← Back
Condo, commercial tower (mixed-use) [derived]
Dollar Savings Bank
2530 GRAND CONCOURSE · BIN 2096820
💬 Discuss this project
1938Year Built
10Stories
RCBuilding Class
C4-4Zoning
87,955 sfGross Floor Area
3Units
LL97 Covered11 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · 20,000 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 5 filings · 20 docs
Floor 1130p · 1 filing · 20 docs
Floor 10Under Construction34p · 2 filings · 20 docs
Floor 9Under Construction34p · 2 filings · 20 docs
Floor 8Under Construction34p · 2 filings · 20 docs
Floor 7Under Construction34p · 2 filings · 20 docs
Floor 6Under Construction138p · 3 filings · 20 docs
Floor 5Under Construction135p · 3 filings · 20 docs
Floor 4Under Construction134p · 3 filings · 20 docs
Floor 3Under Construction146p · 5 filings · 20 docs
Floor 2Under Construction142p · 5 filings · 20 docs
Floor 1Under Construction126p · 4 filings · 20 docs
Mezzanine109p · 2 filings · 20 docs
CellarUnder Construction124p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YYY 62ND STREET8908/30/2026
GDI CONSTRUCTION203/22/2026
ROCK GROUP NY303/22/2026
TOWER CONDOMINIUM ASSOC303/22/2026
JEFFERSON REALTY ASSOC1503/22/2026
ROCK GROUP NY GROUP103/22/2026
EMIGRANT SAVINGS BANK103/22/2026
OWNER OF 2530 GRAND CONCO103/22/2026
KENNETH BYRNS 1ST FACILIT103/22/2026
IMIGRANT BANK103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4003/21/2026
RIGGING CONSULTANTS203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
HS DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GDI CONSTRUCTION LLCGeneral Contractor1208/30/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor507/08/2026
SUPERSTARS CONTRACTING I*General Contractor407/08/2026
HIMALAYA TOWERSGeneral Contractor407/08/2026
KWONG MING ELECTRIC INCElectrical303/22/2026
HF GROUP PLMBG & SPNKLERFire Protection307/08/2026
WHITESTONE PLUMBING CORPPlumbing207/08/2026
WHITESTONE PLUMBING CORPFire Protection207/08/2026
HD HVAC OF NY INCGeneral Contractor204/09/2026
SMART PLBG & HTG CORPPlumbing106/28/2026
RAPPO, FRANKElectrical103/21/2026
CEESAY, BELALElectrical103/21/2026
DOUGLAS LIMONGELLIElectrical103/21/2026
GENOVESE, JOSEPHElectrical103/21/2026
GMD SHIPYARD CORPElectrical103/21/2026
HOWARD ZAMKOFFElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
LIMONGELLI ELECTRIC CORPElectrical103/22/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES97311007/16/2026
VIBRANALYSIS INC., DBA VT68642003/18/2026
KADAN CORP.5956102/06/2024
MAYTA + SEBASTIAN ARCHITE5890202/06/2024
Building Lifecycle
All (293)Filed (34)Permit Issued (30)Signed Off (14)Facade (FISP) (15)Violation (60)Inspection (34)Objection (76)Special Inspection (30)
08/27/2026
Permit issued — General Construction
X00657984-I1-GC
08/25/2026
Signed off — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-S4
08/24/2026
Signed off — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-S5
08/07/2026
Signed off — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-S3
08/07/2026
Signed off — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-I1
08/07/2026
Signed off — Alteration
Temporary Sprinkler modification and installation
X01219992-I1
07/16/2026
Filed — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-P5
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
05/14/2026
Permit issued — General Construction
X01127809-S4-GC
04/27/2026
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
04/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/15/2026
Objection raised — Cost
04/15/2026
Objection resolved — Addressed
04/01/2026
Filed — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-P4
04/01/2026
Objection raised — Cost
03/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
03/31/2026
Special inspection requirement — Maintenance information
JUAN GOMEZ
03/31/2026
Special inspection requirement — Exterior lighting power
JUAN GOMEZ
03/31/2026
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
03/31/2026
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
03/31/2026
Special inspection requirement — Vestibules
JUAN GOMEZ
03/31/2026
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
03/31/2026
Special inspection requirement — Lighting controls
JUAN GOMEZ
03/31/2026
Special inspection requirement — Interior lighting power
JUAN GOMEZ
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
03/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
03/31/2026
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
03/31/2026
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
03/20/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2026
Filed — Alteration CO
Interior renovation and conversion of existing class I-B office building into 1968 BC class I-B community facility building located in 10 story building.
