Office with commercial, 7-19 stories
253 WEST 35TH STREET
MANHATTAN · BIN 1014423
💬 Discuss this project
1924Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
132,118 sfGross Floor Area
18Units
LL97 Covered4 Active Violations 1 unresolved · 3 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Balbo Realty · 9,085 sf lot · 14.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsShulsky Properties INC.1 filing
RoofNew York Blood Center Donor Center2p · 3 filings · 18 docs
Floor 15Shulsky Properties INC.1p · 1 filing · 8 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Shulsky Properties INC.1p · 1 filing · 8 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Shulsky Properties INC.1p · 1 filing · 10 docs
Floor 2Shulsky Properties INC.1p · 1 filing · 7 docs
Floor 1New York Blood Center Donor Center, 34th Street Partnership5p · 16 filings · 20 docs
MezzanineNew York Blood Center Donor Center, 34th Street Partnership4p · 11 filings · 20 docs
Cellar34th Street Partnership5p · 4 filings · 20 docs
Site & exteriorNew York Blood Center Donor Center7 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shulsky Properties11907/08/2026
Balboa Realty7303/22/2026
Skyler 330203/21/2026
Member203/21/2026
SF Acquisitions203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Vincent J. Liotta P.E303/21/2026
Archetype Consultants2003/21/2026
AE Design Solution803/21/2026
Code1003/21/2026
Signs Cad403/21/2026
Socotec203/21/2026
A1 Expediting Service403/21/2026
Aegis Building Consultants203/21/2026
Right Way Services NYC203/21/2026
Vincent J. Liotta P. E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nova Construction ServiceScaffold1007/08/2026
Zerem ElectricElectrical403/21/2026
Fine Finishes ConstructionGeneral Contractor407/08/2026
Perfectaire CoGeneral Contractor307/08/2026
A.W. & S. Construction CoGeneral Contractor307/08/2026
A + SprinklerFire Protection207/08/2026
CC Controlled Plumbing CoPlumbing207/08/2026
C C Controlled CombustionGeneral Contractor203/21/2026
Signs CadSign hanger207/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Murray StanleyElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Medco ElectricElectrical103/21/2026
Amsterdam ElectricElectrical103/21/2026
Nova Construction ServiceGeneral Contractor107/08/2026
Bayside ContractingScaffold107/08/2026
Allstate SprinklerFire Protection107/08/2026
Deangelis Plumbing & HeatingPlumbing107/08/2026
Athens ElectricElectrical103/22/2026
William C. Gerakaris P&HPlumbing107/08/2026
PS&E Electric ContractorsElectrical103/21/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
A.S.M. Electric and MachElectrical103/21/2026
Mazza ElectricElectrical103/21/2026
Illuminous ElectricElectrical103/21/2026
Mga ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100812/19/2024
Hansen Engineering81741006/26/2024
Jose M. Landauro3500102/20/2023
Vincent J. Liotta P. E1974311/04/2021
W. Allen Engineering664508/10/2021
Blue SKY Design1908106/18/2021
Building Lifecycle
All (201)Filed (37)Permit Issued (26)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (14)Special Inspection (30)
04/13/2026
Signed off — Alteration
Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.
M01063385-I1
12/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/11/2025
Signed off — Alteration
Architectural changes on the 1st floor and mezzanine as indicated on drawings.
M01063366-I1
09/10/2025
Signed off — Alteration
Plumbing changes on the 1st floor and mezzanine as indicated on drawings.
M01063380-I1
09/10/2025
Signed off — Alteration
Mechanical changes on the 1st floor and mezzanine as indicated on drawings.
M01063375-I1
05/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/07/2025
Signed off — Alteration
ERECT AN ILLUMINATED ACCESSORY CABINET SIGN @WEST 35 STREET ELEVATION VIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (NEW YORK BLOOD CENTER)
M01116315-I1
03/07/2025
Signed off — Alteration
M01121540-I1
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-S1
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-S2
01/09/2025
Signed off — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-I1
12/19/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P5
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/04/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
11/01/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P4
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P1
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P2
10/31/2024
Filed — Alteration
NEW LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00965871-P3
10/31/2024
Permit issued — Sign
M01116315-I1-SG
10/31/2024
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
10/31/2024
Special inspection requirement — Final
Robert Germain Jr.
