Office with commercial, 7-19 stories
253 WEST 35 STREET
MANHATTAN · BIN 1014423
💬 Discuss this project
1924Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
132,118 sfGross Floor Area
18Units
LL97 Covered10 Open Violations 7 unresolved · 3 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: BALBO REALTY LLC · 9,085 sf lot · 14.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof2p · 2 filings · 12 docs
Floor 151p · 1 filing · 8 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 91p · 1 filing · 8 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31p · 1 filing · 10 docs
Floor 22p · 2 filings · 15 docs
Floor 15p · 6 filings · 20 docs
Mezzanine4p · 4 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHULSKY PROPERTIES12007/08/2026
BALBOA REALTY7103/22/2026
NOVA CONSTRUCTION SERVICE103/22/2026
NOUSHA-TEX INC303/22/2026
PRIORITY HOME CARE INC303/22/2026
CUSHMAN & WAKEFIELD1003/21/2026
SKYLER 330203/21/2026
BALBO REALTY LLC C O SHULSKY PRO303/21/2026
MEMBER203/21/2026
SF ACQUISITIONS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VINCENT J. LIOTTA P.E.303/21/2026
ARCHETYPE CONSULTANTS2003/21/2026
AE DESIGN SOLUTION803/21/2026
CODE1003/21/2026
SIGNS CAD403/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
A1 EXPEDITING SERVICE403/21/2026
AEGIS BUILDING CONSULTANTS, INC203/21/2026
RIGHT WAY SERVICES NYC203/21/2026
VINCENT J. LIOTTA P. E.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor1107/08/2026
ZVI GELBElectrical403/21/2026
FINE FINISHES CONSTR. LLCGeneral Contractor407/08/2026
PERFECTAIRE CO INCGeneral Contractor307/08/2026
A.W. & S. CONSTRUCTION COGeneral Contractor307/08/2026
CC CONTROLLED PLBG CO.,INPlumbing207/08/2026
A + SPRINKLER CORPFire Protection207/08/2026
SIGNS CADScaffold207/08/2026
C C CONTROLLED COMBUSTIONGeneral Contractor203/21/2026
MAZZA, JOHNElectrical103/21/2026
MELVYN ZWEBNERElectrical103/21/2026
MGA ELECTRIC INCElectrical103/22/2026
PINNACLE ENVIRONMENTAL COElectrical103/21/2026
WALTON, MARCElectrical103/21/2026
WILFREDO MEDINAElectrical103/21/2026
ATHENS ELECTRIC INC.Electrical103/22/2026
YLL LOXHAJElectrical103/21/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
BAYSIDE CONTRACTING INCGeneral Contractor107/08/2026
DEANGELIS PLBG & HTG.INCPlumbing107/08/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
WILLIAMS, ANDREElectrical103/21/2026
CHAMBLIN, SULPICEElectrical103/21/2026
FORD, GUYElectrical103/21/2026
GUY FORDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100812/19/2024
HANSEN ENGINEERING PC81741006/26/2024
JOSE M. LANDAURO3500102/20/2023
VINCENT J. LIOTTA P. E.1974311/04/2021
W. ALLEN ENGINEERING PLLC664508/10/2021
BLUE SKY DESIGN, INC.1908106/18/2021
Building Lifecycle
All (205)Filed (37)Permit Issued (26)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (18)Special Inspection (30)
04/13/2026
Signed off — Alteration
Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.
M01063385-I1
12/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/11/2025
Signed off — Alteration
Architectural changes on the 1st floor and mezzanine as indicated on drawings.
M01063366-I1
09/10/2025
Signed off — Alteration
Plumbing changes on the 1st floor and mezzanine as indicated on drawings.
M01063380-I1
09/10/2025
Signed off — Alteration
Mechanical changes on the 1st floor and mezzanine as indicated on drawings.
M01063375-I1
05/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2025
Signed off — Alteration
ERECT AN ILLUMINATED ACCESSORY CABINET SIGN @WEST 35 STREET ELEVATION VIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (NEW YORK BLOOD CENTER)
M01116315-I1
03/07/2025
Signed off — Alteration
M01121540-I1
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-S1
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-S2
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-I1
12/19/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P5
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/04/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
11/01/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P4
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P2
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P1
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P3
10/31/2024
Permit issued — Sign
M01116315-I1-SG
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
10/31/2024
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
10/31/2024
Special inspection requirement — Final
Robert Germain Jr.