X00657984-P6
03/18/2026
Filed — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-P3
03/13/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
03/13/2026
Special inspection requirement — Standpipe Systems
EDWIN HOPKINS
02/11/2026
Permit issued — Structural
X01127809-S5-ST
01/22/2026
Violation issued (ECB, closed)
Site Safety
01/06/2026
Permit issued — Mechanical Systems
X01127809-I1-MS
01/05/2026
Cycle 10 facade report signed — SAFE
12/22/2025
Filed — Alteration
NEW SANITARY WASTE AND VENT SYSTEM FOR ALL PLUMBING FIXTURES. PROVIDE NEW STORM DRAINS AND LEADER SYSTEM. PROVIDE NEW NATURAL GAS SYSTEMS AS REQUIRED. COMBINED SEWER IS EXISTING. PROVIDE NEW 4 INCHES DOMESTIC WATER SERVICE AND BACKFLOW PREVENTION
X01127809-S5
12/22/2025
Special inspection requirement — Structural Cold-Formed Steel
EDWIN HOPKINS
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWIN HOPKINS
12/19/2025
Special inspection requirement — Structural Steel - Details
EDWIN HOPKINS
12/19/2025
Special inspection requirement — Post-installed Anchors
EDWIN HOPKINS
12/19/2025
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
12/19/2025
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
12/18/2025
Special inspection requirement — Final
EDWIN HOPKINS
12/04/2025
Objection resolved — Addressed
11/24/2025
Cycle 10 facade report submitted
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/07/2025
Cycle 10 facade inspection completed
10/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2025
Permit issued — Suspended Scaffold
X01302047-I1-SC
10/16/2025
Objection raised — Zoning
10/16/2025
Objection raised — Zoning
10/16/2025
Objection raised — Fire_Protection
10/14/2025
Filed — Alteration CO
Interior renovation and conversion of existing class I-B office building into 1968 BC class I-B community facility building located in 10 story building.
X00657984-P5
Latest 60 of 293 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGDI CONSTRUCTION LLC08/27/2026
DOB NOWGeneral ConstructionSigned-offGDI CONSTRUCTION LLC05/14/2026
DOB NOWStructuralSigned-offGDI CONSTRUCTION LLC02/11/2026
DOB NOWMechanical SystemsSigned-offHD HVAC OF NY INC01/06/2026
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT10/17/2025
DOB NOWGeneral ConstructionPermit IssuedGDI CONSTRUCTION LLC09/15/2025
DOB NOWMechanical SystemsSigned-offHD HVAC OF NY INC07/08/2025
DOB NOWSprinklersSigned-offHF GROUP PLMBG & SPNKLER07/01/2025
DOB NOWStandpipeSigned-offHF GROUP PLMBG & SPNKLER07/01/2025
DOB NOWStandpipePermit IssuedHF GROUP PLMBG & SPNKLER07/01/2025
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP07/01/2025
DOB NOWGeneral ConstructionSigned-offSUPERSTARS CONTRACTING I*09/24/2024
DOB NOWGeneral ConstructionPermit IssuedGDI CONSTRUCTION LLC09/20/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/10/2024
