← Back
Elevator cooperative
Kings Bay Houses Sec 2
3020 AVENUE Y · BIN 3320932
💬 Discuss this project
1960Year Built
8Stories
D4Building Class
R3-2Zoning
408,000 sfGross Floor Area
360Units
LL97 CoveredRent Stabilized172 Open Violations 165 unresolved · 7 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: KINGS BAY HOUSES SECT 2 INC · 207,623 sf lot · 1.97 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Roof3p · 1 filing · 6 docs
Cellar3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VINTAGE REAL ESTATE SERVICES1609/13/2026
KAJ NY CONSTRUCTION807/08/2026
ROCKLEDGE SCAFFOLD CORP503/22/2026
KINGS BAY HOUSES SECT 2 INC403/22/2026
KINGS BAY SECTION TWO ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SW ENGINEERING COMPANY406/19/2026
IKRA CONSULTING LLC108/15/2024
FL&M ENGINEERING DESIGN &INSPECTION105/09/2022
JOEL PHAGOO P.E. PLLC103/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
AE DESIGN SOLUTION403/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
A1 EXPEDITING SERVICE203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROTO RESTORATION CONSTRUCTIONGeneral Contractor507/01/2026
PRC CONSTRUCTION LLCGeneral Contractor409/07/2026
ACE GROUP NY CORPGeneral Contractor303/21/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor203/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor207/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/02/2026
SAL-TECH PLBG & HTG, INCPlumbing105/29/2026
NORMAN TCHERNOFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912406/19/2026
LEO Y LEE ASSOCIATES2481210/03/2025
Building Lifecycle
All (136)Filed (9)Permit Issued (18)Signed Off (2)Facade (FISP) (16)Violation (60)Inspection (5)Objection (8)Special Inspection (18)
09/03/2026
Permit issued — Sidewalk Shed
B01091957-I1-SH
08/31/2026
Signed off — Alteration
GENERAL CONSTRUCTION FOR EXISTING ROOF MEMBRANE & INSULATION REPLACEMENT AT MAIN & BULKHEAD ROOFS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01191258-I1
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
06/29/2026
Special inspection requirement — Final
Yakov Weinstein
06/29/2026
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
06/29/2026
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
06/25/2026
Permit issued — Suspended Scaffold
B01079668-I1-SC
06/19/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS ON ALL FACADES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01086198-P1
06/03/2026
Permit issued — Sidewalk Shed
B01091957-I1-SH
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Permit issued — Sidewalk Shed
B01091957-I1-SH
03/03/2026
Permit issued — General Construction
B01086198-I1-GC
03/03/2026
Permit issued — General Construction
B01191258-I1-GC
03/03/2026
Permit issued — General Construction
B01086198-I1-GC
01/30/2026
Permit issued — Plumbing
B00813764-I1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
10/06/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
10/03/2025
Filed — Alteration
installation of suspended scaffold for facade work and/or inspection . Amend #1 added hoists
B01079668-P1
10/03/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
10/03/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
09/18/2025
Permit issued — General Construction
B01191258-I1-GC
08/15/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Fire_Protection
07/24/2025
Objection raised — Fire_Protection
07/24/2025
Objection raised — Scope
07/24/2025
Objection raised — Scope
07/11/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR EXISTING ROOF MEMBRANE & INSULATION REPLACEMENT AT MAIN & BULKHEAD ROOFS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01191258-I1
07/03/2025
Permit issued — Suspended Scaffold
B01079668-I1-SC
04/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/26/2025
Permit issued — General Construction
B01086198-I1-GC
03/25/2025
Permit issued — Sidewalk Shed
B01091957-I1-SH
03/12/2025
Violation issued (HPD, open)
A
03/06/2025
Special inspection requirement — Insulation placement and R values
Yakov Weinstein
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
03/06/2025
Special inspection requirement — Final
Yakov Weinstein
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Yakov Weinstein
02/19/2025
Cycle 9 facade report submitted
02/19/2025
Cycle 9 facade report signed — UNSAFE
01/10/2025
Cycle 9 facade inspection completed
12/11/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, closed)
B
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
C
11/29/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 2525 BATCHELDER STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01091957-I1
08/07/2024
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS ON ALL FACADES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01086198-I1
08/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPRC CONSTRUCTION LLC09/03/2026
DOB NOWSuspended ScaffoldPermit IssuedPROTO RESTORATION CONSTRU06/25/2026
DOB NOWSidewalk ShedPermit IssuedPRC CONSTRUCTION LLC06/03/2026
DOB NOWSidewalk ShedPermit IssuedPRC CONSTRUCTION LLC03/13/2026
