← Back
BuildNYC
Elevator apt, fireproof with stores
West Pierre
253 WEST 72ND STREET · BIN 1030507
💬 Discuss this project
1926Year Built
22Stories
D6Building Class
C4-6AZoning
218,851 sfGross Floor Area
265Units
LL97 CoveredRent Stabilized6 Active Violations 2 unresolved · 4 paperwork only 3 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: West Pierre Associates · 12,975 sf lot · 16.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSephoraUnder Construction5p · 2 filings · 20 docs
Floor 9Unit 9103p · 1 filing · 16 docs
Floor 8Unit 801, Unit 8109p · 2 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorBright HorizonsUnder Construction20p · 5 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West Pierre Associates8103/22/2026
West Pierre Associates Urban Associates403/21/2026
South Pierre Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design103/25/2026
Guardia Architects703/23/2026
George J. Xerakias, PE407/24/2025
Seth P. Roye Architect204/29/2024
Ashraf109/20/2023
Sean P. Cunningham PE105/09/2022
Salvator A. Caradonna JR106/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Wide Expediting1203/21/2026
HS Design Studio803/21/2026
All in Permit Consultants103/21/2026
Rigid Structural Design103/21/2026
SKY Management Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold1109/09/2026
KNS Building RestorationGeneral Contractor710/09/2026
Eon RenovationsGeneral Contractor504/09/2026
Sterling ElectricElectrical303/21/2026
USA Elect'l ServicesElectrical203/21/2026
Rosenwach Tank CoGeneral Contractor203/21/2026
T.N.T. Plumbing & HeatingPlumbing107/08/2026
Signs CadSign hanger107/08/2026
Freedom Electl & DataElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Guardia Architect7188603/23/2026
Sag Engineering & Consulting608104/29/2024
Seth P Roye Architect8554204/29/2024
AK Consulting Services, I6198106/30/2023
Building Lifecycle
All (139)Filed (17)Permit Issued (21)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (2)Objection (1)Special Inspection (21)
10/07/2026
Permit issued — General Construction
M00973212-I1-GC
09/08/2026
Permit issued — Sidewalk Shed
M00934092-I1-SH
07/27/2026
Signed off — Alteration
MINOR RENOVATION TO APARTMENT 801 TO INCLUDE RELOCATING KITCHEN VENT AS PER PLANS.
M01367427-I1
07/16/2026
Permit issued — General Construction
M00973212-I1-GC
04/20/2026
Violation issued (ECB, open)
Local Law
04/08/2026
Signed off — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 810 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01155551-I1
04/02/2026
Permit issued — General Construction
M00973212-I1-GC
03/30/2026
Permit issued — General Construction
M01367427-I1-GC-CX
03/25/2026
Filed — Alteration
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01369342-I1
03/25/2026
Permit issued — Supported Scaffold
M01369342-I1-SF
03/23/2026
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 910 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01237896-P1
03/12/2026
Filed — Alteration
MINOR RENOVATION TO APARTMENT 801 TO INCLUDE RELOCATING KITCHEN VENT AS PER PLANS.
M01367427-I1
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sergio Guardia
03/04/2026
Special inspection requirement — Final
Sergio Guardia
03/04/2026
Special inspection requirement — Mechanical Systems
Sergio Guardia
01/28/2026
Permit issued — General Construction
M00973212-I1-GC
01/28/2026
Permit issued — Suspended Scaffold
M01020182-I1-SC
12/16/2025
Signed off — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 810 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01155551-S1
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sergio Guardia
09/12/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2025
Permit issued — Sidewalk Shed
M00934092-I1-SH
08/06/2025
Permit issued — General Construction
M01237896-I1-GC
07/29/2025
Objection raised — Admin
07/24/2025
Filed — Alteration
ADDING SUSPENDED SCAFFOLD DETAILS AND ENGINEER CALCULATIONS.