10/30/2024
Filed — Alteration
ERECT AN ILLUMINATED ACCESSORY CABINET SIGN @WEST 35 STREET ELEVATION VIEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. (NEW YORK BLOOD CENTER)
M01116315-I1
10/30/2024
Filed — Alteration
M01121540-I1
10/30/2024
Permit issued — Sign
M01121540-I1-SG
10/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/28/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/25/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/25/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
09/24/2024
Special inspection requirement — Final
Ryan Hung
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Permit issued — Plumbing
M00965871-S1-PL
07/11/2024
Permit issued — Sprinklers
M01063385-I1-EW-SP
07/11/2024
Permit issued — Standpipe
M01063388-I1-EW-SD
06/28/2024
Permit issued — General Construction
M01063366-I1-GC
06/28/2024
Permit issued — Plumbing
M01063380-I1-PL
06/28/2024
Permit issued — Mechanical Systems
M01063375-I1-MS
06/26/2024
Filed — Alteration
Architectural changes on the 1st floor and mezzanine as indicated on drawings.
M01063366-I1
06/25/2024
Filed — Alteration
Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.
M01063385-I1
06/25/2024
Filed — Alteration
Plumbing changes on the 1st floor and mezzanine as indicated on drawings.
M01063380-I1
06/25/2024
Filed — Alteration
Mechanical changes on the 1st floor and mezzanine as indicated on drawings.
M01063375-I1
06/25/2024
Filed — Alteration
M01063388-I1
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/07/2024
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/07/2024
Special inspection requirement — Sprinkler Systems
Ryan Hansen
06/07/2024
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/07/2024
Special inspection requirement — Standpipe Systems
Ryan Hansen
05/29/2024
Filed — Alteration
Standpipe changes on the 1st floor as indicated on drawings.
M01015686-I1
05/28/2024
Filed — Alteration
M01015655-I1
05/28/2024
Filed — Alteration
M01015668-I1
05/28/2024
Filed — Alteration
M01015661-I1
05/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
05/27/2024
Filed — Alteration
Architectural changes on the 1st floor and mezzanine as indicated on drawings.
M01015648-I1
03/14/2024
Special inspection requirement — Interior lighting power
Ryan Hansen
03/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSigns Cad10/31/2024
DOB NOWSignSigned-offSigns Cad10/30/2024
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co08/01/2024
DOB NOWSprinklersSigned-offA + Sprinkler07/11/2024
DOB NOWStandpipePermit IssuedA + Sprinkler07/11/2024
DOB NOWGeneral ConstructionSigned-offA.W. & S. Construction Co06/28/2024
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H06/28/2024
DOB NOWMechanical SystemsSigned-offA.W. & S. Construction Co06/28/2024
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion01/25/2024
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co01/25/2024
DOB NOWGeneral ConstructionSigned-offC C Controlled Combustion01/25/2024
DOB NOWGeneral ConstructionSigned-offNova Construction Service06/09/2023
DOB NOWSupported ScaffoldSigned-offNova Construction Service04/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service04/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service04/05/2023
DOB NOWSidewalk ShedSigned-offNova Construction Service04/05/2023
DOB NOWMechanical SystemsSigned-offPerfectaire Co11/05/2021
DOB NOWMechanical SystemsSigned-offPerfectaire Co08/27/2021
DOB NOWSprinklersSigned-offAllstate Sprinkler08/12/2021
DOB NOWMechanical SystemsSigned-offPerfectaire Co07/13/2021
DOB NOWStructuralSigned-offFine Finishes Construction06/24/2021
DOB NOWPlumbingSigned-offDeangelis Plumbing & Heating06/04/2021
DOB NOWGeneral ConstructionSigned-offFine Finishes Construction05/27/2021
DOB NOWSupported ScaffoldSigned-offNova Construction Service12/18/2020
DOB NOWSupported ScaffoldSigned-offNova Construction Service10/15/2020
DOB NOWConstruction FencePermit IssuedBayside Contracting04/19/2019
BISOTISSUEDNova Construction Service01/05/2021
BISOTISSUEDNova Construction Service10/22/2020
BISOTISSUEDBayside Contracting05/20/2019
BISOTISSUEDBayside Contracting05/20/2019