DOB NOWGeneral ConstructionPermit IssuedPROTO RESTORATION CONSTRU03/03/2026
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU03/03/2026
DOB NOWGeneral ConstructionPermit IssuedPROTO RESTORATION CONSTRU03/03/2026
DOB NOWPlumbingSigned-offSAL-TECH PLBG & HTG, INC01/30/2026
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU09/18/2025
DOB NOWSuspended ScaffoldPermit IssuedPROTO RESTORATION CONSTRU07/03/2025
DOB NOWGeneral ConstructionPermit IssuedPROTO RESTORATION CONSTRU03/26/2025
DOB NOWSidewalk ShedPermit IssuedPRC CONSTRUCTION LLC03/25/2025
DOB NOWSuspended ScaffoldPermit IssuedPROTO RESTORATION CONSTRU07/30/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/17/2024
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP12/07/2023
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC04/14/2023
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC05/10/2022
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP03/21/2019
BISEQISSUEDSPRING SCAFFOLDING LLC01/06/2014
BISEQISSUEDSPRING SCAFFOLDING LLC01/10/2013
BISEQISSUEDSPRING SCAFFOLDING LLC01/26/2012
BISEQISSUEDOUTDOOR INSTALLATION LLC04/12/2005
BISOTISSUEDMANHATTAN BOILER & EQUIP07/02/2003
1 project · most recent 02/21/2023
Water/Sanitary
FiledStatusContractorScope
02/21/2023Signed-offSAL-TECH PLBG & HTG, INCWater/Sanitary
6 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026Complete220 ELECTRIC LLCGeneral Wiring
01/23/2025Permit IssuedHIGH QUALITY ELECTRIC OF—
08/26/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
05/22/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
10/07/2019CompleteJAM ELECTRICAL CORP—
03/01/2019CompleteANTHONY G FERRY INC—
2 projects · most recent 08/15/2024
Sidewalk Shed
FiledStatusContractorScope
08/15/2024Permit IssuedPRC CONSTRUCTION LLCSidewalk Shed
05/09/2022Permit IssuedACE GROUP NY CORPSidewalk Shed
1 project · most recent 10/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/03/2025Permit IssuedPROTO RESTORATION CONSTRUSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/11/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/29/2026Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
06/29/2026FinalYakov Weinsteinprogress
06/29/2026MasonryJOSHUA LUCKRITZspecial
06/29/2026Post-installed AnchorsJOSHUA LUCKRITZspecial
06/29/2026Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
10/06/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
10/06/2025Post-installed AnchorsLeo Leespecial
10/03/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
10/03/2025Post-installed AnchorsLeo Leespecial
03/06/2025Insulation placement and R valuesYakov Weinsteinenergy_progress
03/06/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
03/06/2025FinalYakov Weinsteinprogress
03/06/2025Energy Code Compliance InspectionsYakov Weinsteinprogress
01/17/2023Post-installed AnchorsJOSHUA LUCKRITZspecial
01/17/2023Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
01/17/2023Electrical motors and elevatorsEDWARD SIMONIELLOenergy_progress
01/17/2023Maintenance informationEDWARD SIMONIELLOenergy_progress
01/17/2023Energy Code Compliance InspectionsEDWARD SIMONIELLOprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/29/2026B00733520-I1Request digital key ↗
08/27/2026B00813764-I1Request digital key ↗
08/24/2026B01091957-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00143171-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
01/16/2014320360701Open ↗
01/11/2013320360701Open ↗
01/26/2012320360701Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/27/2012320360701Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature9
08/27/2026B01191258-I1Open ↗
08/25/2026B01086198-I1Open ↗
08/25/2026B01086198-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026B01191258-I1Open ↗
08/27/2026B01191258-I1Open ↗
08/25/2026B01086198-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026B00143171-I1Open ↗
08/29/2026B00733520-I1Open ↗
08/13/2026B01091957-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/27/2012320360701Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/27/2012320360701Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00813764-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/11/2013320360701Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/26/2012320360701Open ↗
▸BISSHED LETTER1
01/16/2014320360701Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
04/25/2014320360701Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/02/2026B00143171-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01191258-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/14/2013320360701Open ↗
04/11/2013320360701Open ↗
▸BISEFILING COVER SHEET1
01/26/2012320360701Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
01/16/2014320360701Open ↗
01/16/2014320360701Open ↗
01/16/2014320360701Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations2
08/20/2026B01079668-I1Open ↗
08/13/2026B01079668-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/20/2026B01079668-I1Open ↗
08/13/2026B01079668-P1Open ↗
▸BISOP-4 - Special Report1
04/25/2014320360701Open ↗