253 VAN PELT AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5176354
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
StructuralElectricalFire ProtectionGeneral
Roof1 filing · 3 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 1 filing · 20 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIDERALLC707/08/2026
PALERMO CONSTRUCTION CORP.1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR110/21/2025
C&P DESIGN CONSULTANTS301/27/2025
LOBUE & VALENZIANO, LLP412/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO BUE VALENZIANO AIA803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PALERMO CONSTRUCTION CORP.General Contractor403/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281110/21/2025
C&P DESIGN CONSULTANT8472401/27/2025
Building Lifecycle
All (61)Filed (8)Permit Issued (7)Signed Off (3)Inspection (16)Objection (2)Special Inspection (25)
10/27/2025
Permit issued — Solar
S01306073-I1-SL
10/21/2025
Filed — Alteration
S01306073-I1
01/31/2025
Signed off — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959940-I1
01/30/2025
Signed off — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-S1
01/27/2025
Filed — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959940-P2
01/27/2025
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/24/2025
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
01/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2024
Filed — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-P1
12/17/2024
Filed — Alteration
Installation of New Water Service with BFPA & Fire Sprinkler System
S00959940-P1
12/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/14/2024
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
11/26/2024
Signed off — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-S2
11/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2024
Permit issued — Curb Cut
S00971484-S2-CC
07/15/2024
Filed — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-S2
06/10/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/05/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/03/2024
Permit issued — Plumbing
S93751647-S1-PL
06/03/2024
Permit issued — Plumbing
S00959940-I1-EW-SP
06/03/2024
Permit issued — Plumbing
S00959940-I1-PL
05/28/2024
Permit issued — Plumbing
S00971484-S1-PL
04/19/2024
Filed — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-S1
04/02/2024
Permit issued — Structural
S00971484-I1-GC-CX
03/05/2024
Objection resolved — Addressed
01/22/2024
Objection raised — Scope
12/12/2023
Filed — New Building
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A DETACHED TWO FAMILY DWELLING.
S00971484-I1
12/04/2023
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
12/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Maintenance information
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/04/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/04/2023
Special inspection requirement — Final
Stanislav Pilipenko
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR10/27/2025
DOB NOWCurb CutSigned-offPALERMO CONSTRUCTION CORP07/24/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC06/03/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP06/03/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/03/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/28/2024
DOB NOWStructuralPermit IssuedPALERMO CONSTRUCTION CORP04/02/2024
1 project · most recent 12/17/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/17/2024Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 10/28/2025
General Wiring
FiledStatusContractorScope
10/28/2025CompleteISLAND ELECTRIC CORP—
11/20/2024CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 12/17/2024
Wood
FiledStatusContractorScope
12/17/2024Signed-offPALERMO CONSTRUCTION CORPWood
1 project · most recent 12/17/2024
Earthwork
FiledStatusContractorScope
12/17/2024Signed-offPALERMO CONSTRUCTION CORPEarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
01/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
01/27/2025Sprinkler SystemsStanislav Pilipenkospecial
01/27/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/24/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/24/2025Sprinkler SystemsStanislav Pilipenkospecial
12/14/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/14/2024Sprinkler SystemsStanislav Pilipenkospecial
12/04/2023Footing and FoundationStanislav Pilipenkoprogress
12/04/2023Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/04/2023Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/04/2023Structural Wood FrameStanislav Pilipenkoprogress
12/04/2023Air barrier — testing Stanislav Pilipenkoenergy_progress
12/04/2023Fenestration air leakageStanislav Pilipenkoenergy_progress
12/04/2023Fenestration areasStanislav Pilipenkoenergy_progress
12/04/2023Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
12/04/2023Insulation placement and R valuesStanislav Pilipenkoenergy_progress
12/04/2023Permanent certificateStanislav Pilipenkoenergy_progress
12/04/2023Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
12/04/2023HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
12/04/2023Interior lighting powerStanislav Pilipenkoenergy_progress
12/04/2023Maintenance informationStanislav Pilipenkoenergy_progress
12/04/2023Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/04/2023Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/04/2023Subgrade InspectionsStanislav Pilipenkospecial
12/04/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/04/2023FinalStanislav Pilipenkoprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026S00959940-I1Request digital key ↗
08/22/2026S00959940-P2Request digital key ↗
08/22/2026S00959940-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00971484-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00971484-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00971484-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026S00959940-I1Open ↗
08/22/2026S00959940-P1Open ↗
08/21/2026S00971484-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026S00959940-P1Open ↗
08/23/2026S00959940-P2Open ↗
08/23/2026S00959940-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S00971484-I1Open ↗
08/22/2026S00971484-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00971484-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00971484-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00971484-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00971484-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00971484-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01306073-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00971484-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00971484-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00971484-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00971484-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00971484-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00971484-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00971484-I1Open ↗