← Back
Two stories - detached, small or mid-size
252 RUGBY ROAD
BROOKLYN · BIN 3118337
💬 Discuss this project
1925Year Built
2.75Stories
A1Building Class
R3XZoning
2,426 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 33p · 3 filings · 20 docs
Floor 2
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/18/2022$1.5M—Private party → Private party$602/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION609/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY LINE INTERIORS INCGeneral Contractor304/09/2026
HENRY MYERS P & H, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781509/21/2023
EC SPECIAL INSPECTIONS8355101/19/2023
Building Lifecycle
All (37)Filed (6)Permit Issued (3)Signed Off (3)Inspection (5)Special Inspection (20)
04/01/2026
Signed off — Alteration
Install two (2) Split HVAC Systems throughout the building
B08030749-I1
10/07/2025
Permit issued — Mechanical Systems
B08030749-I1-MS
07/17/2025
Signed off — Alteration
Remove furnace, gas meter and gas piping throughout, perform plumbing work on all floors
B08030754-I1
07/17/2025
Signed off — Alteration
Make partitions changes, remove chimney, remove deck, construct pergola, enlarge 3rd floor dormer and rebuild both exteriors stairs
B08030761-I1
09/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2023
Filed — Alteration
Install two (2) Split HVAC Systems throughout the building
B08030749-P1
09/20/2023
Filed — Alteration
Make partitions changes, remove chimney, remove deck, construct pergola, enlarge 3rd floor dormer and rebuild both exteriors stairs
B08030761-P1
09/20/2023
Filed — Alteration
Remove furnace, gas meter and gas piping throughout, perform plumbing work on all floors
B08030754-P1
09/20/2023
Special inspection requirement — Lighting in dwelling units
Steven Bendoraitis
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/20/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/20/2023
Special inspection requirement — Permanent certificate
Steven Bendoraitis
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Final
Steven Bendoraitis
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/19/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/19/2023
Special inspection requirement — Final
Steven Bendoraitis
09/19/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/19/2023
Special inspection requirement — Permanent certificate
Steven Bendoraitis
09/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/19/2023
Permit issued — Plumbing
B08030754-I1-PL
01/24/2023
Permit issued — General Construction
B08030761-I1-GC
01/19/2023
Filed — Alteration
Install two (2) Split HVAC Systems throughout the building
B08030749-I1
01/19/2023
Filed — Alteration
Remove furnace, gas meter and gas piping throughout, perform plumbing work on all floors
B08030754-I1
01/19/2023
Filed — Alteration
Make partitions changes, remove chimney, remove deck, construct pergola, enlarge 3rd floor dormer and rebuild both exteriors stairs
B08030761-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCITY LINE INTERIORS10/07/2025
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC04/19/2023
DOB NOWGeneral ConstructionSigned-offCITY LINE INTERIORS01/24/2023
2 projects · most recent 03/09/2023
General Wiring
FiledStatusContractorScope
03/09/2023CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
02/10/2023CompleteANTONIO CERIELLO ELEC INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/20/2023Lighting in dwelling unitsSteven Bendoraitisenergy_progress
09/20/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/20/2023Maintenance informationSteven Bendoraitisenergy_progress
09/20/2023Permanent certificateSteven Bendoraitisenergy_progress
09/20/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/20/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/20/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/20/2023FinalSteven Bendoraitisprogress
09/20/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/19/2023Mechanical SystemsCHRISTIAN LOZADAspecial
09/19/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/19/2023FinalSteven Bendoraitisprogress
09/19/2023Maintenance informationSteven Bendoraitisenergy_progress
09/19/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/19/2023Permanent certificateSteven Bendoraitisenergy_progress
09/19/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/19/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/19/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B08030761-I1Request digital key ↗
08/27/2026B08030761-P1Request digital key ↗
08/26/2026B08030754-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026B08030754-I1Open ↗
08/29/2026B08030754-I1Open ↗
08/29/2026B08030754-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B08030761-I1Open ↗
08/27/2026B08030761-P1Open ↗
08/26/2026B08030754-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B08030754-I1Open ↗
08/25/2026B08030749-P1Open ↗
08/23/2026B08030761-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B08030761-I1Open ↗
08/27/2026B08030761-P1Open ↗
08/26/2026B08030754-P1Open ↗
Showing 3 of 6 on file for this type