M01020182-P3
07/11/2025
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 910 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01237896-S1
07/11/2025
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 910 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01237896-I1
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sergio Guardia
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sergio Guardia
06/07/2025
Special inspection requirement — Final
Sergio Guardia
05/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2025
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 810 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01155551-P1
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sergio Guardia
04/22/2025
Permit issued — Plumbing
M01155551-S1-PL
03/14/2025
Permit issued — Suspended Scaffold
M01020182-I1-SC
03/14/2025
Permit issued — General Construction
M00973212-I1-GC
01/29/2025
Permit issued — General Construction
M01155551-I1-GC
01/22/2025
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 810 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01155551-S1
01/17/2025
Filed — Alteration
PLUMBING MODIFICATION TO FIXTURES IN APT 810 AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01155551-I1
01/03/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
12/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sergio Guardia
12/18/2024
Filed — Alteration
ADDING SUSPENDED SCAFFOLD DETAILS AND ENGINEER CALCULATIONS.
M01020182-P2
12/13/2024
Special inspection requirement — Final
Sergio Guardia
11/19/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
10/29/2024
Violation issued (ECB, closed)
Construction
10/29/2024
Violation issued (ECB, closed)
Construction
10/29/2024
Violation issued (ECB, closed)
Construction
09/25/2024
Permit issued — General Construction
M00973212-I1-GC
09/16/2024
Permit issued — Sidewalk Shed
M00934092-I1-SH
07/18/2024
Filed — Alteration
ADDING SUSPENDED SCAFFOLD DETAILS AND ENGINEER CALCULATIONS.
M01020182-P1
07/18/2024
Permit issued — Suspended Scaffold
M01020182-I1-SC
04/29/2024
Filed — Alteration
M00973212-I1
04/10/2024
Permit issued — Suspended Scaffold
M01020182-I1-SC
03/29/2024
Filed — Alteration
ADDING SUSPENDED SCAFFOLD DETAILS AND ENGINEER CALCULATIONS.
M01020182-I1
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2023
Violation issued (ECB, open)
Construction
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2023
Permit issued — Sidewalk Shed
M00934092-I1-SH
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKNS Building Restoration10/07/2026
DOB NOWSidewalk ShedPermit IssuedCeprine Construction09/08/2026
DOB NOWGeneral ConstructionPermit IssuedKNS Building Restoration07/16/2026
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest04/02/2026
DOB NOWGeneral ConstructionSigned-offEon Renovations03/30/2026
DOB NOWSupported ScaffoldPermit IssuedCeprine Construction03/25/2026
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest01/28/2026
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration01/28/2026
DOB NOWSidewalk ShedPermit IssuedCeprine Construction09/11/2025
DOB NOWGeneral ConstructionPermit IssuedEon Renovations08/06/2025
DOB NOWPlumbingSigned-offT.N.T. Plumbing & Heating04/22/2025
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration03/14/2025
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest03/14/2025
DOB NOWGeneral ConstructionSigned-offEon Renovations01/29/2025
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest09/25/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction09/16/2024
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration07/18/2024
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration04/10/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction09/21/2023
DOB NOWGeneral ConstructionSigned-offRosenwach Tank Co05/18/2022
DOB NOWSignSigned-offSigns Cad06/18/2019
BISPLISSUEDA&H Express Plumbing & Heating06/10/2025
BISPLISSUEDA&H Express Plumbing & Heating06/10/2025
BISPLISSUEDCC Controlled Plumbing Co11/05/2020
BISOTISSUEDAntis Contracting10/30/2020
BISOTISSUEDAntis Contracting06/10/2020
BISOTISSUEDAntis Contracting06/10/2020
BISOTISSUEDKNS Building Restoration10/18/2019
BISOTISSUEDAntis Contracting06/17/2019
BISPLISSUEDG.P. Mechanical06/11/2019
BISMHISSUEDAntis Contracting05/08/2019
BISPLISSUEDG.P. Mechanical03/27/2019
BISOTISSUEDNew York Engineering Associates03/22/2019
