← Back
Elevator cooperative
Kings Bay Housing Co
2520 BATCHELDER STREET · BIN 3320928
💬 Discuss this project
1958Year Built
8Stories
D4Building Class
R3-2Zoning
583,001 sfGross Floor Area
540Units
LL97 CoveredRent Stabilized34 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: KINGSBAY SECTION ONE LAND LLC · 221,280 sf lot · 2.63 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 6 filings · 20 docs
Floor 8Under Construction1 filing · 15 docs
Floor 7Under Construction1 filing · 15 docs
Floor 6Under Construction1 filing · 15 docs
Floor 5Under Construction1 filing · 15 docs
Floor 4Under Construction1 filing · 15 docs
Floor 3Under Construction1 filing · 15 docs
Floor 2Under Construction1p · 2 filings · 20 docs
Floor 1Under Construction3p · 3 filings · 20 docs
CellarUnder Construction17p · 4 filings · 20 docs
Basement1p · 1 filing · 13 docs
2 jobs · most recent 08/11/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
08/11/2026——Gas, Water/Sanitary
12/05/2025——Gas, Storm, Water/Sanitary
3 jobs · most recent 08/11/2026
Boiler Controls
FiledStatusContractorScope
08/11/2026Permit IssuedMAXIMUM ELECTRIC CORP.Boiler Controls
04/05/2024Permit IssuedTOP SHELF ELECTRIC CORP—
01/27/2022CompleteJAM ELECTRICAL CORP—
1 job · most recent 11/12/2025
Steel
FiledStatusContractorScope
11/12/2025——Steel
1 job · most recent 08/12/2026
Sidewalk Shed
FiledStatusContractorScope
08/12/2026Permit IssuedCENTRAL CONSTRUCTION MANASidewalk Shed
1 job · most recent 11/06/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/06/2025Permit IssuedAM&G WATERPROOFING LLCTenant Protection Plan 72 Hour
1 job · most recent 07/28/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/28/2026Permit IssuedAM&G WATERPROOFING LLCSuspended Scaffold (SC)
Building Lifecycle
All (166)Filed (13)Permit Issued (8)Facade (FISP) (12)Violation (60)Objection (43)Special Inspection (30)
08/31/2026
Permit issued — Suspended Scaffold
B01355927-I1-SC
08/31/2026
Permit issued — Sidewalk Shed
B01097043-I1-SH
08/25/2026
Permit issued — General Construction
B01310290-S3-GC
08/12/2026
Filed — Alteration
Installation of a sidewalk shed
B01097043-P1
08/11/2026
Filed — Alteration
Replacement of existing mechanical equipment as shown on plans. No change to use and egress.
B01310290-S3
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
C
08/05/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Other
07/28/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01355927-P1
07/28/2026
Special inspection requirement — Chimneys and vents
SEBASTIAN SETTEDUCATE JR., P.E
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
07/27/2026
Objection resolved — Addressed
07/23/2026
Permit issued — Boiler Equipment
B01310290-S1-BE
03/02/2026
Permit issued — Suspended Scaffold
B01355927-I1-SC
02/26/2026
Permit issued — General Construction
B01308386-I1-GC
02/25/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01355927-I1
01/23/2026
Special inspection requirement — Final
ANTHONY ORLANDO
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY ORLANDO
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
01/22/2026
Filed — Alteration
Filing for interior renovations as plans filed herewith. No change in use, occupancy or egress.
B01308395-P1
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/12/2026
Special inspection requirement — Final
ANTHONY ORLANDO
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY ORLANDO
12/22/2025
Objection raised — Plumbing
12/22/2025
Objection raised — Plumbing
12/22/2025
Objection raised — Plumbing
12/22/2025
Objection raised — Energy
12/22/2025
Objection raised — Plumbing
12/22/2025
Objection raised — Inspections
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Zoning
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Scope
12/22/2025
Objection raised — Scope
12/22/2025
Objection raised — Scope
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Fire_Protection
12/22/2025
Objection raised — Plumbing
12/18/2025
Objection raised — Fire_Protection
12/18/2025
Objection raised — Fire_Protection
12/18/2025
Objection raised — Mechanical
12/18/2025
Objection raised — Scope
12/18/2025
Objection raised — Fire_Protection
12/18/2025
Objection raised — Mechanical
12/18/2025
Objection raised — Scope
12/18/2025
Objection raised — Inspections
12/18/2025
Objection raised — Fire_Protection
12/09/2025
Filed — Alteration
Replacement of existing mechanical equipment as shown on plans. No change to use and egress.
B01310290-S1
12/05/2025
Filed — Alteration
Replacement of water, sanitary, and vent piping as shown on plans. new gas piping to boilers. No change to use and egress.
B01310293-I1
12/05/2025
Filed — Alteration
Replacement of existing mechanical equipment as shown on plans. No change to use and egress.
