← Back
Two family brick
253 86 STREET
BROOKLYN · BIN 3153091
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R3-2Zoning
2,952 sfGross Floor Area
2Units
Two family brick · 2,503 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TETTONIS ENGINEERING PLLC508/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA ASSOCAITES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBS DEVELOPMENT CORPORATIONGeneral Contractor309/26/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
Building Lifecycle
All (19)Filed (5)Permit Issued (4)Signed Off (1)Inspection (4)Special Inspection (5)
09/25/2026
Permit issued — General Construction
B01319860-S2-GC
08/06/2026
Signed off — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-I1
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Vasili Tettonis
08/06/2026
Special inspection requirement — Final
Vasili Tettonis
08/05/2026
Filed — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-P1
08/05/2026
Filed — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-P2
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Vasili Tettonis
08/03/2026
Special inspection requirement — Final
Vasili Tettonis
04/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Permit issued — Plumbing
B01319860-S1-PL
03/10/2026
Permit issued — General Construction
B01319860-I1-GC
03/09/2026
Permit issued — General Construction
B01319860-S2-GC
02/10/2026
Filed — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-S2
02/04/2026
Filed — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-S1
01/29/2026
Filed — Alteration
HEREWITH FILING DEMOLITION PLANS FOR RENOVATION OF INTERIOR FIRST FLOOR AREAS AND SECOND FLOOR BATHROOM AS SHOWN IN THE PLANS. ADDITIONAL PLANS TO BE FILED UNDER SEPARATE DOB FILING. NO CHANGES TO EGRESS, USE, OR OCCUPANCY.
B01319860-I1
11/16/2025
Special inspection requirement — Final
Vasili Tettonis
05/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJACOBS DEVELOPMENT CORPORATION09/25/2026
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/13/2026
DOB NOWGeneral ConstructionSigned-offJACOBS DEVELOPMENT CORPOR03/10/2026
DOB NOWGeneral ConstructionPermit IssuedJACOBS DEVELOPMENT CORPOR03/09/2026
1 project · most recent 08/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 project · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedTRITON ELECTRIC CORP.General Wiring
1 project · most recent 08/05/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/05/2026Permit IssuedJACOBS DEVELOPMENT CORPORTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/06/2026Energy Code Compliance InspectionsVasili Tettonisprogress
08/06/2026FinalVasili Tettonisprogress
08/03/2026Energy Code Compliance InspectionsVasili Tettonisprogress
08/03/2026FinalVasili Tettonisprogress
11/16/2025FinalVasili Tettonisprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01319860-S2Request digital key ↗
08/18/2026B01319860-S1Request digital key ↗
08/18/2026B01319860-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01319860-S1Open ↗
08/18/2026B01319860-P1Open ↗
08/18/2026B01319860-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/14/2026B01319860-S2Open ↗
09/14/2026B01319860-S2Open ↗
08/24/2026B01319860-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026B01319860-S1Open ↗
08/18/2026B01319860-I1Open ↗
08/18/2026B01319860-P2Open ↗
Showing 3 of 5 on file for this type