DOB NOWSuspended ScaffoldSigned-offSUPERSTARS CONTRACTING IN08/29/2024
DOB NOWMechanical SystemsSigned-offGDI CONSTRUCTION LLC03/11/2024
DOB NOWStructuralSigned-offGDI CONSTRUCTION LLC10/31/2023
DOB NOWGeneral ConstructionPermit IssuedGDI CONSTRUCTION LLC10/12/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/13/2023
DOB NOWStandpipeSigned-offTEMPERINI MECHANICAL INC08/29/2023
DOB NOWPlumbingSigned-offWHITESTONE PLUMBING CORP07/17/2023
DOB NOWGeneral ConstructionSigned-offSUPERSTARS CONTRACTING I*06/09/2023
DOB NOWFoundationPermit IssuedGDI CONSTRUCTION LLC05/26/2023
DOB NOWMechanical SystemsSigned-offGDI CONSTRUCTION LLC03/17/2023
DOB NOWAntennaSigned-offHIMALAYA TOWERS01/19/2023
DOB NOWSprinklersSigned-offWHITESTONE PLUMBING CORP11/09/2022
DOB NOWPlumbingSigned-offTEMPERINI MECHANICAL INC11/09/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/23/2022
DOB NOWGeneral ConstructionPermit IssuedGDI CONSTRUCTION LLC09/20/2022
DOB NOWAntennaSigned-offHIMALAYA TOWERS06/07/2022
BISEQISSUEDROCK GROUP NY CORP05/01/2017
BISEQISSUEDROCK GROUP NY CORP04/13/2016
BISEQISSUEDROCK GROUP NY CORP04/01/2015
BISEQISSUEDROCK GROUP NY CORP01/27/2014
BISEQISSUEDCS BRIDGE CORP03/28/2013
BISEQISSUEDCS BRIDGE CORP03/23/2012
BISOTISSUEDTRES CONSTRUCTION LLC01/09/2012
BISEQISSUEDCS BRIDGE CORP04/26/2011
BISOTISSUEDTRES CONSTRUCTION LLC03/03/2011
BISEQISSUEDCS BRIDGE CORP04/20/2010
+ 20 more permits on file
2 projects · most recent 07/16/2026
Sprinkler System
FiledStatusContractorScope
07/16/2026Signed-offHF GROUP PLMBG & SPNKLERSprinkler System
05/07/2025Permit IssuedHF GROUP PLMBG & SPNKLER1 outlets
1 project · most recent 07/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/16/2026Permit IssuedHF GROUP PLMBG & SPNKLERGas, Water/Sanitary
9 projects · most recent 06/08/2026
General Wiring
FiledStatusContractorScope
06/08/2026CompleteLIMONGELLI ELECTRIC CORPGeneral Wiring
05/02/2024CompleteA&E ELECTRICAL SYSTEMS COGeneral Wiring
11/29/2023Permit IssuedKWONG MING ELECTRIC INC—
01/10/2023CancelledJ.A. LEE ELEC SVCS LLCGeneral Wiring
11/02/2022Permit IssuedKWONG MING ELECTRIC INC—
11/02/2022CompleteKWONG MING ELECTRIC INC—
11/02/2022Permit IssuedKWONG MING ELECTRIC INC—
09/23/2022CompleteKWONG MING ELECTRIC INC—
09/22/2022CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 07/16/2026
Steel Concrete
FiledStatusContractorScope
07/16/2026Signed-offGDI CONSTRUCTION LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 34
DateTypeResultReport
04/27/2026Pass-Final SD - More than 10 Requested FloorsPassView ↗
04/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/07/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/01/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/02/2023Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
10/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 34.
