Public elementary, junior or senior high
P.S. K811 Connie Lekas School
2525 HARING STREET · BIN 3204767
💬 Discuss this project
1958Year Built
3Stories
W1Building Class
R3-2Zoning
71,940 sfGross Floor Area
1Units
LL97 Covered19 Open Violations 13 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 93,720 sf lot · 0.77 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof18p · 2 filings · 20 docs
Floor 314p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
NYC PARKS 0103/22/2026
DOE 040303/22/2026
D.O.E 1 04203/22/2026
DOE PS 811 040403/22/2026
DEPT OF EDUCATION P.S.811203/22/2026
DOE PS 811703/22/2026
DEPT. OF EDUCATION 0103/22/2026
DOE P.S. 811 0103/22/2026
P.S 286 DEPT OF EDUC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DVL CONSULTING ENGINEERS, INC702/26/2026
AKRF, INC.302/26/2026
DRG ARCHITECTS202/19/2026
YSRAEL A. SEINUK, P.C.202/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCIS RICHARDSElectrical403/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
CASTELLI, TONIElectrical103/21/2026
PETTINELLI, EElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
RODRIGUEZ, JOSEElectrical103/21/2026
MELVA CONSTRUCTION CORPElectrical103/21/2026
Building Lifecycle
All (119)Filed (14)Violation (60)Objection (15)Special Inspection (30)
04/06/2026
Special inspection requirement — Post-installed Anchors
03/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/17/2026
Violation issued (ECB, open)
Construction
03/16/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
02/26/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S6
02/26/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S5
02/26/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S4
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/24/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S2
02/24/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S3
02/19/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-I1
02/19/2026
Filed — Alteration
Emergency generator integral fuel storage diesel tank
B01361367-S1
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/19/2026
Special inspection requirement — Post-installed Anchors
02/19/2026
Special inspection requirement — Post-installed Anchors
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/18/2026
Special inspection requirement — Final
02/18/2026
Special inspection requirement — Mechanical Systems
02/18/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
02/18/2026
Special inspection requirement — Final
02/18/2026
Special inspection requirement — Mechanical Systems
02/18/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
02/18/2026
Special inspection requirement — Final
02/18/2026
Special inspection requirement — Masonry
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/18/2026
Special inspection requirement — Post-installed Anchors
02/18/2026
Special inspection requirement — Structural Steel - Details
02/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/18/2026
Special inspection requirement — Structural Steel - Welding
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Violation issued (ECB, open)
Boilers
07/22/2025
Violation issued (ECB, open)
Construction
07/22/2025
Violation issued (ECB, open)
Construction
07/22/2025
Violation issued (ECB, open)
Construction
07/22/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Violation issued (FDNY_NOV, closed)
03/04/2025
Violation issued (FDNY_NOV, closed)
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2024
Special inspection requirement — Protection of exposed foundation insulation
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/2023
Filed — Alteration
PROVIDE A NEW BUILDING ENTRANCE AND NEW ELEVATOR TOWER. THIS WILL INCLUDE CONCRETE DEEP FOUNDATION, STEEL CANOPY EXTENSION, STAIR ALTERATION, AND A NEW 4 STORY CMU ELEVATOR TOWER.
B08041545-Z1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2023
Special inspection requirement — Lighting controls
06/21/2023
Special inspection requirement — Electrical motors and elevators
06/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
06/21/2023
Special inspection requirement — Interior lighting power
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISMHISSUEDS & W WILSON ENTERPRISES02/01/2019
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/03/2018
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/03/2018
BISOTISSUEDWHITESTONE CONSTRUCTION CORP06/26/2017
BISOTISSUEDWHITESTONE CONSTRUCTION CORP06/26/2017
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2016
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2016
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/09/2015
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/09/2015
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/28/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/28/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/28/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP01/02/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP01/02/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP12/11/2013
BISOTISSUEDURS GREINER INC01/26/1999
BISOTISSUEDURS GREINER INC07/14/1998
BISEQISSUEDSAFWAY STEEL PRODUCTS06/24/1998
BISPLISSUEDHAROLD HEADLEY PLUMBING05/31/1996