BISOTISSUEDKNS Building Restoration03/15/2019
BISOTISSUEDAntis Contracting02/15/2019
BISOTISSUEDAntis Contracting01/25/2019
BISEQISSUEDNew York Ladder & Scaffold08/13/2018
BISFBISSUEDC C Controlled Combustion07/27/2018
BISOTISSUEDAntis Contracting05/10/2018
BISOTISSUEDKNS Building Restoration03/20/2018
+ 31 more permits on file
1 project · most recent 03/12/2026
Others
FiledStatusContractorScope
03/12/2026Signed-offEon RenovationsOthers
1 project · most recent 03/23/2026
Water/Sanitary
FiledStatusContractorScope
03/23/2026——Water/Sanitary
14 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026Permit IssuedHigh Quality Electric of NYC—
06/19/2026CompleteA & S Master ElectricalGeneral Wiring
06/04/2026CompleteDelco ElectricalGeneral Wiring
04/29/2026CompleteDelco ElectricalGeneral Wiring
04/29/2026Permit IssuedDelco ElectricalGeneral Wiring
12/05/2025CompleteFreedom Electric & DataGeneral Wiring
09/29/2025CompleteA & S Master ElectricalGeneral Wiring
02/11/2025Permit IssuedTriple Crown ElectricGeneral Wiring
12/02/2024CompleteFreedom Electric & DataGeneral Wiring
10/29/2024CompleteLive Wire Electric 1General Wiring
10/05/2023Permit IssuedBorowide Elect'l Contractors—
12/09/2022CompleteLive Wire Electric 1General Wiring
10/29/2019CompleteAll Purpose ElectricGeneral Wiring
02/08/2019Permit IssuedGMC ElectricalGeneral Wiring
2 projects · most recent 03/25/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/25/2026Permit IssuedCeprine ConstructionScaffold
09/20/2023Permit IssuedCeprine ConstructionSidewalk Shed
1 project · most recent 07/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2025Permit IssuedKNS Building RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/04/2026Fire-Resistant Penetrations and JointsSergio Guardiaspecial
03/04/2026FinalSergio Guardiaprogress
03/04/2026Mechanical SystemsSergio Guardiaspecial
11/25/2025Tenant Protection Plan Compliance—special
11/25/2025Fire-Resistant Penetrations and JointsSergio Guardiaspecial
06/18/2025Tenant Protection Plan ComplianceSergio Guardiaspecial
06/17/2025Fire-Resistant Penetrations and JointsSergio Guardiaspecial
06/07/2025FinalSergio Guardiaprogress
05/21/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/12/2025Tenant Protection Plan ComplianceSergio Guardiaspecial
01/03/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
12/23/2024Tenant Protection Plan ComplianceSergio Guardiaspecial
12/13/2024FinalSergio Guardiaprogress
11/19/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
03/09/2023Energy Code Compliance InspectionsSeth Royeprogress
03/09/2023MasonrySeth Royespecial
03/09/2023Fire-Resistant Penetrations and JointsSeth Royespecial
03/09/2023FinalSeth Royeprogress
03/09/2023Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
05/06/2022FinalSEAN CUNNINGHAMprogress
05/28/2019FinalSALVATOR CARADONNAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SephoraRetailRoof
Project M00733454 Alteration · LOC Issued · 05/09/2022
Bright HorizonsEducationFloor 1
Project M00172690 Alteration · LOC Issued · 06/14/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 809 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/02/2026M00733454-I1Request digital key ↗
08/30/2026M00841694-I1Request digital key ↗
08/29/2026M00934092-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00172690-I1Request digital key ↗
▸Applications & Permits163
▸BISPLAN / WORK APPROVAL APPLICATION94
12/01/2025122895661Open ↗
06/10/2025123185739Open ↗
06/10/2025122738715Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION57
06/10/2025140827657Open ↗
06/10/2025123185748Open ↗
10/18/2019123101632Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWLPC Approval/Permit10
09/02/2026M00733454-I1Open ↗
08/13/2026M01237896-S1Open ↗
08/13/2026M01155551-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications151
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
03/12/2020123025966Open ↗
03/12/2020123025966Open ↗
02/12/2020100233702Open ↗
Showing 3 of 55 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT26
06/12/2019123687386Open ↗
03/15/2019123704376Open ↗
02/25/2019140834168Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
06/12/2019123687386Open ↗
03/15/2019123704376Open ↗
Showing 2 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00172690-I1Open ↗
09/02/2026M00733454-I1Open ↗
