← Back
BuildNYC
Walk-up apt, over six families with stores
253 ELIZABETH STREET
MANHATTAN · BIN 1007900
💬 Discuss this project
1910Year Built
6Stories
C7Building Class
C6-2Zoning
8,740 sfGross Floor Area
9Units
Rent Stabilized3 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 253 Elizabeth Realty · 1,772 sf lot · 4.93 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 31 filing
Floor 2
Floor 12 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Magnum1311/10/2026
253 Elizabeth Realty1003/22/2026
MGS Associates303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Christopher Burgess411/09/2026
Structural Engineering Integrated110/03/2019
Salvator A. Caradonna JR108/13/2019
William Philip White106/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Burnham Nationwide403/21/2026
All in Permit Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
James M. Barb ConstructionScaffold303/21/2026
Frankie Plumbing & HeatingPlumbing210/07/2026
Demar PlumbingPlumbing203/21/2026
MCP RestorationGeneral Contractor103/21/2026
Shinque ConstructionGeneral Contractor103/21/2026
Arsenal ScaffoldingGeneral Contractor103/21/2026
Total Plumbing & HeatingPlumbing103/21/2026
Active SignsSign hanger107/08/2026
James M. Barb ConstructionGeneral Contractor107/08/2026
Hja Plumbing & HeatingPlumbing108/17/2011
Steel Lion DevelopmentGeneral Contractor112/22/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666211/09/2026
Ryan Special Engineering2018110/03/2019
Building Lifecycle
11/09/2026
Filed — Alteration
NEW BOILER SYSTEM AT 3RD FLOOR, CONNECTED TO EXISTING GAS, WATER, ANDDISTRIBUTION SYSTEMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01438749-P1
11/09/2026
Filed — Alteration
NEW BOILER SYSTEM AT 3RD FLOOR, CONNECTED TO EXISTING GAS, WATER, ANDDISTRIBUTION SYSTEMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01438749-P2
11/03/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
11/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
11/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Frankie Plumbing & Heating—
DOB NOW—Frankie Plumbing & Heating—
DOB NOW—James M. Barb Construction—
DOB NOW—Active Signs—
DOB NOW—James M. Barb Construction—
BIS—James M. Barb Construction—
BIS—James M. Barb Construction—
BIS—M.C.P. Restoration—
BIS—Hja Plumbing & Heating—
BIS—Arsenal Scaffold—
BIS—Demar Plumbing—
BIS—Demar Plumbing—
BIS—Shinque Construction—
BIS—Steel Lion Development—
BIS—Total Plumbing & Heating—
BIS—Advanced Plumbing Mechanical—
Nothing on file for this building.
Nothing on file for this building.
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account