HPD05/05/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/10/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB08/16/1993V-DOB VIOLATION - ACTIVE
HPD04/15/1988SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC FIXTURE CEILING 4 STY APT 4R CENTER ROOM. , SECTION '' ''
HPD07/10/1987D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR SINK 4 STY APT 4R KITCHEN. , SECTION '' ''
HPD07/10/1987D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW 4 STY APT 4R 1ST ROOM FROM KITCHEN. , SECTION '' ''
ECB02/21/2020ROOF SYSTEM REMOVAL IN PROGRESS. UNSAFE USE OF MOTORIZED HOIST SYSTEM AT EXPOSURE#4 ROOF: NO SAFETY TIEBACK, ROPE AND COPPER STONE PIECES USED AS COUNTERWEIGHT. IMPROPER HARDWARE., DISCONTINUE USENothing owed — awaiting certificate of correction
ECB02/21/2020ROOFING SYSTEM REMOVAL IN PROGRESS. NO DOB PLANS PROVIDED ON TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; MAKE SITE SAFE. PROVIDED ROOF WATERPROOFING AS REQUIRED. CONTACT DOB.Nothing owed — awaiting certificate of correction