10/30/2024
Filed — Alteration
ERECT AN ILLUMINATED ACCESSORY CABINET SIGN @WEST 35 STREET ELEVATION VIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (NEW YORK BLOOD CENTER)
M01116315-I1
10/30/2024
Filed — Alteration
M01121540-I1
10/30/2024
Permit issued — Sign
M01121540-I1-SG
10/30/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/28/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/25/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/25/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
10/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2024
Special inspection requirement — Final
Ryan Hung
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Permit issued — Plumbing
M00965871-S1-PL
07/11/2024
Permit issued — Standpipe
M01063388-I1-EW-SD
07/11/2024
Permit issued — Sprinklers
M01063385-I1-EW-SP
06/28/2024
Permit issued — Mechanical Systems
M01063375-I1-MS
06/28/2024
Permit issued — General Construction
M01063366-I1-GC
06/28/2024
Permit issued — Plumbing
M01063380-I1-PL
06/26/2024
Filed — Alteration
Architectural changes on the 1st floor and mezzanine as indicated on drawings.
M01063366-I1
06/25/2024
Filed — Alteration
Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.
M01063385-I1
06/25/2024
Filed — Alteration
Plumbing changes on the 1st floor and mezzanine as indicated on drawings.
M01063380-I1
06/25/2024
Filed — Alteration
Mechanical changes on the 1st floor and mezzanine as indicated on drawings.
M01063375-I1
06/25/2024
Filed — Alteration
M01063388-I1
06/07/2024
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/07/2024
Special inspection requirement — Standpipe Systems
Ryan Hansen
06/07/2024
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/07/2024
Special inspection requirement — Sprinkler Systems
Ryan Hansen
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/29/2024
Filed — Alteration
Standpipe changes on the 1st floor as indicated on drawings.
M01015686-I1
05/28/2024
Filed — Alteration
M01015668-I1
05/28/2024
Filed — Alteration
M01015661-I1
05/28/2024
Filed — Alteration
M01015655-I1
05/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNS CAD CORP10/31/2024
DOB NOWSignSigned-offSIGNS CAD CORP10/30/2024
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN08/01/2024
DOB NOWStandpipePermit IssuedA + SPRINKLER CORP07/11/2024
DOB NOWSprinklersSigned-offA + SPRINKLER CORP07/11/2024
DOB NOWMechanical SystemsSigned-offA.W. & S. CONSTRUCTION CO06/28/2024
DOB NOWGeneral ConstructionSigned-offA.W. & S. CONSTRUCTION CO06/28/2024
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H06/28/2024
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN01/25/2024
DOB NOWGeneral ConstructionSigned-offC C CONTROLLED COMBUSTION01/25/2024
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION01/25/2024
DOB NOWGeneral ConstructionSigned-offNOVA CONSTRUCTION SERVICE06/09/2023
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE04/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE04/07/2023
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE04/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE04/05/2023
DOB NOWMechanical SystemsSigned-offPERFECTAIRE CO INC11/05/2021
DOB NOWMechanical SystemsSigned-offPERFECTAIRE CO INC08/27/2021
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC08/12/2021
DOB NOWMechanical SystemsSigned-offPERFECTAIRE CO INC07/13/2021
DOB NOWStructuralSigned-offFINE FINISHES CONSTR. LLC06/24/2021
DOB NOWPlumbingSigned-offDEANGELIS PLBG & HTG.INC06/04/2021
DOB NOWGeneral ConstructionSigned-offFINE FINISHES CONSTR. LLC05/27/2021
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE12/18/2020
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE10/15/2020
DOB NOWConstruction FencePermit IssuedBAYSIDE CONTRACTING INC04/19/2019
BISOTISSUEDNOVA CONSTRUCTION SERVICE01/05/2021
BISOTISSUEDNOVA CONSTRUCTION SERVICE10/22/2020
BISOTISSUEDBAYSIDE CONTRACTING INC05/20/2019
BISOTISSUEDBAYSIDE CONTRACTING INC05/20/2019
BISOTISSUEDBAYSIDE CONTRACTING INC08/03/2018
BISOTISSUEDBAYSIDE CONTRACTING INC08/03/2018
BISPLISSUEDDEANGELIS PLBG & HTG.INC03/19/2018
BISOTISSUEDCAULDWELL WINGATE CO LLC03/05/2018
BISOTISSUEDDB COLLABORATIVE LLC09/21/2015
BISOTISSUEDFINE FINISHES CONSTR. LLC03/17/2015
BISOTISSUEDFINE FINISHES CONSTR. LLC03/17/2015
BISMHISSUEDPERFECTAIRE CO INC04/29/2014
BISSPISSUEDDEEM PLUMBING INC10/23/2013
BISSPISSUEDDEEM PLUMBING INC10/23/2013
+ 31 more permits on file
1 project · most recent 05/29/2024
FiledStatusContractorScope
05/29/2024——1 outlets
7 projects · most recent 08/05/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
08/05/2025Permit IssuedMGA ELECTRIC INCGeneral Wiring
08/05/2025Permit IssuedMGA ELECTRIC INCGeneral Wiring
08/05/2025Permit IssuedMGA ELECTRIC INCHVAC Wiring
06/18/2025CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
11/20/2024CompleteZEREM ELECTRIC CORP.General Wiring
04/27/2021CompleteATHENS ELECTRIC INC.General Wiring
07/11/2018CompleteATHENS ELECTRIC INC.—
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/30/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/25/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
12/19/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/04/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
10/31/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
10/31/2024Chimneys and ventsRobert Germain Jr.special
10/31/2024FinalRobert Germain Jr.progress
10/21/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
09/24/2024FinalRyan Hungprogress
06/07/2024Sprinkler SystemsRyan Hansenspecial
06/07/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/07/2024Post-installed AnchorsRyan Hansenspecial
06/07/2024Standpipe SystemsRyan Hansenspecial
06/07/2024Post-installed AnchorsRyan Hansenspecial
06/07/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
05/28/2024HVAC-R and service water heating system controls—energy_progress
05/28/2024HVAC-R and service water heating equipment—energy_progress
03/14/2024Interior lighting powerRyan Hansenenergy_progress
03/14/2024HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
03/14/2024Lighting controlsRyan Hansenenergy_progress
03/06/2024Mechanical SystemsRyan Hansenspecial
03/06/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/06/2024Post-installed AnchorsRyan Hansenspecial
03/06/2024FinalRyan Hansenprogress
03/06/2024FinalRyan Hansenprogress
03/06/2024Standpipe SystemsRyan Hansenspecial
03/06/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
Latest 25 of 65.
