2530 INDEPENDENCE AVENUE
BRONX · BIN 2083466
💬 Discuss this project
1961Year Built
6Stories
D4Building Class
R6AZoning
79,296 sfGross Floor Area
70Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 2530 INDEPENDENCE AVE OWNERS CORP. · 33,825 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 13 docs
Bulkhead1p · 1 filing · 10 docs
Floor 4Under Construction5p · 2 filings · 14 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANNON WILL PROJECT DEVELOPMENT506/28/2026
2530 INDEPENDENCE AVE OWNER503/22/2026
GOODMAN MANAGEMENT503/22/2026
2530 INDEPENDENCE AVE203/22/2026
BRONX INDEPENDENCE APTS LLC103/22/2026
PHOENIX SUTTON STR. INC.103/21/2026
PHOENIX103/21/2026
TEANANTS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CORTNEY WALLESTON ARCHITECT, PC306/24/2026
WRG ENGINEERING, P.C.103/26/2025
ASHRAF CORP212/20/2024
BELMONT FREEMAN ARCHITECTS308/22/2024
DYNAMIC STRUCTURES INC.104/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
WRG ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor807/08/2026
ADELPHI RESTORATION CORPGeneral Contractor507/08/2026
BLAZE PLUMBING & HEATINGPlumbing307/08/2026
TAP PLUMBING CORPPlumbing307/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
CITY & SUBURBAN CNSTN GRGeneral Contractor106/28/2026
SINGER, KURTElectrical103/21/2026
FJB CONTRACTING INCElectrical103/21/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
GRAMERCY PLUMBING CORPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CORTNEY WALLESTON ARCHITE3881107/07/2025
WRG ENGINEERING, P.C.4403603/26/2025
Building Lifecycle
All (134)Filed (11)Permit Issued (15)Signed Off (6)Facade (FISP) (18)Violation (60)Inspection (3)Objection (6)Special Inspection (15)
08/25/2026
Signed off — Alteration
ENTRYWAY RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01084504-I1
06/24/2026
Filed — Alteration
Installation of two plumbing fixtures in new powder room
X01315939-P1
03/13/2026
Signed off — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
X01013610-I1
03/12/2026
Permit issued — Suspended Scaffold
X01013610-I1-SC
02/24/2026
Violation issued (HPD, open)
B
02/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/27/2026
Signed off — Alteration
X00991435-I1
01/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/13/2026
Signed off — Alteration
Structural work for concrete balconies replacement
X01015985-I1
01/13/2026
Signed off — Alteration
Structural work for concrete balconies replacement
X01015985-S1
01/12/2026
Permit issued — Sidewalk Shed
X00991435-I1-SH
12/19/2025
Cycle 9 facade report submitted
12/17/2025
Cycle 9 facade report signed — SAFE
12/12/2025
Cycle 9 facade inspection completed
12/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01154805-I1
11/17/2025
Permit issued — Plumbing
X01084504-S2-PL
11/13/2025
Permit issued — Plumbing
X01315939-I1-PL
11/10/2025
Filed — Alteration
Installation of two plumbing fixtures in new powder room
X01315939-I1
08/27/2025
Cycle 9 facade report submitted
08/27/2025
Cycle 9 facade report signed — UNSAFE
08/26/2025
Cycle 9 facade inspection completed
08/13/2025
Permit issued — General Construction
X01015985-I1-GC
08/12/2025
Permit issued — General Construction
X01084504-I1-GC
08/11/2025
Permit issued — Foundation
X01084504-S1-FO
08/08/2025
Permit issued — General Construction
X01249226-I1-GC
08/08/2025
Permit issued — Structural
X01015985-S1-ST
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Scope
07/07/2025
Filed — Alteration
Interior renovation to apartment 4E, non-load bearing partition installation, new finishes a new light fixture installation.
X01249226-I1
07/01/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (HPD, closed)
A
07/01/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (HPD, closed)
B
07/01/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (HPD, closed)
C
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
06/30/2025
Special inspection requirement — Final
Cortney Walleston
03/26/2025
Filed — Alteration
Structural work for concrete balconies replacement
X01015985-S1
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
03/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Winston Garcia
03/25/2025
Special inspection requirement — Structural Steel - Details
Winston Garcia
03/25/2025
Special inspection requirement — Final
Winston Garcia
03/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Winston Garcia
03/10/2025
Permit issued — Suspended Scaffold
X01013610-I1-SC
01/23/2025
Permit issued — Sidewalk Shed
X00991435-I1-SH
12/23/2024
Permit issued — Supported Scaffold
X01154805-I1-SF
12/20/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01154805-I1
09/10/2024
Permit issued — General Construction
X01015985-I1-GC
09/10/2024
Objection resolved — Addressed
08/29/2024
Objection raised — Other
08/22/2024
Filed — Alteration
ENTRYWAY RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01084504-S2
08/22/2024
Filed — Alteration
ENTRYWAY RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01084504-S1
08/19/2024
Filed — Alteration
ENTRYWAY RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01084504-I1
08/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2024
Special inspection requirement — Footing and Foundation
Winston Garcia
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Winston Garcia
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC03/12/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/12/2026
DOB NOWPlumbingSigned-offBLAZE PLUMBING & HEATING11/17/2025
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP11/13/2025
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP08/13/2025
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP08/12/2025
DOB NOWFoundationSigned-offADELPHI RESTORATION CORP08/11/2025
DOB NOWGeneral ConstructionPermit IssuedCITY & SUBURBAN CNSTN GR08/08/2025
DOB NOWStructuralSigned-offADELPHI RESTORATION CORP08/08/2025
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC03/10/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/23/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC12/23/2024
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP09/10/2024