BISOTISSUEDBayside Contracting08/03/2018
BISOTISSUEDBayside Contracting08/03/2018
BISPLISSUEDDeangelis Plumbing & Heating03/19/2018
BISOTISSUEDCauldwell Wingate Co03/05/2018
BISOTISSUEDDB Collaborative09/21/2015
BISOTISSUEDFine Finishes Construction03/17/2015
BISOTISSUEDFine Finishes Construction03/17/2015
BISMHISSUEDPerfectaire Co04/29/2014
BISSPISSUEDDeem Plumbing10/23/2013
BISSPISSUEDDeem Plumbing10/23/2013
+ 31 more permits on file
1 project · most recent 05/29/2024
FiledStatusContractorScope
05/29/2024——1 outlets
7 projects · most recent 08/05/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
08/05/2025Permit IssuedMga ElectricGeneral Wiring
08/05/2025Permit IssuedMga ElectricGeneral Wiring
08/05/2025Permit IssuedMga ElectricHVAC Wiring
06/18/2025CompleteAmsterdam ElectricGeneral Wiring
11/20/2024CompleteZerem ElectricGeneral Wiring
04/27/2021CompleteAthens ElectricGeneral Wiring
07/11/2018CompleteAthens Electric—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/25/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
12/19/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/04/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
10/31/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
10/31/2024Chimneys and ventsRobert Germain Jr.special
10/31/2024FinalRobert Germain Jr.progress
10/21/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
09/24/2024FinalRyan Hungprogress
06/07/2024Sprinkler SystemsRyan Hansenspecial
06/07/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/07/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/07/2024Post-installed AnchorsRyan Hansenspecial
06/07/2024Standpipe SystemsRyan Hansenspecial
06/07/2024Post-installed AnchorsRyan Hansenspecial
05/28/2024HVAC-R and service water heating equipment—energy_progress
05/28/2024HVAC-R and service water heating system controls—energy_progress
03/14/2024Lighting controlsRyan Hansenenergy_progress
03/14/2024HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
03/14/2024Interior lighting powerRyan Hansenenergy_progress
03/06/2024Post-installed AnchorsRyan Hansenspecial
03/06/2024FinalRyan Hansenprogress
03/06/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/06/2024Mechanical SystemsRyan Hansenspecial
03/06/2024FinalRyan Hansenprogress
03/06/2024Standpipe SystemsRyan Hansenspecial
03/06/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
Latest 25 of 65.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York Blood Center Donor CenterMedical / HealthcareFloor 1, Mezzanine
Project M01116315 Alteration · LOC Issued · 10/30/2024
Project M01121540 Alteration · LOC Issued · 10/30/2024
Project M01063366 Alteration · LOC Issued · 06/26/2024
Project M01063375 Alteration · LOC Issued · 06/25/2024
Project M01063380 Alteration · LOC Issued · 06/25/2024
Project M01063385 Alteration · LOC Issued · 06/25/2024
Project M01063388 Alteration · Permit Entire · 06/25/2024
Project M01015686 Alteration · QA Failed · 05/29/2024
Project M01015655 Alteration · QA Failed · 05/28/2024
Project M01015661 Alteration · QA Failed · 05/28/2024
Project M01015668 Alteration · QA Failed · 05/28/2024
Project M01015648 Alteration · QA Failed · 05/27/2024
34th Street PartnershipOfficeCellar, Floor 1, Mezzanine
Project M00501244 Alteration · LOC Issued · 06/18/2021
Project M00501182 Alteration · LOC Issued · 04/23/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 504 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch33
09/06/2026M00081879-I1Request digital key ↗
09/03/2026M00501182-I1Request digital key ↗
09/03/2026M00501182-P1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00407174-I1Request digital key ↗
08/15/2026M00407174-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00312968-I1Request digital key ↗
09/03/2026M00381897-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION36
10/04/2019123692110Open ↗
06/19/2019102611997Open ↗
11/23/2018123192525Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION21
10/22/2020123692110Open ↗
08/03/2018123203568Open ↗
08/03/2018123203568Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/31/2012120963948Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