B01310290-I1
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
12/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Latest 60 of 166 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGSBAY SECTION ONE LAND LLC503/22/2026
ARCO GOLD MANAGEMENT203/22/2026
KINGS BAY HOUSING503/21/2026
CENTRAL CONSTRUCTION MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CRUICKSHANKS ENGINEERING & CONSULTI208/12/2026
LAWLESS AND MANGIONE808/11/2026
KAZI ASSOCIATES103/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
DANICO SERVICES203/21/2026
LAWLESS AND MANGIONE603/21/2026
CH BUILDING CONSULTANTS203/21/2026
LAWLESS MANGIONE ARCHITECT EN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor309/01/2026
KONARZEWSKI, TADEUSZElectrical103/21/2026
SAUBERMAN, ALVINElectrical103/21/2026
AM&G WATERPROOFING LLCGeneral Contractor104/09/2026
C C CONTROLLED COMBUSTIONGeneral Contractor108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688708/11/2026
URBAN INTEGRATIONS LLC7993207/28/2026
HRF SERVICES CORP5616103/09/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC08/31/2026
DOB NOWSidewalk ShedPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT08/31/2026
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION08/25/2026
DOB NOWBoiler EquipmentPermit IssuedC C CONTROLLED COMBUSTION07/23/2026
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC02/26/2026
DOB NOWSidewalk ShedPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT09/09/2025
DOB NOWSidewalk ShedPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT08/16/2024
BISOTISSUEDFUTURA BUILDERS GROUP INC.09/02/2016
BISOTISSUEDFUTURA BUILDERS GROUP INC.07/25/2016
BISOTISSUEDFUTURA BUILDERS INC08/03/2015
BISEQISSUEDCENTRAL CONSTRUCTION MANAGEMENT06/30/2011
BISEQISSUEDROCK SCAFFOLDING CORP04/29/2011
BISEQISSUEDCENTRAL CONSTRUCTION MANAGEMENT07/07/2010
BISEQISSUEDCENTRAL CONSTRUCTION MANAGEMENT07/02/2010
BISEQISSUEDCENTRAL CONSTRUCTION MANAGEMENT06/09/2010
BISEQISSUEDROCK SCAFFOLDING CORP05/14/2010
BISPLISSUEDBELL FUEL OIL, LLC12/20/2007
BISBLISSUEDABILENE, INC12/20/2007
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/28/2026Chimneys and ventsSEBASTIAN SETTEDUCATE JR., P.Especial
07/28/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
01/23/2026FinalANTHONY ORLANDOprogress
01/23/2026Fire-Resistance Rated ConstructionANTHONY ORLANDOprogress
01/23/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
01/23/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
01/12/2026Fire-Resistant Penetrations and Joints—special
01/12/2026Tenant Protection Plan Compliance—special
01/12/2026FinalANTHONY ORLANDOprogress
01/12/2026Fire-Resistance Rated ConstructionANTHONY ORLANDOprogress
12/05/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
12/05/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
12/05/2025Energy Code Compliance Inspections—progress
12/05/2025HVAC-R and service water heating system controls—energy_progress
12/05/2025HVAC-R and service water piping design and insulation—energy_progress
12/05/2025Maintenance information—energy_progress
12/05/2025HVAC-R and service water heating equipment—energy_progress
10/29/2025Final—progress
10/29/2025Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Final—progress
10/20/2025Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
10/20/2025Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 30.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B00832759-I1Request digital key ↗
08/24/2026B01097043-P1Request digital key ↗
08/24/2026B01097043-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION11
09/02/2016321228113Open ↗
08/09/2016321353352Open ↗
08/05/2015321353352Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
12/09/2010320162373Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026B01097043-P1Open ↗
08/24/2026B01097043-I1Open ↗
08/20/2026B01308386-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/17/2018321228113Open ↗
10/25/2017321353352Open ↗
09/10/2015321228113Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
06/10/2010320169125Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026B00832759-I1Open ↗
08/28/2026B01308395-I1Open ↗
08/28/2026B01308395-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026B00832759-I1Open ↗
09/26/2026B01305611-I1Open ↗
08/29/2026B01310290-S3Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/10/2010320169125Open ↗
05/17/2010320162373Open ↗
11/19/2007310054534Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/19/2007310054534Open ↗
▸BISSCHEDULE B - PLUMBING1
11/23/2007310054534Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/31/2008310054534Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026B01308386-I1Open ↗
08/20/2026B01308395-I1Open ↗
08/19/2026B01305611-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/10/2010320169125Open ↗
05/17/2010320162373Open ↗
▸BISASBESTOS INSPECTION REPORT1
12/19/2007310054534Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/17/2018321228113Open ↗
10/25/2017321353352Open ↗
▸Inspections & Test Reports2
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION2
08/01/2008310054534Open ↗
11/19/2007310054534Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/20/2026B01308395-I1Open ↗
08/19/2026B01310290-S3Open ↗
08/15/2026B01355927-P1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/02/2018321228113Open ↗
01/17/2018321228113Open ↗
10/25/2017321353352Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/10/2010320169125Open ↗
05/17/2010320162373Open ↗
11/19/2007310054534Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
01/17/2018321228113Open ↗
10/25/2017321353352Open ↗
09/10/2015321228113Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET4
09/10/2015321228113Open ↗
06/19/2015321353352Open ↗
06/10/2010320169125Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/02/2018321228113Open ↗
01/17/2018321228113Open ↗
10/25/2017321353352Open ↗
▸BISADDITIONAL INFORMATION3
01/28/2014320162373Open ↗
12/09/2010320162373Open ↗
10/12/2010320162373Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications3
08/18/2026B01355927-I1Open ↗
08/15/2026B01355927-P1Open ↗
08/13/2026B01355927-I1Open ↗
▸DOB NOWCalculations3
08/18/2026B01355927-I1Open ↗
08/15/2026B01355927-P1Open ↗
08/13/2026B01355927-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/09/2016321353352Open ↗