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC03/15/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/30/2024
BISOTISSUEDL & Z RESTORATION CORP05/10/2016
BISEQISSUEDPHOENIX SUTTON STR INC05/10/2016
BISOTISSUEDDUAL FUEL COMPANY LLC02/16/2015
BISPLISSUEDCC CONTROLLED PLBG CO INC10/01/2014
BISPLISSUEDCC CONTROLLED PLBG CO INC08/12/2013
BISFBISSUEDC C CONTROLLED COMBUSTION08/12/2013
BISOTISSUEDTOWER BUILDING GROUP02/09/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/24/2006
BISPLISSUEDMASTERS MECHANICAL PLBG & HTG CO01/18/2006
BISOTISSUEDGKS CONSTRUCTION CORP01/12/2006
BIS—ISSUEDTG CONTRACTING CORP.04/23/1990
1 project · most recent 06/24/2026
Water/Sanitary
FiledStatusContractorScope
06/24/2026Permit IssuedTAP PLUMBING CORPWater/Sanitary
10 projects · most recent 02/01/2026
General Wiring
FiledStatusContractorScope
02/01/2026Permit IssuedCENTRUM ELECTRIC CORPGeneral Wiring
09/16/2024Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
02/01/2024CompleteBOROWIDE ELECT'L CONTR'S—
07/05/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
11/28/2022CompleteCRESCO ELECTRICAL CORP—
01/29/2021CompleteALLTECH ELECL CONTNG CORPGeneral Wiring
01/29/2021Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
01/29/2021Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
10/05/2020CompleteALLTECH ELECL CONTNG CORPGeneral Wiring
11/06/2019CompleteIZZO ELECTRIC INC.General Wiring
1 project · most recent 07/07/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/07/2025Permit IssuedCITY & SUBURBAN CNSTN GRTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/30/2025Fire-Resistant Penetrations and JointsCortney Wallestonspecial
06/30/2025FinalCortney Wallestonprogress
03/26/2025Tenant Protection Plan ComplianceWinston Garciaspecial
03/25/2025Structural Stability – Alterations of existing buildingsWinston Garciaspecial
03/25/2025Structural Steel - DetailsWinston Garciaspecial
03/25/2025FinalWinston Garciaprogress
03/25/2025Concrete - Cast-In-PlaceWinston Garciaspecial
07/24/2024Footing and FoundationWinston Garciaprogress
07/24/2024Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/24/2024FinalWinston Garciaprogress
07/24/2024Fire-Resistance Rated ConstructionWinston Garciaprogress
07/24/2024Tenant Protection Plan ComplianceWinston Garciaspecial
07/24/2024Tenant Protection Plan ComplianceWinston Garciaspecial
07/24/2024FinalWinston Garciaprogress
07/23/2024Tenant Protection Plan ComplianceWinston Garciaspecial
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026X00991435-I1Request digital key ↗
08/21/2026X01013610-I1Request digital key ↗
08/21/2026X01084504-S2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
05/26/2021240265208Open ↗
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
05/10/2016220514147Open ↗
05/06/2016240140584Open ↗
02/13/2015240088221Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/13/2020240265208Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026X00991435-I1Open ↗
08/20/2026X01154805-I1Open ↗
08/19/2026X01249226-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026X01015985-S1Open ↗
09/01/2026X01015985-S1Open ↗
09/01/2026X01015985-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/28/2017220328777Open ↗
04/06/2017220514147Open ↗
03/13/2017240140584Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X01015985-S1Open ↗
08/26/2026X01084504-S1Open ↗
08/26/2026X01084504-S1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
03/30/2015220328777Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
02/13/2015240088221Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
02/13/2015240088221Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/30/2015220328777Open ↗
08/15/2013220328777Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/15/2013220328777Open ↗
▸Trade Schedules & Equipment10
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
11/26/2014220328777Open ↗
11/26/2014220328777Open ↗
11/26/2014220328777Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/24/2015220328777Open ↗
08/15/2013220328777Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
11/26/2014220328777Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/10/2014220328777Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/26/2014220328777Open ↗
▸BISSCHEDULE B - PLUMBING1
08/15/2013220328777Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026X01249226-S1Open ↗
08/19/2026X01249226-I1Open ↗
08/17/2026X01315939-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/02/2019240265208Open ↗
02/02/2016220514147Open ↗
02/13/2015240088221Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X01015985-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/06/2017220514147Open ↗
05/10/2016220514147Open ↗
02/02/2016220514147Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/02/2019240265208Open ↗
02/13/2015240088221Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/06/2017220514147Open ↗
07/23/2015240088221Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/28/2020240265208Open ↗
12/02/2019240265208Open ↗
▸BISNYCECC ANALYSIS1
12/02/2019240265208Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/06/2016240140584Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/28/2020240265208Open ↗
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
07/05/2017220328777Open ↗
07/03/2017220328777Open ↗
06/28/2017220328777Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/28/2017220328777Open ↗
04/06/2017220514147Open ↗
07/23/2015240088221Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01015985-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
12/02/2019240265208Open ↗
07/03/2017220328777Open ↗
06/28/2017220328777Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
03/16/2020240265208Open ↗
06/01/2017220328777Open ↗
03/30/2015220328777Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/02/2019240265208Open ↗
05/06/2016240140584Open ↗
02/13/2015240088221Open ↗
▸BISEFILING COVER SHEET2
02/02/2016220514147Open ↗
08/15/2013220328777Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026X01013610-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01013610-I1Open ↗