2 projects · most recent 02/26/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2026——Generators
Cooling
Jetson ACCM-030-A-B-G-2-1 1,875,720 BTU · Air Cooled Chiller ×5
Heat / Cool
Lg KNSAE241A 25,260 BTU · Heat Pump Outdoor ×3
KUSAE241A 25,260 BTU · Heat Pump Outdoor ×3
Ventilation
Loren Cook 100 ACEB 595 CFM · Exhaust Fan ×3
60 ACEB 100 CFM · Exhaust Fan ×2
120 ACEB 300 CFM · Exhaust Fan ×1
180 VCR 2,500 CFM ×1
70- ACEB 140 CFM · Exhaust Fan ×1
Generators
Caterpillar D250 250 kW · Generator ×1
Mtu MTU 6R0150 DS230 230 kW · Generator ×1
09/07/2023——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-A24KA PUZ-A24NHA 24,000 BTU · Heat Pump Outdoor ×1
PKA-A36KA PUZ-A36NHA 34,200 BTU · Heat Pump Outdoor ×1
Ventilation
Loren Cook 135 SQND 75 CFM · Exhaust Fan ×5
100 ACEB 600 CFM · Exhaust Fan ×1
150 ACEB 1,800 CFM · Exhaust Fan ×1
70 ACEB 300 CFM · Exhaust Fan ×1
80 ACEB 510 CFM · Exhaust Fan ×1
80 SQ 70 CFM · Exhaust Fan ×1
2 projects · most recent 02/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/26/2026——Gas, Storm, Water/Sanitary
09/07/2023——Gas, Storm, Water/Sanitary
12 projects · most recent 10/23/2025
General Wiring Lighting
FiledStatusContractorScope
10/23/2025Permit IssuedTESTA ELECTRIC CO., INCLighting
07/30/2025CompleteCHARAN ELEC'L ENTERP'S IN—
01/21/2023CompleteGEMINI ELECTRIC CO., INC.—
06/03/2022CompleteABM ELECTRIC, INC—
01/19/2021CompleteINLIGHT ELECTRICAL CORPGeneral Wiring
03/13/2020CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
02/04/2020CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/02/2019CompleteDYNAMO ELECTRICAL CORPGeneral Wiring
07/19/2019CompleteCHARAN ELEC'L ENTERP'S IN—
09/30/2018CompleteA & S ELECTRIC INC.General Wiring
08/21/2018Permit IssuedA & S ELECTRIC INC.—
02/02/2018Permit IssuedA & S ELECTRIC INC.General Wiring
2 projects · most recent 02/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/26/2026——Steel, Concrete
09/07/2023——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
04/06/2026Post-installed Anchors—special
03/29/2026Structural Stability – Alterations of existing buildings—special
03/16/2026Post-installed Anchors—special
02/26/2026Fire-Resistant Penetrations and Joints—special
02/19/2026Fire-Resistant Penetrations and Joints—special
02/19/2026Fire-Resistance Rated Construction—progress
02/19/2026Fire-Resistant Penetrations and Joints—special
02/19/2026Post-installed Anchors—special
02/19/2026Post-installed Anchors—special
02/18/2026Structural Stability – Alterations of existing buildings—special
02/18/2026Final—progress
02/18/2026Mechanical Systems—special
02/18/2026Fuel-Oil Storage and Fuel-Oil Piping Systems—special
02/18/2026Final—progress
02/18/2026Mechanical Systems—special
02/18/2026Emergency and Standby Power Systems (Generator)—special
02/18/2026Final—progress
02/18/2026Masonry—special
02/18/2026Fire-Resistant Penetrations and Joints—special
02/18/2026Post-installed Anchors—special
02/18/2026Structural Steel - Details—special
02/18/2026Structural Steel - High Strength Bolting—special
02/18/2026Structural Steel - Welding—special
10/16/2024Fire-Resistant Penetrations and Joints—special
10/16/2024Protection of exposed foundation insulation—energy_progress
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 811Education—
Project B01361367 Alteration · Objections · 02/19/2026
Ps 811 - BrooklynEducation—
Project B08041545 Alteration · Approved · 12/01/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B08041545-S9Request digital key ↗
08/27/2026B08041545-Z1Request digital key ↗
08/27/2026B08041545-S7Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2019321907807Open ↗
▸BISWORK PERMIT APPLICATION1
02/04/2019321907807Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B08041545-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026B08041545-S8Open ↗
08/27/2026B08041545-S9Open ↗
08/27/2026B08041545-Z1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/24/2019321907807Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/24/2019321907807Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/24/2019321907807Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/24/2019321907807Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/24/2019321907807Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B08041545-S6Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/13/2026B08041545-S6Open ↗
08/13/2026B08041545-S8Open ↗
08/13/2026B08041545-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/13/2026B01361367-S5Open ↗
08/13/2026B08041545-S1Open ↗
08/13/2026B01361367-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)13
08/13/2026B08041545-S6Open ↗
08/13/2026B01361367-S1Open ↗
08/13/2026B01361367-S2Open ↗
Showing 3 of 13 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/24/2019321907807Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/24/2019321907807Open ↗
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/18/2026B01361367-S2Open ↗
08/13/2026B08041545-I1Open ↗
08/13/2026B08041545-S8Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSite Survey: Initial1
08/13/2026B08041545-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B01361367-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B08041545-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B08041545-I1Open ↗