← Back
Two family frame
253-26 148 ROAD
QUEENS · Rosedale · BIN 4290054
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,937 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family frame · 3,600 sf lot · 0.82 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR111/17/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281111/17/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (4)
03/05/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 31 modules, 12.71 KW 100A FEEDER CHANGE REQUIRED SYSTEM SIZE (DC)/(AC) #1: 6.15 KW/5.7 KVA 15 MODULES: HANWHA Q.PEAK DUO BLK ML-G10+ 410 15 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US
Q01320191-I1
12/08/2025
Permit issued — Solar
Q01320191-I1-SL
11/17/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 31 modules, 12.71 KW 100A FEEDER CHANGE REQUIRED SYSTEM SIZE (DC)/(AC) #1: 6.15 KW/5.7 KVA 15 MODULES: HANWHA Q.PEAK DUO BLK ML-G10+ 410 15 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US
Q01320191-I1
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
11/17/2025
Special inspection requirement — Final
Mina Makar
11/17/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/08/2025
1 project · most recent 11/17/2025
FiledStatusContractorScope
11/17/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/17/2025Fire-Resistant Penetrations and JointsMina Makarspecial
11/17/2025Energy Code Compliance InspectionsMina Makarprogress
11/17/2025FinalMina Makarprogress
11/17/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01320191-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01320191-I1Open ↗
08/26/2026Q01320191-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01320191-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01320191-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01320191-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01320191-I1Open ↗