← Back
Two family converted from one family
2527 LACONIA AVENUE
BRONX · Pelham Gardens · BIN 2051897
💬 Discuss this project
1935Year Built
2.5Stories
B3Building Class
R4AZoning
3,276 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: PELHAM PKWY, RENTAL CORP · 2,500 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar5p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/29/2022$750K—Private party → PELHAM PKWY, RENTAL CORP$229/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC202/01/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUREKA ELECTRIC CONTNG COElectrical203/22/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232202/01/2023
Building Lifecycle
All (5)Filed (2)Permit Issued (1)Special Inspection (2)
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
02/01/2023
Filed — Alteration
Replacement of existing gas boiler, replace existing gas water heater with an electric water heater. No change in use, egress or occupancy under this application.
X08021819-P1
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
11/18/2022
Permit issued — Plumbing
X08021819-I1-PL
10/27/2022
Filed — Alteration
Replacement of existing gas boiler, replace existing gas water heater with an electric water heater. No change in use, egress or occupancy under this application.
X08021819-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC11/18/2022
1 project · most recent 02/01/2023
Gas
FiledStatusContractorScope
02/01/2023Permit IssuedCAPE PLUMBING INCGas
1 project · most recent 03/31/2023
General Wiring
FiledStatusContractorScope
03/31/2023CompleteEUREKA ELECTRIC CONTNG COGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/02/2023Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
02/01/2023Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026X08021819-P1Request digital key ↗
08/23/2026X08021819-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026X08021819-I1Open ↗
08/23/2026X08021819-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X08021819-P1Open ↗
08/23/2026X08021819-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X08021819-P1Open ↗
08/23/2026X08021819-I1Open ↗