key ↗
08/24/2026S07996796-P1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026S07996796-S1Open ↗
08/24/2026S07996796-P1Open ↗
08/24/2026S07996796-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/16/2026S07996796-S1Open ↗
08/24/2026S07996796-I1Open ↗
08/24/2026S07996796-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/16/2026S07996796-S1Open ↗
08/25/2026S07996796-P1Open ↗
08/24/2026S07996796-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026S07996796-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S07996796-P1Open ↗
08/13/2026S07996796-S1Open ↗