10/22/2020123692110Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00816271-I1Open ↗
▸Seals & Professional Certifications160
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
10/04/2019123692110Open ↗
03/06/2018123342908Open ↗
03/06/2018123342908Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/06/2026M00081879-I1Open ↗
09/03/2026M00501217-I1Open ↗
09/03/2026M00501217-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M00501182-P1Open ↗
09/02/2026M00501182-P1Open ↗
09/02/2026M00501182-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M00965871-S2Open ↗
09/02/2026M01063380-I1Open ↗
09/02/2026M00501182-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
01/03/2018123203568Open ↗
01/03/2018123203568Open ↗
11/02/2017123342908Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
06/15/2012121113482Open ↗
06/15/2012121113482Open ↗
06/15/2012121113482Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/03/2018123203568Open ↗
01/03/2018123203568Open ↗
11/02/2017123342908Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment30
▸BISEQUIPMENT USE PERMITS8
09/30/2014121982257Open ↗
07/18/2013121113482Open ↗
07/18/2013121113482Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
05/08/2012120963948Open ↗
07/05/2011120566422Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
01/31/2012120963948Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT5
11/04/2014121982257Open ↗
07/18/2013121113482Open ↗
07/17/2013121113482Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
07/05/2011120566422Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
06/05/2013121123033Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/02/2017123342908Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
09/03/2026M00501217-P1Open ↗
09/03/2026M00501217-I1Open ↗
09/03/2026M00563967-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWCertificate of No Harassment5
08/25/2026M00965871-I1Open ↗
08/13/2026M01063366-I1Open ↗
08/13/2026M01015648-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos48
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/03/2026M00501217-P1Open ↗
09/03/2026M00501217-I1Open ↗
09/03/2026M00563967-I1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
10/04/2019123692110Open ↗
08/02/2018123203568Open ↗
01/24/2018123192525Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
01/31/2012120963948Open ↗
Showing 1 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
10/25/2019123692110Open ↗
10/04/2019123692110Open ↗
03/06/2018123342908Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
▸BISTR8: Energy Code Progress Inspections3
07/18/2013121113482Open ↗
01/31/2012120963948Open ↗
01/31/2012120963948Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00312968-I1Open ↗
08/13/2026M00620701-I1Open ↗
08/13/2026M00381897-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00381897-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
01/21/2021123203568Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
11/26/2021123692110Open ↗
01/25/2021123203568Open ↗
09/10/2018103456421Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTransit Authority Approval13
08/13/2026M01015648-I1Open ↗
08/13/2026M01015655-I1Open ↗
08/13/2026M01063366-I1Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/29/2012121123033Open ↗
06/15/2012121113482Open ↗
01/31/2012120963948Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/27/2026M01015668-I1Open ↗
08/13/2026M01015648-I1Open ↗
08/13/2026M01015686-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/04/2014121982257Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
11/22/2021123692110Open ↗
01/25/2021123203568Open ↗
09/16/2020123203568Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET22
10/04/2019123692110Open ↗
01/24/2018123192525Open ↗
01/03/2018123203568Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION8
09/08/2020123692110Open ↗
10/25/2019123692110Open ↗
10/23/2019123692110Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
06/19/2019102611997Open ↗
06/19/2019123342908Open ↗
11/23/2018123192525Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/04/2015122477033Open ↗