| Owner | Filings | Most Recent |
|---|---|---|
| 253 LOCKMAN AVE VENTURES | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RYAN DESIGN ARCHITECTURE | 2 | 04/08/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| GRINBERG MANAGEMENT | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HIGH BEAM ELECTRIC CORP. | Electrical | 1 | 03/22/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/08/2025 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/27/2025 | Permit Issued | HIGH BEAM ELECTRIC CORP. | General Wiring |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/07/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 04/07/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 04/07/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 04/07/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 04/07/2025 | Maintenance information | — | energy_progress |
| 10/04/2024 | Maintenance information | — | energy_progress |
| 10/04/2024 | Permanent certificate | — | energy_progress |
| 09/10/2024 | Air barrier — testing | — | energy_progress |
| 08/26/2024 | Interior lighting power | — | energy_progress |
| 08/26/2024 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/26/2024 | Electric vehicle service equipment requirements | — | energy_progress |
| 08/26/2024 | Air barrier - visual inspection | — | energy_progress |
| 08/26/2024 | Fenestration areas | — | energy_progress |
| 08/26/2024 | Insulation placement and R values | — | energy_progress |
| 08/26/2024 | Metering | — | energy_progress |
| 08/26/2024 | Fenestration air leakage | — | energy_progress |
| 08/21/2024 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/23/2024 | Final | — | progress |
| 05/23/2024 | Footing and Foundation | — | progress |
| 05/23/2024 | Subgrade Inspections | — | special |
| 05/23/2024 | Concrete - Cast-In-Place | — | special |
| 05/23/2024 | Structural Stability – Alterations of existing buildings | — | special |
| 05/23/2024 | Fire-Resistant Penetrations and Joints | — | special |