← Back
BuildNYC
Two family brick
2534 CRUGER AVENUE
BRONX · BIN 2051342
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6Zoning
2,540 sfGross Floor Area
2Units
Two family brick · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Mechanical Ventilation and Water Main1 filing · 10 docs
Floor 1Mechanical Ventilation and Water Main1 filing · 10 docs
BasementMechanical Ventilation and Water Main1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Quick Builders803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE108/29/2023
Adb Associates304/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing803/21/2026
Building Lifecycle
09/04/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Other
08/29/2023
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00813670-I1
X00813670-S3
04/24/2023
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00813670-I1
X00813670-S1
04/24/2023
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00813670-I1
X00813670-S2
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 08/29/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/29/2023——Heating and Air Conditioning Systems
1 project · most recent 08/29/2023
Sprinkler System
FiledStatusContractorScope
08/29/2023——Sprinkler System
1 project · most recent 08/29/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/29/2023——Gas, Water/Sanitary
1 project · most recent 08/29/2023
FiledStatusContractorScope
08/29/2023———
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/20/2023Energy Code Compliance Inspections—progress
04/20/2023HVAC-R and service water piping design and insulation—energy_progress
04/20/2023Maintenance information—energy_progress
04/20/2023HVAC-R and service water heating system controls—energy_progress
04/20/2023Permanent certificate—energy_progress
04/20/2023HVAC-R and service water heating equipment—energy_progress
01/17/2023Insulation placement and R values—energy_progress
01/17/2023Lighting controls—energy_progress
01/17/2023Fenestration and door U-factor and product ratings—energy_progress
01/17/2023Fenestration air leakage—energy_progress
01/17/2023Lighting in dwelling units—energy_progress
01/17/2023Exterior Insulation and Finish Systems (EIFS)—special
01/17/2023Interior lighting power—energy_progress
01/17/2023Maintenance information—energy_progress
01/17/2023Air barrier - visual inspection—energy_progress
01/17/2023Metering—energy_progress
01/17/2023Fenestration areas—energy_progress
01/17/2023Fire-Resistant Penetrations and Joints—special
01/17/2023Structural Stability – Alterations of existing buildings—special
01/17/2023Energy Code Compliance Inspections—progress
01/17/2023Fire-Resistance Rated Construction—progress
01/17/2023Exterior lighting power—energy_progress
Nothing on file for this building.