▾Documents — 504 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch33
09/06/2026M00081879-I1Request digital key ↗
09/03/2026M00501182-I1Request digital key ↗
09/03/2026M00501182-P1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00407174-I1Request digital key ↗
08/15/2026M00407174-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00312968-I1Request digital key ↗
09/03/2026M00381897-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION36
10/04/2019123692110Open ↗
06/19/2019102611997Open ↗
11/23/2018123192525Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION21
10/22/2020123692110Open ↗
08/03/2018123203568Open ↗
08/03/2018123203568Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/31/2012120963948Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
10/22/2020123692110Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00816271-I1Open ↗
▸Seals & Professional Certifications160
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
10/04/2019123692110Open ↗
03/06/2018123342908Open ↗
03/06/2018123342908Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/06/2026M00081879-I1Open ↗
09/03/2026M00501217-I1Open ↗
09/03/2026M00501217-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M00501182-P1Open ↗
09/02/2026M00501182-P1Open ↗
09/02/2026M00501182-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M00965871-S2Open ↗
09/02/2026M01063380-I1Open ↗
09/02/2026M00501182-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
01/03/2018123203568Open ↗
01/03/2018123203568Open ↗
11/02/2017123342908Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
06/15/2012121113482Open ↗
06/15/2012121113482Open ↗
06/15/2012121113482Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/03/2018123203568Open ↗
01/03/2018123203568Open ↗
11/02/2017123342908Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment30
▸BISEQUIPMENT USE PERMITS8
09/30/2014121982257Open ↗
07/18/2013121113482Open ↗
07/18/2013121113482Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
05/08/2012120963948Open ↗
07/05/2011120566422Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
01/31/2012120963948Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT5
11/04/2014121982257Open ↗
07/18/2013121113482Open ↗
07/17/2013121113482Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
07/05/2011120566422Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
06/05/2013121123033Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/02/2017123342908Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
09/03/2026M00501217-I1Open ↗
09/03/2026M00501217-P1Open ↗
09/03/2026M00563967-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWCertificate of No Harassment5
08/25/2026M00965871-I1Open ↗
08/13/2026M01063366-I1Open ↗
08/13/2026M01015648-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos48
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/03/2026M00501217-P1Open ↗
09/03/2026M00501217-I1Open ↗
09/03/2026M00563967-I1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
10/04/2019123692110Open ↗
08/02/2018123203568Open ↗
01/24/2018123192525Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
01/31/2012120963948Open ↗
Showing 1 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
10/25/2019123692110Open ↗
10/04/2019123692110Open ↗
03/06/2018123342908Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
▸BISTR8: Energy Code Progress Inspections3
07/18/2013121113482Open ↗
01/31/2012120963948Open ↗
01/31/2012120963948Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00312968-I1Open ↗
08/13/2026M00620701-I1Open ↗
08/13/2026M00381897-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00381897-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
01/21/2021123203568Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
11/26/2021123692110Open ↗
01/25/2021123203568Open ↗
09/10/2018103456421Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTransit Authority Approval13
08/13/2026M01015648-I1Open ↗
08/13/2026M01015661-I1Open ↗
08/13/2026M01063380-I1Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/29/2012121123033Open ↗
06/15/2012121113482Open ↗
01/31/2012120963948Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/27/2026M01015668-I1Open ↗
08/13/2026M01015686-I1Open ↗
08/13/2026M01015648-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/04/2014121982257Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET22
10/04/2019123692110Open ↗
01/24/2018123192525Open ↗
01/03/2018123203568Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION8
09/08/2020123692110Open ↗
10/25/2019123692110Open ↗
10/23/2019123692110Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
06/19/2019102611997Open ↗
06/19/2019123342908Open ↗
11/23/2018123192525Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/04/2015122477033Open ↗