← Back
BuildNYC
Five to six families
2521 WALLACE AVENUE
BRONX · BIN 2051397
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6Zoning
3,648 sfGross Floor Area
6Units
Rent Stabilized46 Active Violations 44 unresolved · 2 paperwork only ▸FDNY Report ↗
Five to six families · 2,500 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 32 filings · 7 docs
Floor 22 filings · 7 docs
Floor 12 filings · 7 docs
Cellar2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G R Restivo AIA211/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Orion Plumbing & Heating403/21/2026
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/05/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
01/29/2025
Failure to comply with commissioner's order contained in summons #35411085M issued on 01/19/2023, and failure to file a certificate of correction…
ECB violation · open
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
73 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 11/16/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/16/2023——Gas, Water/Sanitary
1 project · most recent 03/14/2023
General Wiring
FiledStatusContractorScope
03/14/2023Permit IssuedLerco ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/23/2024Fire-Resistant Penetrations and Joints—special
12/12/2023Energy Code Compliance InspectionsGeorge Restivoprogress
10/02/2023Final—progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account