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
07/10/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
07/10/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
03/31/2026Sprayed fire-resistant materialsJUAN GOMEZspecial
03/31/2026Fire-Resistance Rated ConstructionJUAN GOMEZprogress
03/31/2026Energy Code Compliance InspectionsJUAN GOMEZprogress
03/31/2026VestibulesJUAN GOMEZenergy_progress
03/31/2026Lighting controlsJUAN GOMEZenergy_progress
03/31/2026Air barrier - visual inspectionJUAN GOMEZenergy_progress
03/31/2026Exterior lighting powerJUAN GOMEZenergy_progress
03/31/2026Interior lighting powerJUAN GOMEZenergy_progress
03/31/2026Insulation placement and R valuesJUAN GOMEZenergy_progress
03/31/2026Fenestration air leakageJUAN GOMEZenergy_progress
03/31/2026Electrical motors and elevatorsJUAN GOMEZenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
03/31/2026Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
03/31/2026Maintenance informationJUAN GOMEZenergy_progress
03/13/2026Standpipe SystemsEDWIN HOPKINSspecial
03/13/2026Sprinkler SystemsEDWIN HOPKINSspecial
12/22/2025Structural Stability – Alterations of existing buildingsEDWIN HOPKINSspecial
12/22/2025Structural Cold-Formed SteelEDWIN HOPKINSspecial
12/19/2025Structural Steel - DetailsEDWIN HOPKINSspecial
12/19/2025Structural Steel - WeldingEDWIN HOPKINSspecial
12/19/2025Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
12/19/2025Post-installed AnchorsEDWIN HOPKINSspecial
12/18/2025FinalEDWIN HOPKINSprogress
Latest 25 of 111.
▾Documents — 342 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/24/2026X00701173-I1Request digital key ↗
08/23/2026X08002852-P1Request digital key ↗
08/23/2026X08002852-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits54
▸DOB NOWLPC Approval/Permit24
08/13/2026X00701173-I1Open ↗
08/13/2026X00850647-I1Open ↗
08/13/2026X00709107-P1Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION14
05/23/2017220355620Open ↗
04/28/2016220355620Open ↗
04/10/2015220355620Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
11/08/2023220742980Open ↗
10/03/2022220355620Open ↗
07/22/2022220355620Open ↗
Showing 3 of 14 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
10/04/2018210082756Open ↗
03/11/2011210076647Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/09/2023220742980Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X00657984-I1Open ↗
▸Seals & Professional Certifications152
▸DOB NOWProgress Inspector Seal & Signature65
09/23/2026X01127809-I1Open ↗
09/21/2026X00657984-I1Open ↗
09/21/2026X00657984-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/24/2026X00701173-I1Open ↗
08/23/2026X00709252-I1Open ↗
08/23/2026X08002852-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/23/2026X01127809-I1Open ↗
09/21/2026X00657984-I1Open ↗
09/21/2026X00657984-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/12/2015220454933Open ↗
01/27/2014220355620Open ↗
04/29/2011210082756Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/27/2014220355620Open ↗
04/29/2011210082756Open ↗
02/14/2011210066177Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
04/29/2011210082756Open ↗
02/14/2011210066177Open ↗
10/28/2010210076647Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/27/2014220355620Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
07/26/2011220108835Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/13/2026X00657984-P2Open ↗
08/13/2026X00657984-P6Open ↗
Showing 2 of 7 on file for this type
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
08/24/2026X00701173-I1Open ↗
08/23/2026X08002852-P1Open ↗
08/23/2026X08002852-I1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
04/29/2011210082756Open ↗
02/14/2011210066177Open ↗
12/10/2008210082756Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/17/2011220108835Open ↗
01/15/2009210107882Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026X00864781-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/12/2015220454933Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026X00657984-I1Open ↗
▸Approvals, Objections & Sign-offs24
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/14/2023220742980Open ↗
11/14/2023220742980Open ↗
11/09/2023220742980Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
03/17/2011220108835Open ↗
01/15/2009210107882Open ↗
12/10/2008210082756Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/04/2018210082756Open ↗
03/11/2011210076647Open ↗
02/28/2011210066177Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER4
05/23/2017220355620Open ↗
04/28/2016220355620Open ↗
04/28/2016220355620Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
04/10/2015220355620Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/01/2013210082756Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/12/2015220454933Open ↗
03/17/2011220108835Open ↗
01/15/2009210107882Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
05/12/2015220454933Open ↗
01/27/2014220355620Open ↗
03/17/2011220108835Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
04/29/2011210082756Open ↗
02/14/2011210066177Open ↗
▸BISBOROUGH INTAKE FORM1
10/04/2018210082756Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026X01127809-I1Open ↗
08/13/2026X00709107-I1Open ↗
08/13/2026X00709107-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
11/09/2023220742980Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.