HPD05/05/2026(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
HPD06/10/2025(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
ECB02/21/2020Roofing system removal in progress. No DOB plans provided on time of inspection., provide approved /accepted construction documents; make site safe. Provided roof waterproofing as required. Contact DOB.Nothing owed — awaiting certificate of correction
ECB02/21/2020Roof system removal in progress. Unsafe use of motorized hoist system at exposure#4 roof: no safety tieback, rope and copper stone pieces used as counterweight. Improper hardware., discontinue useNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB06/30/2023Violation issued-failure to file 2020 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2025). This one is not shown as answered
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB09/02/2020Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2020; DOB's record still lists it as active