08/30/2026M00841694-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/18/2026M01155551-I1Open ↗
09/17/2026M01155551-S1Open ↗
09/01/2026M01237896-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/18/2026M01155551-I1Open ↗
09/14/2026M00733454-I1Open ↗
09/01/2026M01237896-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/25/2019140834168Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment44
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
06/13/2019123591504Open ↗
06/05/2019123591504Open ↗
04/04/2019140827657Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION3
11/23/2021123149280Open ↗
11/23/2021123177034Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
03/05/2025123185748Open ↗
Showing 1 of 2 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL2
10/17/2025123149280Open ↗
11/30/2021123177034Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection26
▸BISTenant Protection Plan and Notes24
06/17/2019123687386Open ↗
03/15/2019123704376Open ↗
03/10/2021101672619Open ↗
Showing 3 of 24 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos36
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
06/12/2019123687386Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00172690-I1Open ↗
09/02/2026M00733454-I1Open ↗
08/30/2026M00841694-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
10/18/2019123101632Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance60
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
03/12/2020123025966Open ↗
03/12/2020123025966Open ↗
11/25/2019123101632Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
11/30/2021123177034Open ↗
10/04/2021123185748Open ↗
04/07/2021123212497Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/05/2025123149280Open ↗
04/30/2025123149280Open ↗
04/07/2021123212497Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/04/2025123185739Open ↗
04/30/2025123149280Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY27
09/05/2025123149280Open ↗
09/04/2025123185739Open ↗
09/04/2025123185739Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL INSPECTION1
03/21/2025123149280Open ↗
▸BISMECHANICAL SYSTEMS1
04/04/2022122948310Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/04/2022122948310Open ↗
▸Approvals, Objections & Sign-offs109
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
09/18/2025123185748Open ↗
09/05/2025123185739Open ↗
06/25/2025140827657Open ↗
Showing 3 of 47 on file for this type
▸BISLANDMARKS APPROVAL29
03/12/2020123025966Open ↗
11/25/2019123101632Open ↗
06/12/2019123687386Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
12/01/2025122895661Open ↗
04/07/2021123212497Open ↗
07/24/2020100233702Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
05/17/2022122993957Open ↗
Showing 1 of 9 on file for this type
▸BISLANDMARKS SIGNOFF5
09/05/2025123185739Open ↗
11/16/2023123687386Open ↗
07/25/2023123185748Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
06/10/2025123185748Open ↗
06/10/2025140827657Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
04/04/2022122948310Open ↗
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT41
11/18/2021123185748Open ↗
04/07/2021123212497Open ↗
11/20/2020140827657Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
06/10/2025123185739Open ↗
06/10/2025122738715Open ↗
04/28/2025123149280Open ↗
Showing 3 of 6 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED3
05/21/2025122993957Open ↗
12/05/2024122993957Open ↗
05/20/2024122993957Open ↗
▸Filing & Intake Forms102
▸BISBOROUGH INTAKE FORM45
06/10/2025123185748Open ↗
06/10/2025140827657Open ↗
05/01/2020122993957Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET29
06/12/2019123687386Open ↗
03/15/2019123704376Open ↗
Showing 2 of 29 on file for this type
▸BISADDITIONAL INFORMATION24
03/21/2025123185748Open ↗
06/29/2022122993957Open ↗
06/13/2019123591504Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
04/07/2021123212497Open ↗
12/12/2019123704376Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWManufacturer's Specifications4
08/13/2026M01020182-P3Open ↗
08/13/2026M01020182-P1Open ↗
08/13/2026M01020182-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01020182-P3Open ↗
08/13/2026M01020182-P2Open ↗
08/13/2026M01020182-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M01237896-I1Open ↗
08/13/2026M01155551-I1Open ↗
08/13/2026M01367427-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/11/2022122685219Open ↗
02/16/2021101672619Open ↗